How it entered the Observatory
The saved starting points
- Earliest thread file
- Date
- 2026-07-11
- File
- Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md
- Note
- Updated 2026-07-11; its 2025-12-18 and 2026-06-18 FERC entries are the earliest grid entries on the thread.
- Requests
- Id
- K01-016
- When
- 2026-07-11
- Package
- Sovereign Compute
- Her words
- Next I want us to looking to data centers being built on indigenous land in U.S.
- Why
- Completely sidesteps anytype of regulation on the land AND they need a revenue source terribly - gambling and casinos are having a terrible year and the reservations need a funding source - in come the data centers.
- Id
- K02-020
- When
- 2026-07-25
- Package
- Federal Government Website Sweep 2026-07-25
- Her words
- I want this to be comprehensive FULL sweep, not a blanket of forced brevity.
- Why
- We haven't done a real 'government website sweep' in a bit - I'm thinking we should!!
- Id
- K03-060
- When
- 2026-08-20
- Package
- Data Center Federal Legal Spine 2025-2026
- Her words
- Hey - I want to follow the war on data centers a bit more - but more from the lens of the actual legislation and regulation, not any opinions.
- Why
- not stated
- Note
- The July 25 sweep request produced the ledgers that hold the FERC-to-NERC direction (step 11) and the pledge expansion (step 13).
The dated steps
2025-04-01The subcommittee held a hearing titled 'America's AI Moonshot: The Economics of AI, Data Centers, and Power Consumption'.
The subcommittee held a hearing titled 'America's AI Moonshot: The Economics of AI, Data Centers, and Power Consumption'. A formal transcript was later released; the register does not give its publication date.
Who acted: U.S. House of Representatives, Committee on Oversight and Government Reform, Subcommittee on Economic Growth, Energy Policy, and Regulatory Affairs
Stage: discussed
America's AI Moonshot: The Economics of AI, Data Centers, and Power Consumption
2025-12-18FERC issued an order that, as FERC itself later described it in its April 16, 2026 update, requires PJM Interconnection, L.L.C. to put transparent tariff rules in place for large loads co-located with generation.
FERC issued an order that, as FERC itself later described it in its April 16, 2026 update, requires PJM Interconnection, L.L.C. to put transparent tariff rules in place for large loads co-located with generation.
Who acted: Federal Energy Regulatory Commission (FERC)
Stage: ruled
FERC later described its December order as requiring PJM to implement transparent tariff rules for substantial loads co-located with generation.
not given in the files (before April 2026)FERC opened docket RM26-4 with an advance notice of proposed rulemaking (a notice asking for views before any rule is proposed) on large-load interconnection.
FERC opened docket RM26-4 with an advance notice of proposed rulemaking (a notice asking for views before any rule is proposed) on large-load interconnection. The files say it remains at that stage.
Who acted: Federal Energy Regulatory Commission (FERC)
Stage: request for information or comment
RM26-4 remains an advance notice of proposed rulemaking.
2026-01-15S.3682, the Power for the People Act, was introduced and referred to the Senate Energy and Natural Resources Committee.
S.3682, the Power for the People Act, was introduced and referred to the Senate Energy and Natural Resources Committee. It would set up FERC load queues for data centers above 50 MW and assign local transmission-upgrade costs to the data center.
Who acted: U.S. Senate (bill S.3682, Power for the People Act; referred to the Senate Committee on Energy and Natural Resources)
Stage: proposed
| [S.3682](https://www.govinfo.gov/app/details/BILLS-119s3682is), Power for the People Act / [H.R.8241](https://www.govinfo.gov/app/details/BILLS-119hr8241ih) | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C. | Above 50 MW: FERC load queues; preference for deliverable low/no-carbon supply, backup and labor criteria; delay/denial for reliability, adequacy or affordability; local transmission-upgrade costs assigned to data center; state PURPA rate-class consideration. | Introduced and referred only; no queue or allocation rule created. |
FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md
2026-03-05A voluntary Ratepayer Protection Pledge was published, with seven hyperscaler and AI companies as the first signers.
A voluntary Ratepayer Protection Pledge was published, with seven hyperscaler and AI companies as the first signers. It asks companies to build, bring or buy generation, pay for required network upgrades and accept separate rate structures.
Who acted: Publication on whitehouse.gov naming no issuing office; signed by seven hyperscaler and AI companies
Stage: announced
Where the files differ: Kind of instrument: the claim firewall (2026-08-20) calls it 'a proclamation/voluntary policy instrument'; the Executive Office ledger (2026-07-25 sweep) calls it 'a voluntary data-center electricity-cost pledge'; the register records it as a 'voluntary_commitment'. No file gives a proclamation number.
asks participating companies to build, bring or buy generation, cover required network upgrades and accept separate rate structures.
OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md
2026-03-20H.R.8033, the No Harm Data Centers Act, was introduced and referred to House Energy and Commerce.
H.R.8033, the No Harm Data Centers Act, was introduced and referred to House Energy and Commerce. For data centers above 50 MW it would give FERC sole authority over specified retail charges and assign full upgrade costs.
Who acted: U.S. House of Representatives (bill H.R.8033, No Harm Data Centers Act; referred to the House Committee on Energy and Commerce)
Stage: proposed
| [H.R.8033](https://www.govinfo.gov/app/details/BILLS-119hr8033ih), No Harm Data Centers Act | Mar. 20, 2026; House E&C. | Above 50 MW: FERC sole authority over specified retail charges by covered private utilities; full upgrade-cost allocation; $10M/day penalties; NDA limits; National Academies study. | Introduced and referred only. |
FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md
2026-04-09H.R.8241, the House companion to S.3682, was introduced and referred to House Energy and Commerce.
H.R.8241, the House companion to S.3682, was introduced and referred to House Energy and Commerce.
Who acted: U.S. House of Representatives (bill H.R.8241, House companion of the Power for the People Act; referred to the House Committee on Energy and Commerce)
Stage: proposed
| [S.3682](https://www.govinfo.gov/app/details/BILLS-119s3682is), Power for the People Act / [H.R.8241](https://www.govinfo.gov/app/details/BILLS-119hr8241ih) | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C. | Above 50 MW: FERC load queues; preference for deliverable low/no-carbon supply, backup and labor criteria; delay/denial for reliability, adequacy or affordability; local transmission-upgrade costs assigned to data center; state PURPA rate-class consideration. | Introduced and referred only; no queue or allocation rule created. |
FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md
2026-04 (April 16 per the title of the FERC page the Sovereign Compute timeline links)FERC issued an April order on the large-load docket that committed the Commission to act; the FERC page it is linked from is titled as an April 16, 2026 large-load update and its address says FERC would act on the large-load interconnection docket in June 2026.
FERC issued an April order on the large-load docket that committed the Commission to act; the FERC page it is linked from is titled as an April 16, 2026 large-load update and its address says FERC would act on the large-load interconnection docket in June 2026.
Who acted: Federal Energy Regulatory Commission (FERC)
Stage: scheduled
FERC's April order committed the Commission to act, and its June 18 action opened six separate section 206 proceedings for the regional grid operators to defend or reform their tariffs.
2026-06-18 Turning pointFERC opened six separate Federal Power Act section 206 proceedings (show-cause orders), one for each regional grid operator under its jurisdiction: PJM, MISO, SPP, CAISO, ISO-NE and NYISO.
FERC opened six separate Federal Power Act section 206 proceedings (show-cause orders), one for each regional grid operator under its jurisdiction: PJM, MISO, SPP, CAISO, ISO-NE and NYISO. Each operator and its transmission owners got 60 days to justify their existing tariffs or file reforms on large-load study and interconnection, cost recovery and protection against speculative load, cost shifting, co-location, flexible service and forecasting.
Who acted: Federal Energy Regulatory Commission (FERC)
Stage: received or under consideration by the deciding body
Where the files differ: Wording: the Federal Science Operating System factual spine heads it as one 'six-grid-operator speed-to-power proceeding'; the other files count six proceedings. No file disagrees on the date.
On June 18, 2026, FERC opened six separate Federal Power Act section 206 proceedings covering every RTO/ISO under its jurisdiction.
2026-07-13H.R.9655, the FAIR Data Act, was introduced and referred to House Energy and Commerce.
H.R.9655, the FAIR Data Act, was introduced and referred to House Energy and Commerce. It would set a Public Utility Regulatory Policies Act standard barring recovery of costs of data centers above 75 MW from residential and small-business customers, with FERC reports.
Who acted: U.S. House of Representatives (bill H.R.9655, FAIR Data Act; referred to the House Committee on Energy and Commerce)
Stage: proposed
| [H.R.9655](https://www.govinfo.gov/app/details/BILLS-119hr9655ih), FAIR Data Act | July 13, 2026; House E&C. | PURPA standard barring recovery of >75 MW data-center costs from residential/small-business customers; state consideration and FERC reports. | Introduced and referred only. |
FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md
2026-07-16 Turning pointAt its July 16 meeting FERC, in docket RD26-7-000 under Federal Power Act section 215(d)(5), ordered NERC to submit reliability standards and registration changes for computational load by December 31, 2026.
At its July 16 meeting FERC, in docket RD26-7-000 under Federal Power Act section 215(d)(5), ordered NERC to submit reliability standards and registration changes for computational load by December 31, 2026.
Who acted: Federal Energy Regulatory Commission (FERC), directing the North American Electric Reliability Corporation (NERC)
Stage: approved or adopted
RD26-7-000 orders NERC under FPA §215(d)(5) to submit computational-load standards and registration changes by Dec 31.
2026-07-16EPA signed an interpretive memo saying that generators serving an adjacent private data center with no connection to the larger grid are, on that fact pattern, not subject to the Acid Rain Program.
EPA signed an interpretive memo saying that generators serving an adjacent private data center with no connection to the larger grid are, on that fact pattern, not subject to the Acid Rain Program. A later grid link may bring the program back, and the memo leaves every other Clean Air Act program untouched.
Who acted: U.S. Environmental Protection Agency (EPA)
Stage: published
Fact-dependent interpretation that truly islanded units serving one private consumer generally fall outside ARP definitions.
2026-07-23A White House release widened the voluntary pledge beyond the seven March signers to utilities, cooperatives, data-center developers and 23 governors.
A White House release widened the voluntary pledge beyond the seven March signers to utilities, cooperatives, data-center developers and 23 governors. The initiative page says the coalition represents 80 percent of electricity delivered to U.S. homes and businesses.
Who acted: Publication on whitehouse.gov (release titled 'President Trump's Ratepayer Protection Pledge Secures American AI Dominance, Protects Consumers'), naming no issuing office
Stage: announced
The Jul 23 White House release and initiative surface expand a voluntary data-center electricity-cost pledge beyond the seven March hyperscaler/AI company signers to utilities, cooperatives, data-center developers and 23 governors.
2026-08-17The 60 days FERC gave the six grid operators to justify their tariffs or file reforms ran out.
The 60 days FERC gave the six grid operators to justify their tariffs or file reforms ran out. The notes record no result as of 2026-11-11.
Who acted: Six regional grid operators (PJM, MISO, SPP, CAISO, ISO-NE, NYISO) and their transmission owners
Stage: scheduled
Date note: Worked out by counting 60 days from 2026-06-18 (FERC opened the six section 206 proceedings); no file states this date.
Each grid operator and its transmission owners received 60 days to justify existing tariffs or file reforms.
2026-10-09DOE filed at FERC a notice of intervention and a statement of position supporting FERC's recommendation that PJM revise its tariff provisions for reliability-backstop procurement and large-load cost allocation.
DOE filed at FERC a notice of intervention and a statement of position supporting FERC's recommendation that PJM revise its tariff provisions for reliability-backstop procurement and large-load cost allocation.
Who acted: U.S. Department of Energy (DOE)
Stage: stated by the body
DOE filed a notice of intervention and statement of position supporting FERC's recommendation that PJM revise tariff provisions for reliability-backstop procurement and large-load cost allocation.
2026-11-19FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads.
FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads.
Who acted: FERC
Stage: authorized and effective
FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads.
FERC_NIPSCO_AMAZON_ALPHABET_AFFILIATE_POWER_ORDER_2026-11-21.md
2026-11-19The Senate's exact roll-call record reports passage of H.R.
The Senate's exact roll-call record reports passage of H.R.
Who acted: United States Senate
Stage: passed one chamber
The Senate's exact roll-call record reports passage of H.R.
Where it stands
The November 21, 2026 returns record FERC’s November 19 authorization of the NIPSCO/NiSource GenCo affiliate PPAs for Amazon and Alphabet loads, effective on issuance, and the Senate’s November 19 passage of H.R.2347 as amended. The older snapshots below retain their own dates and proceedings. At the November 6 snapshot that checks the federal grid record (November 6, 2026), FERC's six section 206 proceedings are open with no merits order recorded; replies are due November 16 (five operators) and November 20 (SPP). RM26-4 is at advance-notice stage with no proposed or final rule recorded (October 5 check). NERC's computational-load standards are due December 31, 2026, with no filing recorded. DOE's October 9 filing supports a FERC recommendation on PJM cost allocation; no PJM tariff filing or FERC order on it is recorded. The four bills are introduced and referred as of August 20. The Ratepayer Protection Pledge is voluntary, with signers added July 23. The latest file on the thread (November 11, 2026) holds grid-operator figures for ERCOT and PJM and no federal step.
What comes next
- When
- 2026-11-16
- What
- Replies due in the section 206 proceedings for five grid operators (the file says "five RTO/ISOs" without naming them).
- Stage
- scheduled
- Files
- Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md
- When
- 2026-11-20
- What
- Replies due in the SPP section 206 proceeding.
- Stage
- scheduled
- Files
- Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md
- When
- 2026-12-31
- What
- NERC due to submit computational-load reliability standards and registration changes (RD26-7-000).
- Stage
- scheduled
- Files
- Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md
What the notes do not record
- The notes do not record any filing by a grid operator at the 60-day mark, any reply, or any FERC merits order in the six proceedings.
- The docket numbers of five of the six June 18 orders (only NYISO EL26-69-000 is given), and the docket of the December 2025 PJM order.
- The date the RM26-4 advance notice issued, and the text of the April 2026 order.
- The date, docket and form of the FERC recommendation on PJM that DOE supported on October 9.
- The notes do not record any NERC drafting step on computational-load standards.
- The notes do not record any data center connected, any tariff changed, or any bill moved past referral after any step here.
- The notes do not record a proclamation or executive-order number for the Ratepayer Protection Pledge, or any enforcement mechanism for it.
What it touches
- Department of Energy emergency orders under Federal Power Act section 202(c)
The batch 3 story records that DOE order 202-26-45 (September 17, 2026) authorized backup generation at large loads without naming them, and that Executive Order 14262's purpose text cites AI data centers.
- Executive Order 14318 (data-center permitting and federal land) and what agencies did under it
Executive Order 14318 (July 23, 2025) defines a covered Data Center Project as more than 100 MW of new AI-related load and directs permitting and federal-land steps; the order map lists no grid-connection instruction in it.
- Texas grid operator (ERCOT) Batch Zero: Texas's large-load (75 MW+) connection process, the audit-driven energization pause and December 2026 final classifications
The Public Utility Commission of Texas approved ERCOT's Batch Zero large-load process on June 18, 2026, the day of FERC's orders. ERCOT reports are due December 10, 2026.
- Federal data-center legislation in the 119th Congress
The four grid-cost bills are rows of that thread's registry.
- Department of Energy (DOE) Speed to Power grid funding selections
DOE's Speed to Power page inventories large-load, transmission and technical-assistance actions; DOE announced Speed to Power grid funding on September 24, 2026.
- Executive Order 14421: national emergency to secure the bulk-power system and the Energy Secretary's 120/180-day duties
Executive Order 14421 (signed August 26, 2026) declared a national emergency over foreign bulk-power equipment; no file ties it to data-center load.
- How big are AI capital-spending plans, and how will the financing gap be filled?
Register tie ("the spending").
Graphics and studies
- How U.S. Interest Rates Are Made
- National Security Science and Technology Strategy: technologies and companies
- National Security Science and Technology Strategy: cross-sector dependencies
- National Security Science and Technology Strategy: company profiles
- National Security Science and Technology Strategy: programs and contenders
- National Security Science and Technology Strategy: the science plan
- The Fed constellation
- The AI infrastructure buildout
- AI helps run turbines, but people still make the big calls
- No federal data-center ban, just scattered permits and leases
- The Fed is many legal bodies, and its building cost doubled
- The federal restart found operating checks, joined bank orders and new legal limits
- Which federal source pages were actually usable in August 2026
- Winning a federal tech award is not the same as being accepted
- Which companies could build the national-security tech plan, and who signs off
- Data centers where tribal, state and federal power meet
- What's really inside the 'trillions coming in' investment claims