  "id": "ai-datacenter-power",
  "title": "Federal handling of artificial intelligence data-center load on the electric grid",
  "one_line": "What federal bodies did, as the library records it from April 2025 to November 2026, about connecting large data-center loads to the grid and who pays: a House hearing; FERC's December 2025 PJM co-location order, its RM26-4 advance notice, its April 2026 commitment to act and its six June 18, 2026 section 206 show-cause proceedings; FERC's July 16, 2026 direction to NERC on computational-load standards; an EPA memo on generators not connected to the grid; the voluntary Ratepayer Protection Pledge; four bills; and DOE's October 2026 filing on PJM cost allocation.",
  "system": "electric-grid-regulation",
  "threads_folded_in": [
    {
      "id": "ferc-large-load-proceedings",
      "how": "Folded in whole: steps 8, 9 and 14 and the November 16 and 20 reply dates."
    },
    {
      "id": "powering-datacenters-authorities",
      "how": "Folded in as a source: its one file (the Federal Science Operating System control-surface map) is cited on step 9 and under foundation; it records no dated step of its own."
    }
  ],
  "threads_not_folded_in": [
    {
      "id": "eo-14318-datacenter-permitting",
      "why": "A different action (federal permitting and federal land). The order map lists no instruction in Executive Order 14318 about grid connection or cost allocation; its Sec. 1 states a priority for AI data centers and their power infrastructure. Kept under touches."
    },
    {
      "id": "doe-202c-orders",
      "why": "Finished story in batch 3. Met under touches, not repeated."
    },
    {
      "id": "ercot-batch-zero",
      "why": "A Texas process (Public Utility Commission of Texas and ERCOT), not a step in a federal action. Kept under touches and left_out."
    },
    {
      "id": "datacenter-legislation",
      "why": "Only the four bills about FERC load queues and data-center grid costs are taken in as steps (4, 6, 7, 10); the rest of that thread stays there."
    }
  ],
  "how_it_entered": {
    "earliest_thread_file": {
      "date": "2026-07-11",
      "file": "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md",
      "note": "Updated 2026-07-11; its 2025-12-18 and 2026-06-18 FERC entries are the earliest grid entries on the thread."
    },
    "requests": [
      {
        "id": "K01-016",
        "when": "2026-07-11",
        "package": "Sovereign Compute",
        "her_words": "Next I want us to looking to data centers being built on indigenous land in U.S.",
        "why": "Completely sidesteps anytype of regulation on the land AND they need a revenue source terribly - gambling and casinos are having a terrible year and the reservations need a funding source - in come the data centers."
      },
      {
        "id": "K02-020",
        "when": "2026-07-25",
        "package": "Federal Government Website Sweep 2026-07-25",
        "her_words": "I want this to be comprehensive FULL sweep, not a blanket of forced brevity.",
        "why": "We haven't done a real 'government website sweep' in a bit - I'm thinking we should!!"
      },
      {
        "id": "K03-060",
        "when": "2026-08-20",
        "package": "Data Center Federal Legal Spine 2025-2026",
        "her_words": "Hey - I want to follow the war on data centers a bit more - but more from the lens of the actual legislation and regulation, not any opinions.",
        "why": "not stated"
      }
    ],
    "note": "The July 25 sweep request produced the ledgers that hold the FERC-to-NERC direction (step 11) and the pledge expansion (step 13)."
  },
  "actors": [
    {
      "name": "Federal Energy Regulatory Commission (FERC)",
      "role": "Independent federal regulator. Issued the December 2025 PJM co-location order, the RM26-4 advance notice, the April 2026 order committing to act, the six June 18, 2026 section 206 show-cause orders and the July 16, 2026 RD26-7-000 direction to NERC."
    },
    {
      "name": "North American Electric Reliability Corporation (NERC)",
      "role": "Directed by FERC to submit computational-load reliability standards and registration changes by December 31, 2026."
    },
    {
      "name": "PJM Interconnection, L.L.C. (PJM); MISO; Southwest Power Pool, Inc. (SPP); CAISO; ISO-NE; NYISO",
      "role": "The six regional grid operators addressed by the June 18 orders, with their transmission owners. PJM is also the subject of the December 2025 order and of the cost-allocation matter DOE filed on. The files do not spell out MISO, CAISO, ISO-NE or NYISO."
    },
    {
      "name": "U.S. Department of Energy (DOE)",
      "role": "Filed a notice of intervention and statement of position at FERC (October 9, 2026) supporting FERC's recommendation on PJM."
    },
    {
      "name": "U.S. Environmental Protection Agency (EPA)",
      "role": "Signed the July 16, 2026 interpretive memo on generators not connected to the grid and the Acid Rain Program."
    },
    {
      "name": "whitehouse.gov publications (no issuing office named)",
      "role": "Published the Ratepayer Protection Pledge (March 2026) and the July 23, 2026 release widening it. The register names the body as \"White House and participating companies\"; no file names an office."
    },
    {
      "name": "U.S. Senate and House of Representatives",
      "role": "S.3682, H.R.8033, H.R.8241 and H.R.9655 introduced and referred (sponsors not named in the files). House Oversight Subcommittee on Economic Growth, Energy Policy, and Regulatory Affairs held the April 1, 2025 hearing."
    }
  ],
  "steps": [
    {
      "n": 1,
      "strand": "Congress",
      "date": "2025-04-01",
      "date_exactness": "exact day",
      "body": "U.S. House of Representatives, Committee on Oversight and Government Reform, Subcommittee on Economic Growth, Energy Policy, and Regulatory Affairs",
      "what": "The subcommittee held a hearing titled 'America's AI Moonshot: The Economics of AI, Data Centers, and Power Consumption'. A formal transcript was later released; the register does not give its publication date.",
      "stage": "discussed",
      "status_word": "held (occurred)",
      "path": "oversight",
      "rests_on": "official record, linked (committee hearing page and House transcript PDF)",
      "quote": {
        "text": "America's AI Moonshot: The Economics of AI, Data Centers, and Power Consumption",
        "file": "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv (record oversight-site-2025-04-01-america-s-ai-moonshot-the-economics-of-ai-data-centers-and-power-consumption)"
      },
      "files": [
        "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv"
      ],
      "register_records": [
        "oversight-site-2025-04-01-america-s-ai-moonshot-the-economics-of-ai-data-centers-and-power-consumption",
        "house.go05:formal-transcript-released:118078"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "step",
      "where_in_the_system": "(g) What oversight bodies add: GAO, inspectors general, congressional letters, subpoenas and reports",
      "thesis_words": [],
      "what_moves": "nothing moves; a hearing on the record",
      "note": ""
    },
    {
      "n": 2,
      "strand": "FERC and PJM co-location",
      "date": "2025-12-18",
      "date_exactness": "exact day",
      "body": "Federal Energy Regulatory Commission (FERC)",
      "what": "FERC issued an order that, as FERC itself later described it in its April 16, 2026 update, requires PJM Interconnection, L.L.C. to put transparent tariff rules in place for large loads co-located with generation.",
      "stage": "ruled",
      "status_word": "ordered (Occurred, per the file)",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (FERC April 16, 2026 large-load update, which describes the December order)",
      "quote": {
        "text": "FERC later described its December order as requiring PJM to implement transparent tariff rules for substantial loads co-located with generation.",
        "file": "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md"
      },
      "files": [
        "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece",
      "thesis_words": [],
      "what_moves": "rule-writing duty placed on PJM (tariff rules for co-located large loads)",
      "note": "The library describes this order through FERC's later account (April 16, 2026); it gives no docket number, and holds no record of PJM's compliance filing as of 2026-11-11."
    },
    {
      "n": 3,
      "strand": "FERC national large-load docket (RM26-4)",
      "date": "not given in the files (before April 2026)",
      "date_exactness": "no date in any file",
      "body": "Federal Energy Regulatory Commission (FERC)",
      "what": "FERC opened docket RM26-4 with an advance notice of proposed rulemaking (a notice asking for views before any rule is proposed) on large-load interconnection. The files say it remains at that stage.",
      "stage": "request for information or comment",
      "status_word": "advance notice of proposed rulemaking (ANOPR); 'pre-proposal record'",
      "path": "agency-rule",
      "rests_on": "official record, linked (FERC RM26-4 docket page)",
      "quote": {
        "text": "RM26-4 remains an advance notice of proposed rulemaking.",
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_CLAIM_FIREWALL_AND_WATCHBOARD_2026-08-20.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule: from agenda and request for information through proposal, comment, OIRA review, final rule, publication and effective date, and the faster routes",
      "thesis_words": [],
      "what_moves": "nothing yet; a record is gathered",
      "note": ""
    },
    {
      "n": 4,
      "strand": "Congress",
      "date": "2026-01-15",
      "date_exactness": "exact day",
      "body": "U.S. Senate (bill S.3682, Power for the People Act; referred to the Senate Committee on Energy and Natural Resources)",
      "what": "S.3682, the Power for the People Act, was introduced and referred to the Senate Energy and Natural Resources Committee. It would set up FERC load queues for data centers above 50 MW and assign local transmission-upgrade costs to the data center.",
      "stage": "proposed",
      "status_word": "introduced and referred only",
      "path": "statute",
      "rests_on": "official record, linked (govinfo bill text)",
      "quote": {
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "text": "| [S.3682](https://www.govinfo.gov/app/details/BILLS-119s3682is), Power for the People Act / [H.R.8241](https://www.govinfo.gov/app/details/BILLS-119hr8241ih) | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C. | Above 50 MW: FERC load queues; preference for deliverable low/no-carbon supply, backup and labor criteria; delay/denial for reliability, adequacy or affordability; local transmission-upgrade costs assigned to data center; state PURPA rate-class consideration. | Introduced and referred only; no queue or allocation rule created. |"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(e) Statute: introduced, referred, heard, marked up, ordered reported, reported, passed one chamber, passed both, presented, signed, enacted, effective, implemented by rules",
      "thesis_words": [],
      "what_moves": "",
      "note": "State as of the registry's August 20, 2026 cutoff; the library holds no later check of this bill.",
      "quote_anchor_repaired_2026-11-18": {
        "was": {
          "text": "S.3682, Power for the People Act / H.R.8241 | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C.",
          "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
        },
        "reason": "Use the exact linked table row; historical fact and stage unchanged."
      }
    },
    {
      "n": 5,
      "strand": "Ratepayer Protection Pledge",
      "date": "2026-03-05",
      "date_exactness": "register object date; the research file says only 'March'",
      "body": "Publication on whitehouse.gov naming no issuing office; signed by seven hyperscaler and AI companies",
      "what": "A voluntary Ratepayer Protection Pledge was published, with seven hyperscaler and AI companies as the first signers. It asks companies to build, bring or buy generation, pay for required network upgrades and accept separate rate structures.",
      "stage": "announced",
      "status_word": "voluntary commitment",
      "path": "presidential-instrument",
      "rests_on": "the body's own statement, linked (whitehouse.gov pledge page)",
      "quote": {
        "file": "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md",
        "text": "asks participating companies to build, bring or buy generation, cover required\nnetwork upgrades and accept separate rate structures."
      },
      "files": [
        "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md",
        "Federal Government Website Sweep 2026-07-25/Executive Office Wave 2/EXECUTIVE_OFFICE_WAVE_2_PRIMARY_OBJECT_LEDGER.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_CLAIM_FIREWALL_AND_WATCHBOARD_2026-08-20.md",
        "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv"
      ],
      "register_records": [
        "ai-transition-ratepayer-protection-pledge"
      ],
      "disagreement": "Kind of instrument: the claim firewall (2026-08-20) calls it 'a proclamation/voluntary policy instrument'; the Executive Office ledger (2026-07-25 sweep) calls it 'a voluntary data-center electricity-cost pledge'; the register records it as a 'voluntary_commitment'. No file gives a proclamation number.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(d) Presidential instrument: executive order, memorandum, proclamation, determination; what it directs, to whom, by when; publication; how agencies carry it out or do not",
      "thesis_words": [],
      "what_moves": "nothing by law; companies state a commitment",
      "note": "",
      "quote_anchor_repaired_2026-11-18": {
        "was": {
          "text": "The 2026 Ratepayer Protection Pledge asks participating companies to build, bring or buy generation, cover required network upgrades and accept separate rate structures.",
          "file": "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md"
        },
        "reason": "Use the exact passage after its Markdown link; historical fact and stage unchanged."
      }
    },
    {
      "n": 6,
      "strand": "Congress",
      "date": "2026-03-20",
      "date_exactness": "exact day",
      "body": "U.S. House of Representatives (bill H.R.8033, No Harm Data Centers Act; referred to the House Committee on Energy and Commerce)",
      "what": "H.R.8033, the No Harm Data Centers Act, was introduced and referred to House Energy and Commerce. For data centers above 50 MW it would give FERC sole authority over specified retail charges and assign full upgrade costs.",
      "stage": "proposed",
      "status_word": "introduced and referred only",
      "path": "statute",
      "rests_on": "official record, linked (govinfo bill text)",
      "quote": {
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "text": "| [H.R.8033](https://www.govinfo.gov/app/details/BILLS-119hr8033ih), No Harm Data Centers Act | Mar. 20, 2026; House E&C. | Above 50 MW: FERC sole authority over specified retail charges by covered private utilities; full upgrade-cost allocation; $10M/day penalties; NDA limits; National Academies study. | Introduced and referred only. |"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(e) Statute: introduced, referred, heard, marked up, ordered reported, reported, passed one chamber, passed both, presented, signed, enacted, effective, implemented by rules",
      "thesis_words": [],
      "what_moves": "",
      "note": "State as of the registry's August 20, 2026 cutoff.",
      "quote_anchor_repaired_2026-11-18": {
        "was": {
          "text": "H.R.8033, No Harm Data Centers Act | Mar. 20, 2026; House E&C.",
          "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
        },
        "reason": "Use the exact linked table row; historical fact and stage unchanged."
      }
    },
    {
      "n": 7,
      "strand": "Congress",
      "date": "2026-04-09",
      "date_exactness": "exact day",
      "body": "U.S. House of Representatives (bill H.R.8241, House companion of the Power for the People Act; referred to the House Committee on Energy and Commerce)",
      "what": "H.R.8241, the House companion to S.3682, was introduced and referred to House Energy and Commerce.",
      "stage": "proposed",
      "status_word": "introduced and referred only",
      "path": "statute",
      "rests_on": "official record, linked (govinfo bill text)",
      "quote": {
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "text": "| [S.3682](https://www.govinfo.gov/app/details/BILLS-119s3682is), Power for the People Act / [H.R.8241](https://www.govinfo.gov/app/details/BILLS-119hr8241ih) | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C. | Above 50 MW: FERC load queues; preference for deliverable low/no-carbon supply, backup and labor criteria; delay/denial for reliability, adequacy or affordability; local transmission-upgrade costs assigned to data center; state PURPA rate-class consideration. | Introduced and referred only; no queue or allocation rule created. |"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(e) Statute: introduced, referred, heard, marked up, ordered reported, reported, passed one chamber, passed both, presented, signed, enacted, effective, implemented by rules",
      "thesis_words": [],
      "what_moves": "",
      "note": "State as of the registry's August 20, 2026 cutoff.",
      "quote_anchor_repaired_2026-11-18": {
        "was": {
          "text": "S.3682, Power for the People Act / H.R.8241 | S. Jan. 15, 2026, Senate ENR; H. Apr. 9, House E&C.",
          "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
        },
        "reason": "Use the exact linked table row; historical fact and stage unchanged."
      }
    },
    {
      "n": 8,
      "strand": "FERC national large-load docket (RM26-4)",
      "date": "2026-04 (April 16 per the title of the FERC page the Sovereign Compute timeline links)",
      "date_exactness": "month in the research file; day from a linked page title only",
      "body": "Federal Energy Regulatory Commission (FERC)",
      "what": "FERC issued an April order on the large-load docket that committed the Commission to act; the FERC page it is linked from is titled as an April 16, 2026 large-load update and its address says FERC would act on the large-load interconnection docket in June 2026.",
      "stage": "scheduled",
      "status_word": "committed to act",
      "path": "agency-rule",
      "rests_on": "the body's own statement, linked (FERC April 16, 2026 large-load update; FERC major orders page)",
      "quote": {
        "text": "FERC's April order committed the Commission to act, and its June 18 action opened six separate section 206 proceedings for the regional grid operators to defend or reform their tariffs.",
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
        "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule: from agenda and request for information through proposal, comment, OIRA review, final rule, publication and effective date, and the faster routes",
      "thesis_words": [],
      "what_moves": "",
      "note": "The files give no docket number for the April order beyond RM26-4 and no exact day other than the linked page title."
    },
    {
      "n": 9,
      "strand": "FERC six section 206 proceedings",
      "date": "2026-06-18",
      "date_exactness": "exact day",
      "body": "Federal Energy Regulatory Commission (FERC)",
      "what": "FERC opened six separate Federal Power Act section 206 proceedings (show-cause orders), one for each regional grid operator under its jurisdiction: PJM, MISO, SPP, CAISO, ISO-NE and NYISO. Each operator and its transmission owners got 60 days to justify their existing tariffs or file reforms on large-load study and interconnection, cost recovery and protection against speculative load, cost shifting, co-location, flexible service and forecasting.",
      "stage": "received or under consideration by the deciding body",
      "status_word": "opened (orders to justify or reform); 'instituted proceeding'",
      "path": "agency-order-or-decision",
      "rests_on": "official record, linked (FERC June 18, 2026 announcement; NYISO order EL26-69-000)",
      "quote": {
        "text": "On June 18, 2026, FERC opened six separate Federal Power Act section 206 proceedings covering every RTO/ISO under its jurisdiction.",
        "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
        "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_CONTROL_SURFACE_MAP.md",
        "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md",
        "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv"
      ],
      "register_records": [
        "ai-transition-ferc-large-loads"
      ],
      "disagreement": "Wording: the Federal Science Operating System factual spine heads it as one 'six-grid-operator speed-to-power proceeding'; the other files count six proceedings. No file disagrees on the date.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece",
      "thesis_words": [],
      "what_moves": "burden placed on six grid operators and their transmission owners to justify or reform tariffs; no tariff changed",
      "note": "The NYISO order (EL26-69-000, paragraphs 85-91) preliminarily considers minimum contributions and financial security when requested load underdelivers or does not materialize, and expects such payments to be credited to transmission revenue requirements. The refresh file adds: 'these positions do not by themselves establish final tariff terms.' The library gives no docket number for the other five orders."
    },
    {
      "n": 10,
      "strand": "Congress",
      "date": "2026-07-13",
      "date_exactness": "exact day",
      "body": "U.S. House of Representatives (bill H.R.9655, FAIR Data Act; referred to the House Committee on Energy and Commerce)",
      "what": "H.R.9655, the FAIR Data Act, was introduced and referred to House Energy and Commerce. It would set a Public Utility Regulatory Policies Act standard barring recovery of costs of data centers above 75 MW from residential and small-business customers, with FERC reports.",
      "stage": "proposed",
      "status_word": "introduced and referred only",
      "path": "statute",
      "rests_on": "official record, linked (govinfo bill text)",
      "quote": {
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
        "text": "| [H.R.9655](https://www.govinfo.gov/app/details/BILLS-119hr9655ih), FAIR Data Act | July 13, 2026; House E&C. | PURPA standard barring recovery of >75 MW data-center costs from residential/small-business customers; state consideration and FERC reports. | Introduced and referred only. |"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(e) Statute: introduced, referred, heard, marked up, ordered reported, reported, passed one chamber, passed both, presented, signed, enacted, effective, implemented by rules",
      "thesis_words": [],
      "what_moves": "",
      "note": "State as of the registry's August 20, 2026 cutoff.",
      "quote_anchor_repaired_2026-11-18": {
        "was": {
          "text": "H.R.9655, FAIR Data Act | July 13, 2026; House E&C.",
          "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
        },
        "reason": "Use the exact linked table row; historical fact and stage unchanged."
      }
    },
    {
      "n": 11,
      "strand": "Reliability standards for computational load (NERC)",
      "date": "2026-07-16",
      "date_exactness": "Commission meeting day",
      "body": "Federal Energy Regulatory Commission (FERC), directing the North American Electric Reliability Corporation (NERC)",
      "what": "At its July 16 meeting FERC, in docket RD26-7-000 under Federal Power Act section 215(d)(5), ordered NERC to submit reliability standards and registration changes for computational load by December 31, 2026.",
      "stage": "approved or adopted",
      "status_word": "binding direction; standards not yet filed, approved, effective or complied with",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (FERC July 2026 Commission meeting summary)",
      "quote": {
        "text": "RD26-7-000 orders NERC under FPA §215(d)(5) to submit computational-load standards and registration changes by Dec 31.",
        "file": "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      },
      "files": [
        "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece",
      "thesis_words": [],
      "what_moves": "a standards-writing duty with a date placed on NERC",
      "note": ""
    },
    {
      "n": 12,
      "strand": "Power not connected to the grid",
      "date": "2026-07-16",
      "date_exactness": "exact day signed",
      "body": "U.S. Environmental Protection Agency (EPA)",
      "what": "EPA signed an interpretive memo saying that generators serving an adjacent private data center with no connection to the larger grid are, on that fact pattern, not subject to the Acid Rain Program. A later grid link may bring the program back, and the memo leaves every other Clean Air Act program untouched.",
      "stage": "published",
      "status_word": "interpretive guidance (signed)",
      "path": "staff-position",
      "rests_on": "official record, linked (EPA memo PDF)",
      "quote": {
        "text": "Fact-dependent interpretation that truly islanded units serving one private consumer generally fall outside ARP definitions.",
        "file": "Data Center Federal Legal Spine 2025-2026/EO_14318_IMPLEMENTATION_RETURN_AUDIT_2026-08-20.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/EO_14318_IMPLEMENTATION_RETURN_AUDIT_2026-08-20.md",
        "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md",
        "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGAL_SPINE_2025-2026.md",
        "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv"
      ],
      "register_records": [
        "EPA-CAA-ISLANDED-ARP"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule: guidance issued outside rulemaking",
      "thesis_words": [],
      "what_moves": "nothing by law; EPA states how it reads one program",
      "note": ""
    },
    {
      "n": 13,
      "strand": "Ratepayer Protection Pledge",
      "date": "2026-07-23",
      "date_exactness": "exact day",
      "body": "Publication on whitehouse.gov (release titled 'President Trump's Ratepayer Protection Pledge Secures American AI Dominance, Protects Consumers'), naming no issuing office",
      "what": "A White House release widened the voluntary pledge beyond the seven March signers to utilities, cooperatives, data-center developers and 23 governors. The initiative page says the coalition represents 80 percent of electricity delivered to U.S. homes and businesses.",
      "stage": "announced",
      "status_word": "expanded (voluntary)",
      "path": "presidential-instrument",
      "rests_on": "the body's own statement, linked (July 23 release; initiative and signatory page)",
      "quote": {
        "text": "The Jul 23 White House release and initiative surface expand a voluntary data-center electricity-cost pledge beyond the seven March hyperscaler/AI company signers to utilities, cooperatives, data-center developers and 23 governors.",
        "file": "Federal Government Website Sweep 2026-07-25/Executive Office Wave 2/EXECUTIVE_OFFICE_WAVE_2_PRIMARY_OBJECT_LEDGER.md"
      },
      "files": [
        "Federal Government Website Sweep 2026-07-25/Executive Office Wave 2/EXECUTIVE_OFFICE_WAVE_2_PRIMARY_OBJECT_LEDGER.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(d) Presidential instrument: executive order, memorandum, proclamation, determination; what it directs, to whom, by when; publication; how agencies carry it out or do not",
      "thesis_words": [],
      "what_moves": "nothing by law; more signers state a commitment",
      "note": ""
    },
    {
      "n": 14,
      "strand": "FERC six section 206 proceedings",
      "date": "2026-08-17",
      "date_exactness": "worked out by this reader: 60 days from 2026-06-18; no file states the day",
      "body": "Six regional grid operators (PJM, MISO, SPP, CAISO, ISO-NE, NYISO) and their transmission owners",
      "what": "The 60 days FERC gave the six grid operators to justify their tariffs or file reforms ran out. The notes record no result as of 2026-11-11.",
      "stage": "scheduled",
      "status_word": "deadline (60 days)",
      "path": "agency-order-or-decision",
      "rests_on": "official record, linked (FERC June 18, 2026 announcement)",
      "quote": {
        "text": "Each grid operator and its transmission owners received 60 days to justify existing tariffs or file reforms.",
        "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece",
      "thesis_words": [],
      "what_moves": "",
      "note": "A November 6 file gives replies due November 16 (five operators) and November 20 (SPP); no file says how those dates relate to the 60 days.",
      "date_note": "Worked out by counting 60 days from 2026-06-18 (FERC opened the six section 206 proceedings); no file states this date."
    },
    {
      "n": 15,
      "strand": "FERC and PJM cost allocation",
      "date": "2026-10-09",
      "date_exactness": "register native date; the research file gives only the week October 3-12",
      "body": "U.S. Department of Energy (DOE)",
      "what": "DOE filed at FERC a notice of intervention and a statement of position supporting FERC's recommendation that PJM revise its tariff provisions for reliability-backstop procurement and large-load cost allocation.",
      "stage": "stated by the body",
      "status_word": "filed (intervention and statement of position)",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (DOE release)",
      "quote": {
        "text": "DOE filed a notice of intervention and statement of position supporting FERC's recommendation that PJM revise tariff provisions for reliability-backstop procurement and large-load cost allocation.",
        "file": "Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md",
        "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv"
      ],
      "register_records": [
        "oct12-017"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece",
      "thesis_words": [],
      "what_moves": "nothing; a federal department takes a position in a FERC proceeding",
      "note": "The file does not give the date, docket or form of FERC's recommendation that DOE supported."
    },
    {
      "n": 16,
      "date": "2026-11-19",
      "body": "FERC",
      "what": "FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads.",
      "stage": "authorized and effective",
      "status_word": "authorized and effective",
      "weight": "step",
      "quote": {
        "text": "FERC's November 19 order in ER26-3474-000 and ER26-3475-000 authorizes NiSource Generation Company LLC to sell energy and capacity at market-based rates to NIPSCO under two PPAs associated with Amazon and Alphabet data-center loads.",
        "file": "Data Center Federal Legal Spine 2025-2026/FERC_NIPSCO_AMAZON_ALPHABET_AFFILIATE_POWER_ORDER_2026-11-21.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/FERC_NIPSCO_AMAZON_ALPHABET_AFFILIATE_POWER_ORDER_2026-11-21.md"
      ],
      "thesis_words": []
    },
    {
      "n": 17,
      "date": "2026-11-19",
      "body": "United States Senate",
      "what": "The Senate's exact roll-call record reports passage of H.R.",
      "stage": "passed one chamber",
      "status_word": "passed one chamber",
      "weight": "step",
      "quote": {
        "text": "The Senate's exact roll-call record reports passage of H.R.",
        "file": "Data Center Federal Legal Spine 2025-2026/SENATE_PERMITTING_BILL_PASSAGE_RETURN_2026-11-21.md"
      },
      "files": [
        "Data Center Federal Legal Spine 2025-2026/SENATE_PERMITTING_BILL_PASSAGE_RETURN_2026-11-21.md"
      ],
      "thesis_words": []
    }
  ],
  "strands": [
    {
      "strand": "Congress",
      "steps": [
        1,
        4,
        6,
        7,
        10
      ]
    },
    {
      "strand": "FERC and PJM co-location",
      "steps": [
        2
      ]
    },
    {
      "strand": "FERC national large-load docket (RM26-4)",
      "steps": [
        3,
        8
      ]
    },
    {
      "strand": "Ratepayer Protection Pledge",
      "steps": [
        5,
        13
      ]
    },
    {
      "strand": "FERC six section 206 proceedings",
      "steps": [
        9,
        14
      ]
    },
    {
      "strand": "Reliability standards for computational load (NERC)",
      "steps": [
        11
      ]
    },
    {
      "strand": "Power not connected to the grid",
      "steps": [
        12
      ]
    },
    {
      "strand": "FERC and PJM cost allocation",
      "steps": [
        15
      ]
    }
  ],
  "where_in_the_system": [
    {
      "stage": "(g) What oversight bodies add",
      "steps": [
        1
      ],
      "note": ""
    },
    {
      "stage": "(b) Agency rule",
      "steps": [
        3,
        8,
        12
      ],
      "note": "RM26-4 is at advance-notice stage; no proposed rule is recorded. Step 12 is guidance outside rulemaking."
    },
    {
      "stage": "(e) Statute",
      "steps": [
        4,
        6,
        7,
        10
      ],
      "note": "All four bills are at introduced and referred as of 2026-08-20; no later stage is recorded."
    },
    {
      "stage": "(d) Presidential instrument",
      "steps": [
        5,
        13
      ],
      "note": "A voluntary pledge published on whitehouse.gov; no file gives an executive order or proclamation number for it."
    },
    {
      "stage": "Agency adjudication (not covered by the foundation piece)",
      "steps": [
        2,
        9,
        11,
        14,
        15
      ],
      "note": "No section of how-a-federal-action-moves-from-agenda-to-effect covers an agency adjudication such as a Federal Power Act section 206 order; electric-grid-regulation has no foundation piece. Stages with no step yet: operators' filings at 60 days, replies, a FERC merits order, compliance tariffs, effective tariffs; NERC filing, FERC approval, effective standards."
    }
  ],
  "quiet_stretch": [
    {
      "from": "2026-06-18",
      "to": "2026-11-06",
      "what": "The six section 206 proceedings: no FERC merits order and no operator filing is recorded; the November 6 file gives replies due November 16 and 20."
    },
    {
      "from": "2026-07-16",
      "to": "2026-11-11",
      "what": "NERC computational-load standards: no NERC filing or drafting step is recorded; due December 31, 2026."
    },
    {
      "from": "2025-12-18",
      "to": "2026-11-11",
      "what": "PJM co-location tariff rules: no PJM compliance filing or FERC acceptance is recorded."
    }
  ],
  "same_days": {
    "2026-06-18 (FERC six section 206 orders)": [
      {
        "date": "2026-06-15",
        "body": "U.S. Department of Justice",
        "line": "Moved to intervene and dismiss in the Southaven, Mississippi xAI/MZX Tech Clean Air Act case.",
        "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
      },
      {
        "date": "2026-06-18",
        "body": "Public Utility Commission of Texas",
        "line": "Approved ERCOT's Batch Zero process for large loads of at least 75 MW.",
        "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_OBSERVED_POWER_AND_BATCH_ZERO_2026-11-11.md"
      },
      {
        "date": "2026-06-18",
        "body": "U.S. House of Representatives",
        "line": "H.R.9372, Data Infrastructure Energy Measurement and Standards Act, introduced and referred to House Science.",
        "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md"
      },
      {
        "date": "2026-06-18",
        "body": "Office of Strategic Capital",
        "line": "Announced a $725 million conditional loan commitment to Energy Fuels for rare-earth separation and metallization.",
        "file": "Contested Logistics/CONTESTED_LOGISTICS_TRANSITION_TIMELINE.md"
      },
      {
        "date": "2026-06-18",
        "body": "U.S. Securities and Exchange Commission",
        "line": "Conditional exemption letting certain private funds clear through captive clearing subsidiaries (Release 34-105736).",
        "file": "Fed, Clearing and Treasury/2026 U.S. Treasury Market Conference/SOURCE_LEDGER_2026-09-22.md"
      }
    ],
    "2026-07-16 (FERC direction to NERC, RD26-7-000)": [
      {
        "date": "2026-07-16",
        "body": "Federal Energy Regulatory Commission",
        "line": "Same meeting: AD26-10 requires CAISO and SPP to submit a joint Western-seams report by September 30.",
        "file": "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      },
      {
        "date": "2026-07-16",
        "body": "DOE CESER (as the file writes it)",
        "line": "Released the Stormbreaker testbed to find failure modes of language models and agents in power and operational-technology settings.",
        "file": "AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/TURBINE_ASSET_MANAGEMENT_TECHNOLOGY_AND_AI_AUTOMATION_MAP.md"
      },
      {
        "date": "2026-07-16",
        "body": "U.S. Government Accountability Office",
        "line": "Published GAO-26-108520 on DOE project-management streamlining.",
        "file": "Government-Wide Audit 2026-07-18/Annexes/OVERSIGHT_WATCHDOGS_DELTA_2026-07-15_TO_2026-07-18.md"
      },
      {
        "date": "2026-07-17",
        "body": "U.S. Environmental Protection Agency",
        "line": "Updated its Clean Air Act data-center resources page.",
        "file": "Data Center Federal Legal Spine 2025-2026/EO_14318_IMPLEMENTATION_RETURN_AUDIT_2026-08-20.md"
      },
      {
        "date": "2026-07-15",
        "body": "Senate Committee on Banking, Housing, and Urban Affairs",
        "line": "Held the Federal Reserve semiannual monetary policy hearing.",
        "file": "Government-Wide Audit 2026-07-18/Transcripts/2026-07-15__senate-banking-fed-semiannual/SOURCE.md"
      }
    ]
  },
  "where_it_stands": "The November 21, 2026 returns record FERC’s November 19 authorization of the NIPSCO/NiSource GenCo affiliate PPAs for Amazon and Alphabet loads, effective on issuance, and the Senate’s November 19 passage of H.R.2347 as amended. The older snapshots below retain their own dates and proceedings. At the November 6 snapshot that checks the federal grid record (November 6, 2026), FERC's six section 206 proceedings are open with no merits order recorded; replies are due November 16 (five operators) and November 20 (SPP). RM26-4 is at advance-notice stage with no proposed or final rule recorded (October 5 check). NERC's computational-load standards are due December 31, 2026, with no filing recorded. DOE's October 9 filing supports a FERC recommendation on PJM cost allocation; no PJM tariff filing or FERC order on it is recorded. The four bills are introduced and referred as of August 20. The Ratepayer Protection Pledge is voluntary, with signers added July 23. The latest file on the thread (November 11, 2026) holds grid-operator figures for ERCOT and PJM and no federal step.",
  "next_dated": [
    {
      "when": "2026-11-16",
      "what": "Replies due in the section 206 proceedings for five grid operators (the file says \"five RTO/ISOs\" without naming them).",
      "stage": "scheduled",
      "files": [
        "Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md"
      ]
    },
    {
      "when": "2026-11-20",
      "what": "Replies due in the SPP section 206 proceeding.",
      "stage": "scheduled",
      "files": [
        "Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md"
      ]
    },
    {
      "when": "2026-12-31",
      "what": "NERC due to submit computational-load reliability standards and registration changes (RD26-7-000).",
      "stage": "scheduled",
      "files": [
        "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      ]
    }
  ],
  "not_shown": [
    "The notes do not record any filing by a grid operator at the 60-day mark, any reply, or any FERC merits order in the six proceedings.",
    "The docket numbers of five of the six June 18 orders (only NYISO EL26-69-000 is given), and the docket of the December 2025 PJM order.",
    "The date the RM26-4 advance notice issued, and the text of the April 2026 order.",
    "The date, docket and form of the FERC recommendation on PJM that DOE supported on October 9.",
    "The notes do not record any NERC drafting step on computational-load standards.",
    "The notes do not record any data center connected, any tariff changed, or any bill moved past referral after any step here.",
    "The notes do not record a proclamation or executive-order number for the Ratepayer Protection Pledge, or any enforcement mechanism for it."
  ],
  "where_the_files_stop_top5": [
    "What the six grid operators filed at the 60-day mark and how it relates to the November 16 and 20 reply dates.",
    "Any FERC order in the six proceedings after the November 16 and 20 replies.",
    "NERC's December 31, 2026 computational-load filing.",
    "The FERC recommendation on PJM that DOE supported on October 9: its date, docket and what PJM filed.",
    "The RM26-4 advance notice: issue date and whether a proposed rule followed."
  ],
  "touches": [
    {
      "thread": "doe-202c-orders",
      "at_step": "none in this story; the batch 3 story's step on order 202-26-45",
      "how": "The batch 3 story records that DOE order 202-26-45 (September 17, 2026) authorized backup generation at large loads without naming them, and that Executive Order 14262's purpose text cites AI data centers."
    },
    {
      "thread": "eo-14318-datacenter-permitting",
      "at_step": "none",
      "how": "Executive Order 14318 (July 23, 2025) defines a covered Data Center Project as more than 100 MW of new AI-related load and directs permitting and federal-land steps; the order map lists no grid-connection instruction in it."
    },
    {
      "thread": "ercot-batch-zero",
      "at_step": "9 (same day)",
      "how": "The Public Utility Commission of Texas approved ERCOT's Batch Zero large-load process on June 18, 2026, the day of FERC's orders. ERCOT reports are due December 10, 2026."
    },
    {
      "thread": "datacenter-legislation",
      "at_step": "4, 6, 7, 10",
      "how": "The four grid-cost bills are rows of that thread's registry."
    },
    {
      "thread": "doe-speed-to-power",
      "at_step": "none",
      "how": "DOE's Speed to Power page inventories large-load, transmission and technical-assistance actions; DOE announced Speed to Power grid funding on September 24, 2026."
    },
    {
      "thread": "eo-14421-bulk-power",
      "at_step": "none",
      "how": "Executive Order 14421 (signed August 26, 2026) declared a national emergency over foreign bulk-power equipment; no file ties it to data-center load."
    },
    {
      "thread": "ai-capex-financing-gap",
      "at_step": "none",
      "how": "Register tie (\"the spending\")."
    }
  ],
  "foundation": [
    {
      "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md",
      "why": "'Front 2' sets out FERC's six section 206 proceedings and RM26-4 on one page."
    },
    {
      "file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
      "why": "Section 4 and the November 3 NYISO addition give the FERC layer at October 5 and the NYISO order's protection-payment terms."
    },
    {
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_CONTROL_SURFACE_MAP.md",
      "why": "One table of what each executive order and the FERC cases authorize and what they do not (the powering-datacenters-authorities thread)."
    }
  ],
  "interpretation": [
    {
      "claim": "Codex: the grid is where the data-center contest is now decided.",
      "quote": "the grid front is becoming the operative center of gravity",
      "file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
    },
    {
      "claim": "Codex: the FERC proceedings are firmer than the pledge.",
      "quote": "are the harder operating edge",
      "file": "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md"
    },
    {
      "claim": "Codex, in the register, writes a thesis reading onto the FERC proceedings.",
      "quote": "thesis read: The grid tariff is becoming an AI infrastructure gate.",
      "file": "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv (record ai-transition-ferc-large-loads)"
    },
    {
      "claim": "Codex, in the register, writes a thesis reading onto the pledge.",
      "quote": "thesis read: Attempts to place AI infrastructure costs at the commercial interface rather than on general customers.",
      "file": "REGISTER:Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv (record ai-transition-ratepayer-protection-pledge)"
    },
    {
      "claim": "Codex: the June 18 orders set a federal clock for tribal and non-tribal projects alike.",
      "quote": "This creates a parallel federal power clock for tribal and non-tribal projects.",
      "file": "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md"
    },
    {
      "claim": "Codex names a pattern across permitting and grid tariffs.",
      "quote": "The correct synthesis is procedural compression and jurisdictional relocation",
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_CONTROL_SURFACE_MAP.md"
    }
  ],
  "left_out": [
    "ERCOT demand figures (February 4 and April 2026), Batch Zero classifications, energization pause and verification requests (August 3 to November 11, 2026): Texas and ERCOT steps, not steps in a federal action (ercot-batch-zero thread).",
    "PJM's May 29, 2026 forecast-accuracy report and September 29, 2026 start of forecast vetting: grid-operator data that no file ties to the FERC proceedings.",
    "Texas SB 6, Oregon HB 3546, Virginia GS-5, Georgia PSC orders, the Kentucky EKPC tariff, New York Executive Order 62 and Case 26-E-0045: State actions.",
    "Federal Reserve Bank of Dallas Powering AI recap (September 18, 2026) and Federal Reserve Bank of Minneapolis events: conference views, no action.",
    "Louisiana PSC orders and Entergy and Meta Hyperion steps: State and private (meta-hyperion thread).",
    "Berkeley Lab interconnection-queue counts and turbine orders: counts and private actions.",
    "Tri-State v. FERC appellate brief (November 5, 2026): the file does not tie it to large loads.",
    "H.R.5927 (Defense Production Act designation for AI power, November 7, 2025) and the other data-center bills: kept in datacenter-legislation.",
    "EPA's July 17 Clean Air Act data-center resources page update: kept under same_days only.",
    "The NYISO order's paragraph-level terms: kept as a note on step 9, since the order is one of the six documents in that step."
  ],
  "open_points": [
    {
      "kind": "missing fact",
      "what": "The library gives no issue date for the RM26-4 advance notice of proposed rulemaking.",
      "where": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md; Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The April 2026 FERC order is dated only by month in the research file; the day (April 16) comes from the title of a linked FERC page in another file.",
      "where": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md section 4; Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md (source line of the 2025-12-18 entry)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "passed deadline",
      "what": "FERC gave the six operators 60 days from June 18, 2026. The notes record no result as of 2026-11-11.",
      "where": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md (Front 2)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "No file says how the 60-day window relates to the reply dates of November 16 (five operators) and November 20 (SPP).",
      "where": "Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md (bullet beginning \"No new FERC large-load decision\")",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "Docket numbers for five of the six June 18 orders and for the December 18, 2025 PJM order are not in the library.",
      "where": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md; Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The DOE intervention is dated only in the register (2026-10-09, native date, clock not named); the research file gives no date, and neither gives the date or docket of the FERC recommendation DOE supported.",
      "where": "Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md (section \"PJM cost-allocation filing\"); register record oct12-017",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The claim firewall calls the Ratepayer Protection Pledge \"a proclamation/voluntary policy instrument\"; no file gives a proclamation number, and other files call it a voluntary pledge.",
      "where": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_CLAIM_FIREWALL_AND_WATCHBOARD_2026-08-20.md (claim table)",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The four grid-cost bills are recorded at introduced and referred as of the registry's August 20, 2026 cutoff; the library holds no later check of them.",
      "where": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "register error",
      "what": "The register's where_it_stands for ai-datacenter-power names only Dallas and Minneapolis conference views, and its main_bodies are ERCOT, Xcel Energy and the Federal Reserve Bank of Dallas; the federal steps in its own files (FERC, NERC, EPA, DOE) are not named.",
      "where": "Thread Register (whole library)/THREAD_REGISTER_whole_workbench.json, thread ai-datacenter-power",
      "settled": "yes: this story's steps 2, 3, 8, 9, 11, 12 and 15",
      "fix": "FERC opened six section 206 large-load proceedings on June 18, 2026 (replies due November 16 and 20) and on July 16, 2026 directed NERC to file computational-load standards by December 31, 2026; RM26-4 remains an advance notice."
    },
    {
      "kind": "lead",
      "what": "Tri-State v. FERC appears in FERC's November 5 appellate brief index; no file says whether it concerns large loads.",
      "where": "Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The NYISO order EL26-69-000 is read by paragraph; the other five orders' protection-payment terms are not read in the library.",
      "where": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md (November 3 addition)",
      "settled": "no",
      "fix": ""
    }
  ],
  "open_points_tally": {
    "missing_fact": 7,
    "error_under_four_tests": 0,
    "other_kinds": 4,
    "note": "The register error is a thread-register summary, not a research-file error; no research-file statement meets the four tests."
  },
  "files_used": {
    "thread_files": [
      "AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/FORWARD_WATCHBOARD.md",
      "AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/PRIMARY_SOURCE_CLAIM_LEDGER.md",
      "AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/US_TURBINE_BUILDOUT_AND_ADOPTION_CLOCKS_2026-08-09.md",
      "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_OBSERVED_POWER_AND_BATCH_ZERO_2026-11-11.md",
      "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md",
      "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
      "Fed, Clearing and Treasury/2026 Federal Reserve Conference Record Audit/DALLAS_2026_CONFERENCE_RECORD_ANALYSIS_2026-09-22.md",
      "Fed, Clearing and Treasury/2026 Federal Reserve Conference Record Audit/MINNEAPOLIS_2026_PUBLIC_EVENT_RECORD_ANALYSIS_2026-09-22.md",
      "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md",
      "Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md",
      "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md",
      "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_CONTROL_SURFACE_MAP.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_HIDDEN_SUPPLY_CHAIN_AND_NAES_EXPANSION_2026-08-19.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CLAIM_AUDIT_AND_WATCHBOARD_2026-08-19.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_MAP_2026-08-19.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_MAP_2026-08-19.md",
      "Sovereign Compute/FEDERAL_TRIBAL_COMPUTE_MOBILIZATION_TIMELINE.md",
      "Sovereign Compute/NEW_YORK_SOVEREIGN_COMPUTE_DEEP_DIVE.md",
      "Sovereign Compute/TRIBAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md",
      "US Inbound Investment and Industrial Capex Funding Map 2025-2026/META_RICHLAND_POWER_AND_FINANCING_2026-11-10.md",
      "Data Center Federal Legal Spine 2025-2026/FERC_NIPSCO_AMAZON_ALPHABET_AFFILIATE_POWER_ORDER_2026-11-21.md",
      "Data Center Federal Legal Spine 2025-2026/SENATE_PERMITTING_BILL_PASSAGE_RETURN_2026-11-21.md"
    ],
    "related_files": [
      "Data Center Federal Legal Spine 2025-2026/EO_14318_IMPLEMENTATION_RETURN_AUDIT_2026-08-20.md",
      "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_CLAIM_FIREWALL_AND_WATCHBOARD_2026-08-20.md",
      "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGAL_SPINE_2025-2026.md",
      "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_LEGISLATION_REGISTRY_119TH_CONGRESS_2026-08-20.md",
      "Federal Agency AI Plans and Infrastructure 2025-2026/OVERALL_AI_TRANSITION_PROPOSAL_TO_OPERATION_MAP_2026-09-28.md",
      "Federal Government Website Sweep 2026-07-25/Executive Office Wave 2/EXECUTIVE_OFFICE_WAVE_2_PRIMARY_OBJECT_LEDGER.md",
      "Federal Government Weekly Catch-up 2026-11-06/DOMESTIC_SOURCE_REVIEW.md",
      "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
    ],
    "register": "Sweep Ledgers 2026-11-13/ALL_REGISTER_RECORDS.csv",
    "other": [
      "Stories 2026-11-14/batch 3/doe-202c-orders.json",
      "Executive Order Map 2026-11-14/ORDER_MAP_MERGED.json",
      "Katie's Words 2026-11-13/ORIGINS_BY_PACKAGE.json",
      "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
      "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json"
    ]
  },
  "register_records_used": [
    "EPA-CAA-ISLANDED-ARP",
    "ai-transition-ferc-large-loads",
    "ai-transition-ratepayer-protection-pledge",
    "house.go05:formal-transcript-released:118078",
    "oct12-017",
    "oversight-site-2025-04-01-america-s-ai-moonshot-the-economics-of-ai-data-centers-and-power-consumption"
  ],
  "counts": {
    "thread_files": 20,
    "thread_files_note": "Union of the files of ai-datacenter-power (19), ferc-large-load-proceedings (2, both among the 19) and powering-datacenters-authorities (1).",
    "raw_happenings_in_thread_files": 207,
    "related_files_added": 8,
    "happenings_kept": 13,
    "happenings_kept_note": "Reader-record happenings kept and merged: FERC June 18 six orders (5 records in 4 files), NYISO June 18 order (1), FERC April order (1), FERC PJM December 2025 order (1), FERC RD26-7 (1), EPA July 16 memo (3 records in 3 files), DOE PJM intervention (1). The four bills come from registry rows read directly, the pledge from file reading and the register, and the 2025 hearing from the register only. Other happenings in thread files are other subjects or State, private and conference items (see left_out).",
    "steps": 17,
    "turning_points": 2,
    "steps_from_register_only": 1,
    "steps_with_disagreement": 2,
    "steps_with_saved_original": 0
  },
  "builder_notes": [
    "Scope. The thread is a question thread whose register entry centres on ERCOT and Federal Reserve conference views. Under the federal-focus rule the story is built from federal acts on data-center grid load; ERCOT, PJM data reports and State commission actions are left out or kept under touches.",
    "Folded in: ferc-large-load-proceedings (whole) and powering-datacenters-authorities (as a source). Not folded in: eo-14318-datacenter-permitting (different action; no grid instruction in the order map), doe-202c-orders (batch 3), ercot-batch-zero (State).",
    "No foundation piece exists for electric-grid-regulation, and the agenda-to-effect piece has no section for agency adjudications; FERC orders are placed under a stage label saying so.",
    "Step 14 (the 60-day deadline, about August 17) is worked out from the June 18 date and the 60 days in the file; no file states the day.",
    "Step 1 rests only on the sweep register (two records); no research file writes it up.",
    "Thesis words: no step is plainly an instance of a thesis word; all thesis_words lists are empty.",
    "Hard part: the federal record is thin past June 18. Most files after that date restate the June 18 orders; the only later federal acts found are RD26-7 (July 16), the EPA memo (July 16), the pledge expansion (July 23) and DOE's filing (October 9).",
    "Quote check (whitespace normalised, markdown link and bold marks removed; register quotes checked against ALL_REGISTER_RECORDS.csv): 15 step quotes and 6 interpretation quotes; result: checked 15 bad 0."
  ],
  "set_aside_2026-11-14": [
    {
      "field": "steps[1].note",
      "text": "only"
    },
    {
      "field": "steps[8].disagreement",
      "text": "only"
    },
    {
      "field": "steps[11].what",
      "text": "It is not a rule;"
    },
    {
      "field": "open_points[2].what",
      "text": "ran out about August 17, 2026 (worked out from June 18)"
    },
    {
      "field": "where_the_files_stop_top5[0]",
      "text": "(about August 17, 2026)"
    },
    {
      "field": "touches[0].how",
      "text": "Same statute (Federal Power Act), different section (202(c)) and decision-maker (the Secretary of Energy)."
    }
  ],
  "checks_applied_2026-11-14": [
    {
      "where": "steps[n=3].quote.text",
      "why": "Check 1: 'remains a pre-proposal record that helped build the evidentiary base' is the file's comment. The October 5 refresh (already in the step's files) states the stage plainly.",
      "evidence_file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md"
    },
    {
      "where": "steps[n=3].quote.file",
      "why": "Goes with the new quote text for step 3.",
      "evidence_file": "Data Center Federal Legal Spine 2025-2026/FEDERAL_DATA_CENTER_RETURN_REFRESH_2026-10-05.md"
    },
    {
      "where": "steps[n=14].date_note",
      "why": "Check 2 and owed item 2: the builder counted the day; no research file gives 2026-08-17.",
      "evidence_file": "Data Center Federal Legal Spine 2025-2026/DATA_CENTER_WAR_LANDSCAPE_FRESH_ORIENTATION_2026-08-20.md"
    }
  ],
  "changes": [
    {
      "date": "2026-11-18",
      "by": "Codex",
      "what": "Repaired five source quote anchors against exact current research text; dates, facts, numbering and cross-story pointers unchanged."
    },
    {
      "date": "2026-11-21",
      "by": "Codex",
      "what": "Added dated, source-quoted federal decisions from the weekly review; all earlier step numbers and cross-story pointers are unchanged. Earlier whole-story evidence clocks remain explicit."
    }
  ],
  "where_it_stands_before_2026-11-21_weekly_update": "At the latest file that checks the federal grid record (November 6, 2026), FERC's six section 206 proceedings are open with no merits order recorded; replies are due November 16 (five operators) and November 20 (SPP). RM26-4 is at advance-notice stage with no proposed or final rule recorded (October 5 check). NERC's computational-load standards are due December 31, 2026, with no filing recorded. DOE's October 9 filing supports a FERC recommendation on PJM cost allocation; no PJM tariff filing or FERC order on it is recorded. The four bills are introduced and referred as of August 20. The Ratepayer Protection Pledge is voluntary, with signers added July 23. The latest file on the thread (November 11, 2026) holds grid-operator figures for ERCOT and PJM and no federal step."
}