Skip to content

Download the original MD document

---


title: Executive Office Wave 2 — Primary Object and Correction Ledger status: pending artifact_role: primary-object-ledger high_resolution_window: 2026-07-22 through 2026-07-25 ET backfill_window: 2025-01-20 through 2026-07-25 baseline: White House Research Hub audit, cutoff 2026-07-21


---

Executive Office Wave 2 — Primary Object and Correction Ledger

Scope and clock rule

The high-resolution delta begins July 22. The longer backfill is limited to material non-EO or government-wide control instruments that the existing executive-order corpus cannot represent.

Use the full clock chain where applicable:

announcement -> signature -> transmission -> Federal Register publication -> effective date -> agency instruction -> rule/contract/award -> implementation -> observed effect

Presidential instruments

Restoring Trust in the Smithsonian Institution

FieldFinding
ObjectExecutive order, title as shown; EO number not yet shown on the White House page or confirmed in the Federal Register at the cutoff
Signature / White House clockJul 24, 2026
Upstream objectsEO 14253 of Mar 27, 2025; Domestic Policy Council report released Jul 4, 2026
Directed entitiesInterior, acting through NPS; OMB; GSA; Domestic Policy Council
Immediate directivesIdentify and use available authorities, including funding and contract conditions; install temporary warning and corrective signage/exhibits on NPS-maintained sidewalks, walkways and land serving the National Museum of American History
ConstraintsApplicable law; available appropriations; no private right of action
Primary sourcesWhite House order; 20 U.S.C. § 41; Smithsonian legal history

The Smithsonian is a congressionally created trust instrumentality governed by its Board of Regents, not an executive-branch agency. The order therefore does not itself change an exhibit, remove Smithsonian leadership or replace the Regents' governance. Its presently operative routes are executive control of NPS property, executive budget/contract/funding leverage and coordination with the Domestic Policy Council. The Federal Register publication/number clock, actual signage clock, any Smithsonian response and any funding or contract action remain separate open watches.

Forced-labor Section 301 actions covering 60 economies

ClockState
Mar 12, 2026USTR initiated 60 separate Section 301 investigations.
Jun 2 / Jun 5USTR made actionable-practice determinations; notice published as 91 FR 34272.
Jul 7–9USTR held hearings on the proposed responsive actions after receiving written comments.
Jul 23President signed a memorandum directing the final tariff architecture; USTR issued its final-action release and pre-publication notice.
12:01 a.m. ET Jul 24Additional duties became applicable, subject to the in-transit exception through Jul 28.
FutureUSTR is to establish three-year textile/apparel TRQs for Bangladesh, Cambodia, Indonesia and Malaysia when feasible and publish their separate effective dates.

The final architecture is 10 percent for 17 named economies; a total MFN-plus-Section-301 rate capped at 10 percent for the European Union and Taiwan, or 12.5 percent for Japan, Korea and Switzerland; and 12.5 percent for the remaining investigated economies, all subject to large product-specific annexes. The actions are legally separate by investigated economy even though they are carried in one memorandum and one notice.

Primary sources: [presidential

memorandum](https://www.whitehouse.gov/presidential-actions/2026/07/actions-by-the-united-states-in-the-investigations-under-section-301-of-the-trade-act-of-1974-of-the-acts-policies-and-practices-of-60-economies-related-to-the-failure-of-each-economy-to-impose-and/);

[USTR final-action

release](https://ustr.gov/about/policy-offices/press-office/press-releases/2026/july/ustr-takes-action-forced-labor-section-301-investigations);

[USTR pre-publication

notice](https://ustr.gov/sites/default/files/files/Press/Releases/2026/FLIP%20301%20Investigation%20Final%20Action%20FRN%207-23-26%20FINAL.pdf).

This is not a future tariff announcement: the USTR notice supplies a Jul 24 customs-effect clock. It is also not a simple replacement for the temporary Section 122 surcharge that reached its scheduled end at the same clock. The legal authority, investigated-country set, product exemptions and rate architecture differ. Formal Federal Register publication remained unconfirmed at this cutoff even though USTR had published the pre-publication text.

Executive Office component instruments

Domestic Policy Council Smithsonian report

`Saving America's Story: How Ideological Capture at the Smithsonian

Institution's National Museum of American History Erases Our Heritage` is a 162-page Domestic Policy Council report released on Jul 4. It is the findings object cited and operationalized by the Jul 24 order, not itself a presidential directive or a Smithsonian/Board of Regents act. [White House release and

download](https://www.whitehouse.gov/releases/2026/07/saving-americas-story/);

[official

PDF](https://www.whitehouse.gov/wp-content/uploads/2026/07/Smithsonian-Report-Saving-Americas-Story.pdf).

The PDF subtitle incorrectly describes EO 14253 as the President's “March 27, 2026” order. EO 14253 was signed Mar 27, 2025 and published Apr 3, 2025. The Jul 24 order states the correct year. This mechanical date contradiction must not be propagated into the vault.

Genesis Mission becomes a distributed whole-of-government portfolio

The Jul 22 White House/OSTP release announces more than $5 billion in

“Federal commitments,” more than 15 contributing agencies and a portfolio of National Science and Technology Challenges using DOE's American Science and Security Platform. The challenge portfolio joins federal research awards, future opportunities, datasets, facilities and compute. [White House

release](https://www.whitehouse.gov/releases/2026/07/45502/);

[DOE Genesis

hub](https://www.energy.gov/undersecretaryforscience/genesis-mission/genesis-mission).

The headline number is not one appropriation, award or obligation:

- DOE selected 278 projects, but expressly says selection for award

negotiations is not a commitment to issue an award or provide funding. [DOE selection

release](https://www.energy.gov/articles/secretary-energy-chris-wright-announces-first-genesis-mission-projects-selected-accelerate)

- NIH reports more than $1.2 billion in a mixture of obligated FY2026 and

planned FY2027 funding aligned to Bio Genesis, with new opportunities

still to come. [NIH Director

statement](https://www.nih.gov/about-nih/nih-director/statements/statement-launch-bio-genesis-mission-nihs-component-national-genesis-mission)

- NSF announced $380 million to 20 teams over four years, matched by up to

$20 million in philanthropic contributions. [NSF

release](https://www.nsf.gov/tip/updates/nsf-announces-400m-investment-new-national-network-ai)

- DOE separately reports more than $800 million in private consortium

commitments that may consist of compute credits, models, cloud infrastructure, expertise, research partnerships or direct funding. [DOE partner-commitment

release](https://www.energy.gov/undersecretaryforscience/articles/us-department-energy-announces-more-800-million-partner)

The correct state is a coordinated portfolio with some occurred awards or obligations, some planned funding, some selections awaiting negotiation and some in-kind/private commitments. Agency award notices and obligations, data- access agreements, platform integration and research results remain separate clocks.

Ratepayer Protection Pledge expansion

The Jul 23 White House release and initiative surface expand a voluntary data-center electricity-cost pledge beyond the seven March hyperscaler/AI company signers to utilities, cooperatives, data-center developers and 23 governors. The initiative page states that the coalition represents 80 percent of electricity delivered to U.S. homes and businesses and 263 million people when a data center is built nearby. [Jul 23

release](https://www.whitehouse.gov/releases/2026/07/president-trumps-ratepayer-protection-pledge-secures-american-ai-dominance-protects-consumers/);

[initiative and signatory

registry](https://www.whitehouse.gov/ratepayer-protection-pledge/);

[signed governors'

addendum](https://www.whitehouse.gov/wp-content/uploads/2026/07/Ratepayer-Protection-Pledge-Signed.pdf).

The pledge is a public/private commitment architecture, not a federal regulation or self-executing rate order. The signed governors' addendum says participants will implement the principles “to the greatest extent possible in our respective positions.” Actual enforceability and price effects depend on separate utility contracts, tariffs/rate structures, state commission or legislative action, project interconnection and realized billing. The White House examples of projected savings or freezes must therefore be checked against those underlying objects before they are treated as observed federal effects.

Government-wide implementation carriers

USTR notice makes the Section 301 directive customs-operative

The 431-page USTR notice is the implementation carrier for the Jul 23 presidential memorandum. It supplies the entry clock, in-transit rule, country-specific rates, HTSUS modifications and product annexes. Its effective clock is 12:01 a.m. ET Jul 24, not the later formal-publication clock. USTR and CBP implementation, subsequent corrections and the future TRQ notice are the downstream watches.

DOE, NIH and NSF carry Genesis into agency objects

The White House release names a government-wide mission, but agency objects control spend and operating state. DOE's 278 selections are still in negotiation; the publicly posted selection list identifies principal investigator, project, institution and location but not an executed award amount for each project. NIH mixes an already-obligated and a planned-funding clock. NSF identifies an occurred four-year award portfolio. These objects must be retained separately from OSTP's aggregation and from the $800 million private/in-kind consortium total.

NPS, OMB and GSA are carriers, not Smithsonian governors

The Jul 24 order makes NPS the actor for temporary material on NPS-controlled approaches to the museum and directs Interior, OMB, GSA and DPC to identify other available leverage. No post-order NPS installation notice, OMB/GSA instruction, Smithsonian exhibit change or Board of Regents action was located by the cutoff. Those are implementation watches, not completed effects.

M-26-16 / NSTM-5 creates a mandatory FY2028 R&D planning clock

The joint OSTP–OMB memorandum was signed Jul 21, at the baseline boundary.

Agencies with at least $3 billion in FY2026 R&D budget authority must submit

action plans to OSTP and OMB within 90 days, on Oct 19, 2026. The plans must

identify funding opportunities, solicitations, pilots, organizational changes, timelines and responsible offices. [Official

PDF](https://www.whitehouse.gov/wp-content/uploads/2026/07/M-26-16-Ushering-in-a-New-Golden-Age-of-American-Innovation-Fiscal-Year-2028-Administration-Research-and-Development-Budget-Priorities.pdf).

This is operative budget/planning control, not an appropriation, award or proof that the described programs are operating. It is already represented in the Federal Science Operating System package and should remain a shared anchor rather than be duplicated.

EO 14398 existing-contract compliance deadline matured

Apr 17 FAR Council guidance directed new solicitations and contracts to use FAR 52.222-90 beginning Apr 24 and told agencies to make every effort to

bilaterally modify covered existing contracts by Jul 24, 2026. Agency

compliance reports to the Assistant to the President for Domestic Policy were also due Jul 24. [FAR Council

guidance](https://www.acquisition.gov/sites/default/files/page_file_uploads/FAR%20Council%20Guidance%20to%20Implement%20EO%2014398.pdf).

The deadline occurred; government-wide completion did not become proven. No public consolidated report showing all relevant contracts modified was located. The guidance also conditioned full information-collection enforcement on OMB approval. Four Requesting Feedback on Office proposals had Jul 23 comment deadlines but remained labeled “Open” on the current interface; treat that as stale interface state pending a new instrument, not as an extension.

Other in-window Federal Register carriers

ObjectClock / stateCorrection
OPM E-File, 91 FR 46802New information-collection request; comments due Aug 24Account-based case-filing system being created with FedRAMP-certified products; not OMB approval or a demonstrated production launch
First Responder Fair RETIRE Act proposal, 91 FR 46012Proposed rule; comments due Sep 21Not final or effective
FY2027 sugar TRQ allocations, 91 FR 46822Applicable Jul 24; quota entries begin Oct 1Operative delegated trade allocation, not a proposal
OPM legal-process agents, 91 FR 45991Final/effective Jul 22Minor administrative update to designated agents/addresses

ONDCP wastewater publication is data, not national prevalence

ONDCP's first wastewater-based drug-testing issue covers more than 100 counties and approximately 18 percent of the population and expressly is not nationally representative. It names Biobot Analytics, but the public release does not identify the contract/agreement object. [Landing

page](https://www.whitehouse.gov/research/2026/07/office-of-national-drug-control-policy-releases-first-wastewater-based-drug-testing-report/);

[report

PDF](https://www.whitehouse.gov/wp-content/uploads/2025/03/ONDCP-Wastewater-Newsletter-Issue-1-July-2026_FINAL.pdf);

[technical

supplement](https://www.whitehouse.gov/wp-content/uploads/2025/03/ONDCP-Wastewater-Newsletter-Issue-1-Supplement-July-2026_FINAL-1.pdf).

Baseline corrections and non-EO registry

The incorporated White House audit found that the generated EO corpus covered 123 of 164 related presidential-action objects. The missing 41 are not all equally important. This section records the high-control instruments that need first-class representation because an EO-only architecture cannot carry them.

National-security decision and control architecture

NSPM-1 — NSC/HSC decision machine

NSPM-1,

signed Jan 20, 2025, supersedes prior presidential guidance on NSC organization. It makes the NSC, also convening as the Homeland Security Council, the principal national/homeland-security policy development, coordination, implementation and monitoring mechanism; defines the NSC, Principals Committee, Deputies Committee and Policy Coordination Committees; and fuses NSC/HSC support into one EOP staff and Executive Secretary.

The structure and decision rights exist from signature. Meetings, membership designations, decisions and implemented policy remain distinct objects. No separate Federal Register publication surfaced in the bounded title search.

NSPM-11 — AI in the national-security enterprise

NSPM-11,

signed Jun 5, rescinds and replaces NSM-25. It establishes adoption, adaptation, assurance and accountability policy across the Department of War, the Intelligence Community and other national-security-system users. It directs a 90-day update to DoD Directive 3000.09, CNSS/OMB governance, a classified annex, procurement changes, compute roadmap/test range, security partnerships, cross-enclave exchanges, an AI talent reserve and TEVV/risk standards.

This is a directive-and-deadline architecture. It does not prove the roadmap, test range, reserve, exchanges or standards are complete.

NSPM-12 — national-security-system cyber governance

NSPM-12,

signed Jun 12, immediately rescinds NSD-42 and NSM-8 and re-establishes the Committee on National Security Systems under an NSC-staff chair. Its core voting architecture joins the Department CIO, Intelligence Community CIO, Federal CIO/OMB and NSA Director as National Manager. It gives the National Manager emergency-directive and cryptology-minimum roles and makes OMB/Federal CIO the overseer for Federal Civilian Executive Branch national-security- system compliance.

The structure exists from signature. The 30/60/90/120-day inventories, policies, incident mechanisms, roadmaps, standards and portals are open implementation clocks.

Regulatory, trade and economic centralization

InstrumentLegal/administrative stateCritical correction
America First Trade Policy, Jan 20, 2025; FR Doc. 2025-02032Commerce/Treasury/USTR investigation-and-report architecture; Apr 1 and Apr 30 report clocksDid not itself impose a tariff, create an External Revenue Service, amend USMCA or alter a duty rate
Regulatory Freeze Pending Review, Jan 20; FR Doc. 2025-01906; OMB M-25-10Centralized new, unpublished and delayed-effective rules under appointee/OIRA reviewDid not automatically cancel or repeal all pending or final rules; the 60-day postponement was discretionary and law-bound
America First Investment Policy, Feb 21Directs Treasury/CFIUS and partner agencies on allied fast-track treatment, foreign-adversary exposure, mitigation, outbound review and other implementationNot itself a CFIUS clearance/ban, sanctions designation, tax-treaty suspension or operational fast-track
Directing the Repeal of Unlawful Regulations, Apr 9Agency/OIRA review-and-rescission direction under EO 14219 and applicable APA pathwaysDid not self-repeal a CFR provision or remove APA/judicial-review constraints
Eliminating Waste, Fraud, and Abuse in Medicaid, Jun 6HHS/CMS directive to act, including rate alignment to the extent permitted by lawNot itself a Medicare-rate cap, fraud finding, disallowance or recoupment
Delivering Emergency Price Relief, Jan 20; FR Doc. 2025-01904Agency direction and 30-day EOP reportingNot proof of repeals, price reductions or observed household effects
Freedom to Fix, Jun 29EPA guidance, certification and possible enforcement-priority directionGuidance deadline had not matured at the Jul 25 cutoff

Workforce-control sequence

- Hiring freeze: the [Jan 20, 2025

memorandum](https://www.whitehouse.gov/presidential-actions/2025/01/hiring-freeze/)

took effect at noon and barred filling covered civilian vacancies/new positions or contracting around the freeze, with exceptions. An [Apr 17

extension](https://www.whitehouse.gov/presidential-actions/2025/04/extension-of-hiring-freeze/)

ran the general freeze to Jul 15. It was a bounded phase, not a permanent government-wide authority.

- Leadership approval phase: the [Jul 7

memorandum](https://www.whitehouse.gov/presidential-actions/2025/07/ensuring-accountability-and-prioritizing-public-safety-in-federal-hiring/)

generally required presidentially appointed leadership approval through Oct 15, subject to exceptions, then expired into EO 14356.

- Career SES control: the [Jan 20

memorandum](https://www.whitehouse.gov/presidential-actions/2025/01/restoring-accountability-for-career-senior-executives/)

directed performance plans, reassignment authority and replacement of Executive Resources Board and Performance Review Board memberships. It does not prove every board was reconstituted or any named executive removed.

- OPM suitability delegation: the [Mar 20

memorandum](https://www.whitehouse.gov/presidential-actions/2025/03/strengthening-the-suitability-and-fitness-of-the-federal-workforce/)

expressly withheld its new delegation until Part 731 rulemaking was complete. OPM's [final

rule](https://www.federalregister.gov/documents/2026/06/30/2026-13154/suitability-and-fitness)

does not take effect until Jul 30, 2026. The delegation was therefore not

yet effective at this cutoff.

- Critical-position pay: the [May 29

memorandum](https://www.whitehouse.gov/presidential-actions/2026/05/approving-critical-position-pay-authority-for-national-security-investment-workforce/)

authorizes an OPM/OMB allocation framework for up to 400 national-security

investment positions and agency requests up to $400,000 basic pay. It

neither creates/fills 400 jobs nor automatically sets those salaries.

DPA Section 303 energy eligibility determinations

Five Apr 20 determinations, published Apr 23, make Section 303 findings, waive Section 303(a)(1)–(6) under (a)(7), and authorize/direct the Energy Secretary to use purchases, commitments and financial instruments:

1. [Coal supply chains and baseload generation; PD

2026-08](https://www.federalregister.gov/d/2026-08010)

2. [Large-scale energy and related infrastructure; PD

2026-09](https://www.federalregister.gov/d/2026-08011)

3. Grid infrastructure, equipment and supply chain; PD 2026-10, 91 FR 21931

4. [Domestic petroleum production, refining and logistics; PD

2026-11](https://www.federalregister.gov/d/2026-08016)

5. [Natural-gas transmission, processing, storage and LNG; PD

2026-12](https://www.federalregister.gov/d/2026-08017)

Each object creates legal eligibility and a waiver. None by itself is a purchase, loan, award, permit, obligation, expenditure or evidence of built capacity.

Operative proclamation corrections

Processed critical minerals — plan, not tariff

Proclamation 11001,

signed Jan 14 and published as [FR Doc.

2026-01045](https://www.federalregister.gov/d/2026-01045), concurred in a

Section 232 threat finding and directed Commerce/USTR negotiations, monitoring, consideration of price floors and other possible measures, and a 180-day update due Jul 13. It imposed no critical-minerals tariff or minimum import price. No public presidential update was located by cutoff; that is a public-reporting gap, not proof no internal report was delivered.

Temporary Section 122 surcharge — expired by its own terms

Proclamation 11012,

signed Feb 20 and published as [FR Doc.

2026-03824](https://www.federalregister.gov/d/2026-03824), imposed a 10

percent surcharge from 12:01 a.m. EST Feb 24 through 12:01 a.m. EDT Jul 24 unless earlier changed or extended by Congress. No extension, suspension or replacement Section 122 object was located. Record it as expired by its own term with customs cessation not independently verified—not as a permanent, universal or IEEPA tariff.

Chemical-manufacturing relief — signed before posting

The [2026

proclamation](https://www.whitehouse.gov/presidential-actions/2026/07/regulatory-relief-for-certain-stationary-sources-to-promote-american-chemical-manufacturing-security-be40/)

was posted Jul 13 but signed Jul 9. It grants only Annex I stationary sources two-year extensions from specified HON Rule compliance deadlines under Clean Air Act §112(i)(4); pre-HON obligations remain. It is not a wholesale repeal or stay. Its exact title duplicates 2025 Proclamation 10957, so signature date, identifier and annex must control dedup.

Three Canada Section 338 actions — future customs clock

The Jul 20 motor-vehicle,

alcoholic-beverage

and dairy

proclamations are three separate Section 338 objects. Each sets a 50 percent additional duty for its own Annex II products effective **12:01 a.m. ET Aug 19, 2026**. At cutoff they were signed but not customs-effective. They do not constitute a blanket 50 percent Canada tariff and do not stack on Section-232-covered articles.

Federal-adjacent bilateral operating framework

The [United States–United Kingdom Technology Prosperity Deal

MOU](https://www.whitehouse.gov/presidential-actions/2025/09/memorandum-of-understanding-between-the-government-of-the-united-states-of-america-and-the-government-of-the-united-kingdom-of-great-britain-and-northern-ireland-regarding-the-technology-prosperity-de/),

signed Sep 18, 2025, is a bilateral nonbinding framework, not a unilateral presidential memorandum or treaty. Its operative clock is conditional on substantive progress formalizing/implementing the Economic Prosperity Deal; it then provides six-month, 12-month and annual working-group clocks. It commits no funds and is not a procurement, export license, standards adoption or proof of deployed compute/data exchange.

Additional government-wide control objects missing from dedicated coverage

- [OMB M-25-31, Consolidating Federal Procurement

Activities](https://www.whitehouse.gov/wp-content/uploads/2025/07/M-25-31-Consolidating-Federal-Procurement-Activities.pdf),

signed Jul 18, 2025, implements greater use of GSA vehicles and centralization through deviations, category-manager review, service-level agreements and performance monitoring. The OMB index shows inconsistent June 21 metadata. Individual deviations and migrated procurement establish implementation.

- [OPM government-wide Oracle Core HCM

award](https://www.opm.gov/news/news-releases/opm-awards-contract-for-first-ever-governmentwide-hr-platform/),

announced Jun 10, 2026, begins a phased platform intended to replace more than 100 systems and serve roughly two million civilian executive-branch employees. The public release omits contract number, ceiling, obligation, rollout schedule and current migrations; award does not equal workforce migrated.

- [GSA OneGov

launch](https://www.gsa.gov/about-gsa/newsroom/news-releases/gsa-unveils-onegov-strategy-04292025)

and [first-year results

claim](https://www.gsa.gov/about-gsa/newsroom/news-releases/onegov-saves-taxpayers-11-billion-in-first-year-04292026)

establish a procurement framework and vendor agreements, not universal

mandatory adoption. GSA reports 20 unified agreements and $1.1 billion in

savings; agreement-level terms should govern any harder claim.

- [Revised OMB Circular

A-123](https://www.whitehouse.gov/wp-content/uploads/2026/03/OMB-Circular-No.-A-123-2026.pdf),

Mar 10, 2026, is the government-wide internal-control governance/evaluation baseline applying to executive agencies, including independent regulatory agencies; Appendices A–D remain in effect.

Foreign-policy control instruments retained as routing objects

- NSPM-2,

signed Feb 4, 2025, directs Iran sanctions enforcement, license review, oil, export-control and Justice Department lanes. Designations, licenses, seizures, prosecutions and economic effects remain separate.

- NSPM-5,

signed Jun 30, 2025, reissues/amends the 2017 Cuba policy, supersedes NSPD-52 and PPD-43, and routes Treasury, Commerce and State regulatory, restricted-list and travel/financial controls.

- NSPM-8,

signed Oct 15, 2025, is a specific military-pay control for an appropriations lapse using available FY2026 appropriations, not a permanent organization or funding law.

Bounded empty hunts and access failures

- White House presidential actions: the high-resolution delta contained

the Jul 23 Section 301 memorandum and Jul 24 Smithsonian order. No Jul 22 or Jul 25 instrument appeared on the index at cutoff. Routine nomination transmissions were reviewed but not promoted absent an identified entity- control change.

- Section 122 exit: no congressional extension, presidential suspension,

modification or replacement Section 122 object was located. This is not independent CBP verification of cessation.

- OMB: no Jul 22–25 memorandum, circular, bulletin or supplemental/budget-

amendment object. M-26-16 dated Jul 21 remained the latest memorandum.

- OPM: no Jul 22–25 Chief Human Capital Officers Council memorandum. The

in-window Federal Register objects are listed above.

- GSA / Acquisition.gov: no in-window GSA government-wide implementation

release or new final FAR Council guidance. GSA's Jul 23 Form 5040 item is a routine PRA extension.

- CEQ, CEA and ONCD: no separately authored Jul 22–25 operative instrument

found on their public news surfaces.

- NSC, NEC and intergovernmental/political affairs: no separately authored

public operative instrument located in the White House index for the window. Their work may be embedded in presidential releases or readouts; this is not proof of inactivity.

- Federal Register: Jul 22–24 issues were checked; Jul 25 was Saturday and

returned no daily issue. No in-window government-wide FAR final rule, OMB rule or CEQ directive was located. Formal publication of the Jul 23 USTR final-action notice and Jul 24 Smithsonian order remained unconfirmed at cutoff.

- Smithsonian downstream: no post-order NPS signage notice, OMB/GSA

instruction, Smithsonian/Board of Regents response, exhibit change or funding/contract action was located.

- Access/index correction: the White House Presidential Memoranda category

begins around Mar 20, 2025 and omits several Jan–Feb memoranda/NSPMs that appear only under All Presidential Actions. A category-only scrape will miss NSPM-1, the hiring and regulatory freezes, trade policy, the SES memorandum and investment policy.

- Removal registry gap: there is no single public presidential removal

registry on the reviewed White House surface. NLRB, MSPB, FTC, CFPB and inspector-general control changes require agency records, letters and court dockets; they are a separate entity-control/judicial lane, not a zero result here.

Promotion and dedup map

Exact-title and identifier searches found no dedicated canonical live-vault note for the Jul 22–24 delta or any of the 12 prioritized backfill families. America First Trade Policy appears only as contextual source text in EO notes, an ERS-feasibility row and charter_audit.json. Proclamation 11012 appears only as a referenced parallel instrument in two EO notes. Genesis and the Ratepayer Pledge have prior thematic/event coverage, but not the Jul 22–23 objects or their corrected present states. Generated Research Desk and HTML hits are not canonical ingestion.

Recommended review order:

PriorityObject familyRecommended landing
A1Jul 23 presidential memorandum + USTR 60-economy final actionsExecutive instruments plus Trade/Currency Watch; preserve 60 legally separate investigations/actions and Jul 24 effect clock
A2Jul 24 Smithsonian order + Jul 4 DPC reportExecutive instruments / entity-control; pair with Smithsonian trust-instrumentality boundary and the report's 2025/2026 date correction
A3NSPM-1Executive Office entity/control map; it is the interagency decision router
A4NSPM-11 and NSPM-12National-security AI/cyber control architecture; retain every 30–120-day implementation clock
A5Genesis Jul 22 aggregate and agency carriersFederal Science Operating System; correct $5 billion into obligated/planned/selected/in-kind lanes
A6EO 14398 Jul 24 contract deadlineProcurement/government-wide control watch; completion remains unproven
A7Five Apr 20 DPA §303 determinationsEnergy/industrial-base legal-enablement map; not awards or spending
A8OPM suitability delegation + Jul 30 final-rule clockFederal workforce entity/control; delegation not yet effective at cutoff
A9Three Jul 20 Canada Section 338 proclamationsTrade/Currency Watch; three product objects, Aug 19 effect clock
A10Proclamation 11012 Section 122 exitTrade/Currency Watch; expired by its own term, no extension located
B1Ratepayer Pledge expansionData-center/energy subplot as voluntary public/private architecture; validate underlying rate objects before effects
B2Workforce sequence, M-25-31, Oracle Core HCM, OneGov and A-123Federal operating-system/control registry
B3Remaining high-value non-EO registryBackfill as distinct instrument notes with inbound links to existing EO/theme coverage

No live-vault file was modified. The package is ready for human review and selective promotion; the live copy must win after any promotion.

Sources

Document details and formats

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.