Skip to content
Freedom 250 · How it works

How federal research and science funding is set, awarded, reviewed, screened and accepted

This system covers how the federal government decides what science to pay for, picks who does it, checks who is involved, pays for it and decides whether the work delivered is acceptable. The White House sets priorities through OSTP reports, the joint OSTP-OMB research priorities memorandum and executive orders such as EO 14363 (the Genesis Mission); Congress authorizes programs and appropriates the money; PCAST and other boards advise, while the National Science Board, with the Director, governs NSF and approves its major awards. Agencies (NSF, DOE and its Office of Science, NIH, the Department of War, NIST, ARPA-E and others) issue solicitations, review and select proposals, screen people and institutions for research-security risk, and make awards by grant, cooperative agreement, contract, other transaction or laboratory Field Work Proposal; money then moves by obligation, milestone review and outlay, each a separate step. Much of the work is done by DOE national laboratories run by private management-and-operating contractors, by FFRDCs run by private administrators for a federal sponsor, and by universities and companies; the files keep the acceptance decision on delivered work with a named government or owner official, while contractors, test laboratories and certifiers produce the evidence.

The structure

Stages and functions

  1. 1Setting priorities: doctrine, strategy, budget memorandum and executive order
  2. 2Advice and governance boards
  3. 3Money from Congress: authorization, appropriation and budget request
  4. 4Who performs the research: agencies, national laboratories, FFRDCs, universities and companies
  5. 5Asking for proposals: solicitation, request for applications, laboratory call and market research
  6. 6Review and selection
  7. 7Research-security screening of people, institutions and proposals
  8. 8Making the award: the instrument
  9. 9Obligation, milestone review and payment
  10. 10Conditions while the award runs: biosafety, research security and foreign-funding reporting
  11. 11Accepting what is delivered
  12. 12Ending, suspending and contesting awards; oversight
  13. 13International partnerships
Setting priorities: doctrine, strategy, budget memorandum and executive order
N
1
Stage
Setting priorities: doctrine, strategy, budget memorandum and executive order
What happens
The White House sets science priorities through four kinds of document that the files keep apart. OSTP's 'Science: A New Golden Age' (July 21, 2026) is a report to the President that recommends. The National Security Science and Technology Strategy (cover month August 2026) selects security missions and critical and emerging technologies and promises later OSTP and National Security Council plans. The joint OSTP-OMB research priorities memorandum (NSTM-5 / M-26-16, July 21, 2026) tells agencies how to build their FY2028 budget submissions and requires each agency with at least $3 billion of FY2026 research budget authority to send an action plan within 90 days. An executive order (for example EO 14363, the Genesis Mission charter) directs named officers, always subject to law and appropriations. EO 14303 (May 23, 2025) adds a cross-cutting rule for how agencies produce and use scientific information ('Gold Standard Science').
Who
President; OSTP Director (APST); OMB Director; National Security Council; agency heads.
Under what
As the files give it: executive orders resting on 'the Constitution and the laws of the United States of America'; 42 U.S.C. 19221 for the national-security science strategy; the memorandum is administrative guidance.
Record left
Report; strategy; OSTP-OMB memorandum; agency action plans; executive order in the Federal Register.
How long
Action plans: 90 days from July 21, 2026, that is October 19, 2026. The 42 U.S.C. 19221 strategy was due 90 days after the December 4, 2025 National Security Strategy transmission (March 4, 2026); the public strategy carries only the cover month August 2026.
Branches
  • Name
    Report (recommends)
    What
    'Science: A New Golden Age' states doctrine and recommends portable fellowships, fast and long-duration grants, prizes, metascience units and Genesis-scale infrastructure; it cannot appropriate or compel agencies.
    Quotes
    • Quote
      state doctrine, diagnose the old model, recommend institutions and horizon systems
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Name
    Budget memorandum (instructs agencies on budget submissions)
    What
    NSTM-5 / M-26-16 makes Genesis support a central priority and lists funding mechanisms agencies are to consider, bounded by agency authority and appropriations.
    Quotes
    • Quote
      These mechanisms remain bounded by agency authority, conflict rules, scientific rigor and appropriations.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Name
    Strategy (selects missions; assigns to 'relevant agencies')
    What
    The NSSTS names missions, the 14-family technology list and research-security measures, with no appropriation, owner matrix, deadline or metric.
    Quotes
    • Quote
      Most actions are assigned to `relevant agencies`.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NATIONAL_SECURITY_SCIENCE_AND_TECHNOLOGY_STRATEGY_2026.md
  • Name
    Executive order (directs officers)
    What
    EO 14363 charters the Genesis Mission and directs DOE to build and run the American Science and Security Platform; every major command is bounded by law and available appropriations.
    Quotes
    • Quote
      Every major command is bounded by applicable law, security requirements and available appropriations.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Quotes
  • Quote
    direct FY2028 budget formulation and require qualifying agencies' implementation plans
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Quote
    requires each agency with at least $3 billion in FY2026 research budget authority to send an action plan within 90 days (19 October 2026).
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
Points to
  • how-a-federal-action-moves-from-agenda-to-effect (executive-order stages)
Order instructions
  • EO 14303 Secs. 3-8
  • EO 14363 Secs. 2-6
  • EO 14413
  • EO 14179
Examples
  • Stage
    1
    Date
    2026-07-21
    Body
    OSTP and OMB (NSTM-5 / M-26-16)
    What
    FY2028 research priorities memorandum names Genesis support a central priority and requires 90-day agency action plans.
    Stage word
    published
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    It names Genesis support a central priority
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    1
    Date
    2025-11-24
    Body
    President (EO 14363)
    What
    Genesis Mission chartered; Secretary of Energy implements within DOE; APST leads through the NSTC.
    Stage word
    signed; published November 28, 2025 (90 FR 55035)
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    signed Executive Order 14363, "Launching the Genesis Mission."
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    1
    Date
    2026-08
    Body
    President; OSTP (National Security Science and Technology Strategy)
    What
    Strategy with four qualities and five means for national-security science; no appropriation or deadlines.
    Stage word
    public (cover month only)
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
    Thread id
    nssts-strategy
    Quote
    Quote
    The strategy contains no appropriation, agency-by-agency owner matrix,
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Advice and governance boards
N
2
Stage
Advice and governance boards
What happens
Advisory bodies advise; they do not decide. PCAST under EO 14177 advises the President and also carries two statutory roles as the same body. STIB develops options for the Department of War; the Department holds the decision. The NSB is different: it is part of NSF's governance, sets NSF policy and approves major programs and awards, and it also advises the President and Congress. An advisory committee can also end: DOE's Fusion Energy Sciences Advisory Committee ended on August 8, 2025.
Who
PCAST (co-chairs: the APST and the Special Advisor for AI and Crypto); STIB; NSB; National Quantum Initiative Advisory Committee; DOE (funds and supports PCAST).
Under what
EO 14177 (PCAST; also the President's Innovation and Technology Advisory Committee under 15 U.S.C. 5511(b) and the National Nanotechnology Advisory Panel); the Federal Advisory Committee Act functions for PCAST assigned to the Secretary of Energy (EO 14177 Sec. 4(f)); the National Science Foundation Act (NSB).
Record left
Charter or order; appointments; Federal Register meeting notices; adopted reports; for the NSB, resolutions recorded in the Major Actions memorandum.
How long
PCAST terminates two years from January 23, 2025 (January 23, 2027) unless extended. The notes do not record a completed PCAST meeting through November 10, 2026.
Branches
  • Name
    Advisory only (PCAST, STIB)
    What
    A recommendation is a separate step from the agency's response and from any instrument that acts on it.
    Quotes
    • Quote
      The order creates an advisory body; PCAST advice is not an agency rule or appropriation.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md
    • Quote
      Those are statutory hats of the same body in this source; they are not three newly founded councils.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8A_SCIENCE.md
  • Name
    Governing board (NSB)
    What
    The Board approves; the award is still made by NSF's Grants and Agreements Officer.
    Quotes
    • Quote
      This is governance plus advice, not merely external consultation.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_6_DEFENSE_SCIENCE_RESEARCH_INTERFACE_REPORT_2025_2026.md
Quotes
  • Quote
    Under the National Science Foundation Act, the National Science Board together with the Director constitutes NSF.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_6_DEFENSE_SCIENCE_RESEARCH_INTERFACE_REPORT_2025_2026.md
  • Quote
    The notice provides no reason or replacement date.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/PCAST_NOVEMBER_13_CANCELLATION_RETURN_2026-11-10.md
Points to
  • how-a-federal-agency-is-created-organized-and-changed (advisory committees and boards)
Order instructions
  • EO 14177 Secs. 2-6
  • EO 14413 (National Quantum Initiative Advisory Committee)
Examples
  • Stage
    2
    Date
    2026-03-25
    Body
    President (PCAST appointments)
    What
    Thirteen outside members appointed to the EO 14177 council; first-meeting information to follow.
    Stage word
    appointed
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
    Thread id
    pcast
    Quote
    Quote
    announced thirteen outside appointments on March 25, 2026
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
  • Stage
    2
    Date
    2026-11-10
    Body
    DOE (PCAST meeting notice)
    What
    Federal Register document 2026-22918 cancels the November 13 virtual PCAST meeting; no reason or new date.
    Stage word
    cancelled
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/PCAST_NOVEMBER_13_CANCELLATION_RETURN_2026-11-10.md
    Thread id
    pcast
    Quote
    Quote
    DOE cancelled the November 13 virtual PCAST meeting in Federal Register document 2026-22918, published November 10 at 91 FR 72536.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/PCAST_NOVEMBER_13_CANCELLATION_RETURN_2026-11-10.md
  • Stage
    2
    Date
    2025-08-08
    Body
    DOE Fusion Energy Sciences Advisory Committee
    What
    Committee ended.
    Stage word
    ended or withdrawn
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    DOE's Fusion Energy Sciences Advisory Committee ended on August 8, 2025.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
Money from Congress: authorization, appropriation and budget request
N
3
Stage
Money from Congress: authorization, appropriation and budget request
What happens
Congress authorizes programs and, separately, appropriates money; an agency budget request is a proposal to Congress. The files keep the three apart: the Energy Act of 2020 authorized the fusion Milestone Program with a $415 million figure through FY2027; P.L. 119-74 appropriated $805.657 million to Fusion Energy Sciences for FY2026; DOE's FY2027 request proposes a new $1.2 billion Artificial Intelligence and Quantum account and a first $10 million Office of Fusion account, neither enacted. An appropriation can carry a direction (at least $70 million of the $100 million public-private partnership line to the Milestone Program) or a limitation (NDAA section 238, extended by section 215).
Who
Congress; the President (signature); DOE and other agencies (requests).
Under what
P.L. 115-439 (NEIMA), Energy Act of 2020 (within P.L. 116-260), P.L. 118-67 (ADVANCE Act), P.L. 119-74 (FY2026 Energy and Water), P.L. 118-159 section 238 and P.L. 119-60 section 215.
Record left
Public law and explanatory statement; budget justification; apportionment (see the money piece).
How long
Fiscal year; FY2026 Energy and Water enacted January 23, 2026.
Quotes
  • Quote
    the $415 million program figure is a statutory authorization through FY2027, not an appropriation or an award already paid.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
  • Quote
    A budget request is not an appropriation, award or operating capability.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Quote
    The account total demonstrates appropriated public research capital.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Points to
  • how-federal-money-moves-from-appropriation-to-payment (appropriation, apportionment, obligation, outlay)
Examples
  • Stage
    3
    Date
    2026-01-23
    Body
    Congress and the President (P.L. 119-74)
    What
    FY2026 Energy and Water: Fusion Energy Sciences $805.657 million ($634.973 million research, $170.684 million U.S. ITER construction).
    Stage word
    signed or enacted
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    The explanatory table gives Fusion Energy Sciences $805.657 million ($634.973 million research, $170.684 million U.S. ITER construction)
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
  • Stage
    3
    Date
    By 2026-10-05
    Body
    DOE (FY2027 budget request)
    What
    Proposes a new $1.2 billion Artificial Intelligence and Quantum account supporting Genesis.
    Stage word
    proposed
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    DOE's FY2027 budget request proposes a new $1.2 billion Artificial Intelligence and Quantum (AIQ) account supporting Genesis and computing infrastructure.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
Who performs the research: agencies, national laboratories, FFRDCs, universities and companies
N
4
Stage
Who performs the research: agencies, national laboratories, FFRDCs, universities and companies
What happens
Research is performed inside agencies, at DOE national laboratories run by private M&O contractors, at FFRDCs run by private administrators for a federal sponsor, and by universities and companies on awards. The sponsor-center-administrator relationship decides who governs, who operates and who adopts results. For DOE laboratories the M&O contract is the sponsoring agreement, and the contractor (for example UChicago Argonne, LLC) issues the laboratory's own purchase orders and subcontracts. NSF's X-Labs (announced May 14, 2026) opens a lane for independent teams outside traditional institutions.
Who
Sponsoring agency; M&O contractor or FFRDC administrator; university sponsored-programs office and principal investigator; company.
Under what
FAR 35.017 (FFRDC sponsoring agreements); DEAR 970.3501 (DOE contract as sponsoring agreement); the M&O contract (for Argonne, DE-AC02-06CH11357).
Record left
Sponsoring agreement or M&O contract; NCSES master list of FFRDCs (41 centers); laboratory purchase orders and subcontracts.
How long
Contract terms; DOE's July 2026 table lists September 30, 2026 as the current and ultimate end date of Argonne's M&O contract; the notes do not record a successor or extension.
Branches
  • Name
    FFRDC: sponsor governs, administrator operates
    What
    The sponsor manages, funds and governs overall use; a center's publication is not sponsor acceptance or policy.
    Quotes
    • Quote
      The sponsor manages, administers, monitors, funds and governs overall use under FAR 35.017.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_6_DEFENSE_SCIENCE_RESEARCH_INTERFACE_REPORT_2025_2026.md
    • Quote
      A center publication is not sponsor acceptance, agency policy or operation.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_0_EXISTING_CORPUS_RECONCILIATION_2026-09-28.md
  • Name
    DOE laboratory: M&O contractor buys
    What
    Child purchases by the M&O contractor may never show as federal prime awards.
    Quotes
    • Quote
      the commercially meaningful child award may never appear as a federal prime award.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_HIDDEN_ACCEPTANCE_ECONOMY_MAP_2026-08-19.md
Quotes
  • Quote
    `federal sponsor → center ← university/nonprofit/industrial administrator`
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_6_DEFENSE_SCIENCE_RESEARCH_INTERFACE_REPORT_2025_2026.md
  • Quote
    2026-09-30 as the current and ultimate end date for DE-AC02-06CH11357.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_MAP_2026-08-19.md
  • Quote
    NSF announces up to $1.5 billion over a decade for independent, milestone-driven research teams outside traditional institutions.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Points to
  • how-a-federal-agency-is-created-organized-and-changed (FFRDC row)
Examples
  • Stage
    4
    Date
    2026-07-21
    Body
    Argonne National Laboratory through UChicago Argonne, LLC
    What
    Sources-sought notice on SAM.gov for a proposed National Genesis Mission Supercomputing Center of Innovation.
    Stage word
    sources sought
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    Argonne, through its operating contractor UChicago Argonne, LLC, posted a sources-sought notice on SAM.gov
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    4
    Date
    2026-05-14
    Body
    National Science Foundation
    What
    X-Labs: up to $1.5 billion over a decade for independent, milestone-driven teams outside traditional institutions.
    Stage word
    announced
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
    Quote
    Quote
    NSF announces up to $1.5 billion over a decade for independent, milestone-driven research teams outside traditional institutions.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Asking for proposals: solicitation, request for applications, laboratory call and market research
N
5
Stage
Asking for proposals: solicitation, request for applications, laboratory call and market research
What happens
An agency announces what it will fund and how: NSF solicitations (for example NSF 26-513, AI Infrastructure Hubs, posted July 31, 2026), DOE requests for applications and funding opportunity announcements (DE-FOA-0003612, Genesis, March 17, 2026; DE-FOA-0003673, Genesis fellowship pilot, October 8, 2026), and DOE laboratory calls (LAB 26-3601, closed July 24, 2026). A sources-sought notice or request for information is market research, not a solicitation. Since EO 14332 (August 7, 2025) each grant-making agency is to have a senior appointee review new funding opportunity announcements before issue.
Who
Program office (for example DOE Office of Science; NSF directorates); senior appointee under EO 14332; for laboratory notices, the M&O contractor.
Under what
The agency's program statute and appropriation; EO 14332 Sec. 3 (senior-appointee review); the solicitation's own terms.
Record left
Solicitation or funding opportunity number; SAM.gov notice for market research; due dates.
How long
As each notice sets: NSF 26-513 proposals due November 4, 2026; DE-FOA-0003673 letters of intent November 9, 2026, applications January 12, 2027; Argonne responses due August 21, 2026 at 3:00 p.m. CDT.
Branches
  • Name
    Solicitation or request for applications
    What
    Invites proposals for awards; names instrument types, amounts and phases.
    Quotes
    • Quote
      Phase I awards were described at $500,000 to $750,000 for nine months, and Phase II at $6 million to $15 million over three years.
      File
      ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Name
    Sources sought / request for information
    What
    Market research; no solicitation, respondent list or award follows by itself.
    Quotes
    • Quote
      says the request was market research, not a solicitation.
      File
      ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
Quotes
  • Quote
    Executive Order 14332 directs pre-issuance senior-appointee review of funding opportunities and discretionary awards, annual review for consistency with agency priorities and substantial progress, and revised terms permitting termination when an award no longer advances agency priorities or the national interest.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Quote
    NSF will not fund acquisition or operation of compute, data, software, networking, storage or cloud resources.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
Order instructions
  • EO 14332 Secs. 3(a), 3(c)
  • EO 14363 Sec. 5
Examples
  • Stage
    5
    Date
    2026-03-17
    Body
    DOE Office of Science
    What
    Genesis request for applications DE-FOA-0003612, anticipated $293.76 million.
    Stage word
    funding opportunity announced
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    DOE's Office of Science announced a Genesis request for applications (DE-FOA-0003612) with an anticipated $293.76 million.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    5
    Date
    2026-07-31
    Body
    National Science Foundation
    What
    Solicitation NSF 26-513, State and Regional AI Infrastructure Hubs: about ten cooperative agreements; consortia supply the compute.
    Stage word
    solicitation posted; proposals due November 4
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
    Thread id
    nsf-ai-hubs
    Quote
    Quote
    The solicitation anticipates about ten cooperative agreements, $40 million to
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
  • Stage
    5
    Date
    2026-10-08
    Body
    DOE Office of Science
    What
    DE-FOA-0003673, Genesis Mission Graduate Fellowship Pilot: $100 million expected, subject to future appropriations.
    Stage word
    funding opportunity issued
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    DOE's Office of Science issued DE-FOA-0003673, the Genesis Mission Graduate Fellowship Pilot
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
Review and selection
N
6
Stage
Review and selection
What happens
Proposals are reviewed and some are selected. At NSF, merit review decides; for major awards the NSB acts by resolution (for example NSB-2025-16, July 23, 2025, a conditional recommendation for the National Geophysical Facility award). The Board's December 2025 'Merit Review for a New Era at NSF' recommendations (wider reviewer pool including industry and venture capital, competitiveness and national security, portfolio management) are recommendations; the notes do not record an NSF policy or workflow that implements them. At DOE a selection is 'for award negotiations' and is expressly not a commitment to award or fund. EO 14332 tells senior appointees to use their own judgment and to apply listed principles, including a preference for lower indirect cost rates.
Who
Reviewers; program officers; NSB (major awards); DOE selecting official; EO 14332 senior appointee.
Under what
National Science Foundation Act (NSB approval role); the solicitation; EO 14332 Sec. 4.
Record left
NSB Major Actions memorandum; DOE selection list; selection announcement.
How long
Genesis: request issued March 17, 2026; 278 selected July 22, 2026; 18 more October 8, 2026. NSF's agency priority goal on proposal and award processes runs to September 30, 2027.
Branches
  • Name
    NSF major award: Board resolution, then award by the Grants and Agreements Officer
    What
    The resolution is not the award.
    Quotes
    • Quote
      The award is the operative procurement/assistance instrument; the NSB resolution is not.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_12_BSC_FASAB_NSB_ACTION_JOINS_2025_2026.md
  • Name
    DOE: selection for award negotiations
    What
    Selection lists name projects without phase, amount or executed award.
    Quotes
    • Quote
      Selection for award negotiations is not a commitment by DOE to issue an award or provide funding.
      File
      ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
Quotes
  • Quote
    The Board said it would work with NSF leaders on implementation, but that promise is not yet a final NSF policy.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
  • Quote
    the Board's merit-review recommendations
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_SCIENCE_CYBER_FINDINGS_2026-09-28.md
Order instructions
  • EO 14332 Secs. 3(b), 4(a), 4(b)
Examples
  • Stage
    6
    Date
    2025-07-23
    Body
    National Science Board
    What
    Resolution NSB-2025-16 conditionally recommends the National Geophysical Facility operations and maintenance award.
    Stage word
    conditionally recommended
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_12_BSC_FASAB_NSB_ACTION_JOINS_2025_2026.md
    Thread id
    earthscope-award
    Quote
    Quote
    The Board's July 2025 Major Actions memorandum reports that at its 2025-07-23 meeting the Board passed
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_12_BSC_FASAB_NSB_ACTION_JOINS_2025_2026.md
  • Stage
    6
    Date
    2025-12
    Body
    National Science Board
    What
    'Merit Review for a New Era at NSF' recommendations; the Board and NSF returned to merit review in February 2026.
    Stage word
    recommended; not NSF policy
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_SCIENCE_CYBER_FINDINGS_2026-09-28.md
    Thread id
    nsf-merit-review
    Quote
    Quote
    The National Science Board's December 2025 merit-review recommendations did not
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/ACTIVE_BUILDOUT_SCIENCE_CYBER_FINDINGS_2026-09-28.md
  • Stage
    6
    Date
    2026-07-22
    Body
    DOE (Secretary of Energy Chris Wright)
    What
    278 Genesis projects selected for award negotiations under DE-FOA-0003612.
    Stage word
    selected for award negotiations
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    DOE, announced by Secretary of Energy Chris Wright, selected 278 projects for award negotiations under DE-FOA-0003612
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    6
    Date
    2023-05-31
    Body
    DOE Office of Science, Fusion Energy Sciences
    What
    Eight companies selected for the Milestone-Based Fusion Development Program.
    Stage word
    approved or adopted (selected)
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    DOE selected eight companies for the Milestone-Based Fusion Development Program
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
Research-security screening of people, institutions and proposals
N
7
Stage
Research-security screening of people, institutions and proposals
What happens
Before and after an award, agencies screen who is involved. The chain the files give: researcher and institution identifiers; the Biographical Sketch and Current and Pending Support forms; certification against malign foreign talent recruitment programs; institutional cybersecurity, travel and export-control programs (certified by institutions receiving more than $50 million a year); proposal and award analytics; human verification; mitigation or award decision; recurring and event-triggered updates. Each agency runs its own version: NSF analytics, DOE RTES, the Department of War's 2026 decision matrix (prohibited, mitigation required, or no mitigation needed). A list match routes the case; the receiving authority decides the legal effect.
Who
Researcher; institution; NSF OCRSSP; DOE RTES; Department of War component reviewers; SECURE Center (clearinghouse only).
Under what
NSPM-33 and the NSTC implementation guidance; 42 U.S.C. 19231-19237 (talent-program certification); OSTP July 2024 covered-institution guidance; Section 1286 of the FY2019 NDAA and 10 U.S.C. 4001; NDAA section 238 / 215 funding limitation.
Record left
Certified forms; institutional certification; verified inconsistency, clarification, mitigation or award action; for the Department of War, the proposal mitigation decision.
How long
Under 10 U.S.C. 4001, at least 30 days for a proposer suspected of noncompliance to remedy, with an appeal route; annual awardee certification.
Branches
  • Name
    Proposal level (Department of War matrix)
    What
    Prohibited conditions, mitigation factors, five-year lookback; co-authorship alone is not enough to deny.
    Quotes
    • Quote
      says coauthorship and copatenting can inform the risk picture but are not,
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_FACTUAL_LEGAL_MAP_2026-08-17.md
  • Name
    Institution level (August 17, 2026 audits)
    What
    The domestic institution itself became the review subject, tied to future funding eligibility.
    Quotes
    • Quote
      a compulsory institution-level review covering academic, financial and research relationships;
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_FACTUAL_LEGAL_MAP_2026-08-17.md
  • Name
    Lifecycle (DOE RTES)
    What
    Solicitation review, preselection due diligence, post-award reopening on change.
    Quotes
    • Quote
      continuous monitoring is risk- and change-triggered, not universal surveillance
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_AUTHORITY_AND_CONTROL_MATRIX_2026-08-17.md
Quotes
  • Quote
    A list match is a routing signal. The receiving authority determines the
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_ARCHITECTURE_AND_EVIDENCE_MAP_2026-08-17.md
  • Quote
    Institutions receiving more than $50 million annually in federal science and
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/University Funding and Programmable Compliance 2026-07-28/UNIVERSITY_FUNDING_AND_PROGRAMMABLE_COMPLIANCE_MAP_2026-07-28.md
  • Quote
    machine match alone cannot support adverse action
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_AUTHORITY_AND_CONTROL_MATRIX_2026-08-17.md
Points to
  • how-sanctions-export-controls-and-money-laundering-rules-work (the lists themselves: Entity List, 1260H, SDN)
Order instructions
  • EO 14282 Secs. 2-3
Examples
  • Stage
    7
    Date
    2026-01-07
    Body
    Department of War
    What
    Implementation memo: spot checks, shared Fundamental Research Risk Review Repository, reporting of all current and pending support.
    Stage word
    memo issued
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_FACTUAL_LEGAL_MAP_2026-08-17.md
    Thread id
    research-security-screening
    Quote
    Quote
    turns the legal and policy stack into a Department-wide operating program.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_FACTUAL_LEGAL_MAP_2026-08-17.md
  • Stage
    7
    Date
    2026-08-17
    Body
    Department of War (Office of the Under Secretary of War for Research and Engineering)
    What
    Formal notifications to 30 unnamed academic institutions to review foreign ties, mitigate and report by August 31.
    Stage word
    notices asserted issued; reports due
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_RESULTS_2026-10-19.md
    Thread id
    dow-university-research-audits
    Quote
    Quote
    This is the result-stage supplement to the August 17 audit activation.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_RESULTS_2026-10-19.md
Making the award: the instrument
N
8
Stage
Making the award: the instrument
What happens
The award is the signed instrument, made by the agency's warranted official. The files name the instrument types in use: grant; cooperative agreement (for example NSF award 2435260 to EarthScope Consortium Inc., signed September 17, 2025); contract; other transaction agreement (for example DOE's Technology Investment Agreements with the eight fusion companies, signed June 3-5, 2024); Field Work Proposal for national-laboratory work; cooperative research and development agreement (CRADA); and, for CHIPS research awards, a letter of intent followed by a signed final award with an equity condition. Award terms carry the government's conditions: False Claims Act materiality (EO 14292 Sec. 7; NSTM-6), termination for convenience and drawdown authorization (EO 14332 Secs. 5-6).
Who
NSF Grants and Agreements Officer; DOE contracting or agreements officer; Commerce for CHIPS; the recipient.
Under what
The program statute; 2 CFR 200 (Uniform Guidance, as EO 14332 directs it revised); other transaction authority; the award's own terms.
Record left
Executed instrument with award number; award record (NSF Awards API, USAspending); Field Work Proposal records for laboratories.
How long
NSF NGF: Board recommendation July 23, 2025, award signed September 17, 2025, effective October 1, 2025. Fusion: selection May 31, 2023, agreements June 3-5, 2024.
Branches
  • Name
    Laboratory work
    What
    Field Work Proposals and other transactions sit outside one award database.
    Quotes
    • Quote
      Laboratory work may use Field Work Proposals and non-laboratory awards may use Other Transaction Authority, so one federal award database cannot by itself prove complete execution.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
  • Name
    Letter of intent before a final award (CHIPS research)
    What
    Commerce announced letters of intent, then signed final awards on September 8 and 16, 2026 with minority, non-controlling equity interests as a condition.
    Quotes
    • Quote
      `Up to` is a ceiling, not cash paid.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/SCIENCE_SPACE_AND_SEMICONDUCTOR_CAPABILITY_DELTA_2026-10-25.md
    • Quote
      Each final award would be conditioned on a minority, non-voting equity stake.
      File
      ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
Quotes
  • Quote
    The award is the operative procurement/assistance instrument; the NSB resolution is not.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/WAVE_12_BSC_FASAB_NSB_ACTION_JOINS_2025_2026.md
  • Quote
    All eight companies signed Technology Investment Agreements (TIAs) with DOE between June 3 and June 5; DOE announced it on June 6.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
Points to
  • how-federal-money-moves-from-appropriation-to-payment (obligation and award records)
Order instructions
  • EO 14332 Secs. 5(a), 6(b), 6(c)
  • EO 14292 Sec. 7
  • EO 14282 Sec. 3
Examples
  • Stage
    8
    Date
    2025-09-17
    Body
    NSF Grants and Agreements Officer; EarthScope Consortium Inc.
    What
    Cooperative agreement 2435260 signed, performance October 1, 2025 to September 30, 2030, estimated $222,665,168.
    Stage word
    award signed
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
    Thread id
    earthscope-award
    Quote
    Quote
    identifies EarthScope, a September 17, 2025 signature, an October 1 effective date, an estimated total value of $222,665,168, and $59,175,664 obligated through the cutoff.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
  • Stage
    8
    Date
    2024-06-03
    Body
    DOE and the eight Milestone companies
    What
    Technology Investment Agreements signed June 3-5; first obligations $46 million.
    Stage word
    signed or enacted
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    The first obligations under them total $46 million, for the first 18 months.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
  • Stage
    8
    Date
    2026-09-08
    Body
    Department of Commerce (CHIPS R&D)
    What
    Signed final quantum CHIPS research awards (September 8 and 16), with minority, non-controlling equity interests as a condition.
    Stage word
    final award signed
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/SCIENCE_SPACE_AND_SEMICONDUCTOR_CAPABILITY_DELTA_2026-10-25.md
    Thread id
    quantum-chips-awards
    Quote
    Quote
    Commerce announced signed final CHIPS R&D awards on September 8 and 16:
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/SCIENCE_SPACE_AND_SEMICONDUCTOR_CAPABILITY_DELTA_2026-10-25.md
Obligation, milestone review and payment
N
9
Stage
Obligation, milestone review and payment
What happens
Money moves in separate steps after the award. An estimated total is not obligated money; NSF funds many agreements in yearly increments subject to funds (EarthScope: $222,665,168 estimated, $59,175,664 obligated through the cutoff; NSF Materials Innovation Platforms: $9.1 million obligated against $54.45 million estimated). In DOE's fusion Milestone Program, payment depends on DOE's review of negotiated milestones; USAspending through August 15, 2026 records $110.685 million obligated and $28.490 million in linked outlays across the eight agreements. An outlay is a disbursement linked to an award and does not by itself identify which milestone was settled. EO 14332 Sec. 6(c) directs terms barring drawdowns without agency authorization.
Who
Agency program and finance offices; recipient; DOE milestone reviewers.
Under what
The award's payment terms; EO 14332 Sec. 6(c) (drawdown authorization); 2 CFR 200.305 (see the money piece).
Record left
Obligation revisions and outlays on USAspending; NSF award record; DOE milestone verification (company releases report several).
How long
Milestone Program: first $46 million obligated for the first 18 months; January 10-15, 2025 revisions added $36.6 million; positive 2026 revisions for Zap (June 1), Thea (June 9) and CFS (July 13).
Branches
  • Name
    Milestone payment (fusion)
    What
    Review of a negotiated milestone, then payment; CFS reported DOE validation of its magnet milestone and an $8 million payment on September 30, 2025.
    Quotes
    • Quote
      Payments are conditional on satisfactory review of negotiated milestones.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
    • Quote
      CFS reported that DOE validated its full-scale toroidal-field magnet milestone and paid $8 million.
      File
      ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
  • Name
    Yearly increments (NSF)
    What
    Annual obligation subject to funds and performance.
    Quotes
    • Quote
      provides funding yearly, subject to funds.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
Quotes
  • Quote
    An outlay is a disbursement linked to an award; it does not establish
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
  • Quote
    identifies EarthScope, a September 17, 2025 signature, an October 1 effective date, an estimated total value of $222,665,168, and $59,175,664 obligated through the cutoff.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/WAVE_2_SCIENCE_MISSION_FINDINGS_2026-09-28.md
  • Quote
    Never convert an authorization ceiling, roadmap estimate, requested amount, selection for negotiation or private-investment total into an obligated federal award.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_IMPLEMENTATION_WATCHBOARD.md
Points to
  • how-federal-money-moves-from-appropriation-to-payment (drawdown and cash release)
Order instructions
  • EO 14332 Sec. 6(c)
Examples
  • Stage
    9
    Date
    2025-09-30
    Body
    Commonwealth Fusion Systems (company report)
    What
    Reported DOE validation of the full-scale toroidal-field magnet milestone and an $8 million payment.
    Stage word
    stated by the body
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    CFS reported that DOE validated its full-scale toroidal-field magnet milestone and paid $8 million.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
  • Stage
    9
    Date
    2026-08-15
    Body
    DOE (USAspending, as the registry read it)
    What
    Eight Milestone agreements: $110.685 million obligated, $28.490 million linked outlays.
    Stage word
    obligated; outlaid
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-milestone-money
    Quote
    Quote
    the eight Milestone agreements record $110.685 million obligated and $28.490 million in linked outlays
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
  • Stage
    9
    Date
    2026-08-03
    Body
    National Science Foundation
    What
    Two Materials Innovation Platforms and a transition award: $9.1 million obligated against $54.45 million estimated.
    Stage word
    announced; partly obligated
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
    Thread id
    nsf-materials-awards
    Quote
    Quote
    The inspected present obligation is therefore $9.1 million, not $54.45 million
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Infrastructure and Industrial Enablement Full-Surface Wave 2026-08-04/INFRASTRUCTURE_INDUSTRIAL_ENABLEMENT_FULL_SURFACE_WAVE_2026-08-04.md
Conditions while the award runs: biosafety, research security and foreign-funding reporting
N
10
Stage
Conditions while the award runs: biosafety, research security and foreign-funding reporting
What happens
Conditions attach to the funding relationship. Biosafety: the 'United States Government Policy for Stopping High-Risk Life Sciences Research' (dated July 20, 2026, announced July 28) bars federal funding of dangerous gain-of-function research and of federally funded life-science research involving countries or entities of concern, and allows potential dangerous gain-of-function research only after institutional review and a recommendation from a single independent federal review body; NSTM-6 (November 5, 2026) requires federally funded buyers of synthetic nucleic acids to buy through HHS/USDA-listed Adherent Suppliers using NIST-verified Screeners. Research security after award: Department of War annual spot checks and its August 17, 2026 audits of 30 universities; DOE RTES reopening. Foreign-funding reporting: Section 117 investigations by Education and State (September 15, 2026). Department of War contracts with universities hosting a Confucius Institute: waiver authority ended October 1, 2026.
Who
Principal investigator; institution and its review entity; funding agency; OSTP; HHS and USDA; NIST; Department of War; Department of Education and Department of State.
Under what
EO 14292 and the July 20, 2026 policy; NSTM-6; the January 7, 2026 Department of War implementation memo; DFARS 252.209-7011; 20 U.S.C. 1011f; award terms.
Record left
Attestations and disclosures; institutional review records; annual reports; audit reports to the Department; investigation letters; supplier list.
How long
High-risk policy: 180-day institutional implementation clock. NSTM-6: standards, verification, supplier list and procurement gates phase in over 340 days. Department of War audits: reports due August 31, 2026; results reported October 19, 2026. Section 117: production within 30 calendar days of September 15, 2026.
Branches
  • Name
    Biosafety review
    What
    Prohibited, review-required and assessment-required lanes.
    Quotes
    • Quote
      permissible only after institutional review and a recommendation from the independent third-party review body that the project, with its mitigation plan, does not meet the DGOF definition.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Covid/HHS High-Risk Life Sciences Research Policy 2026-07-28/HHS_HIGH_RISK_LIFE_SCIENCES_RESEARCH_POLICY_DELTA_2026-07-28.md
  • Name
    Synthesis screening (NSTM-6)
    What
    The mandate runs through federal money.
    Quotes
    • Quote
      The direct mandate therefore runs through Federal money.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Nucleic Acid Synthesis Screening 2026-11-05/README.md
  • Name
    Institutional audit (Department of War)
    What
    Notice, institution review, mitigation, direct report; results reported by the Department.
    Quotes
    • Quote
      It does not establish 30 findings of wrongdoing, a government-wide exclusion, an award termination, a payment hold, a repayment, a suspension or debarment, or an independently audited result.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_RESULTS_2026-10-19.md
  • Name
    Foreign-funding reporting (Section 117)
    What
    Investigation notice and records demand; stakes include Title IV participation.
    Quotes
    • Quote
      Noncompliance risks ED OGC / DOJ civil recoupment of investigation costs and **Title IV participation**.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_3A_NAMED_STATUS_VEHICLES.md
Quotes
  • Quote
    Award terms are to make compliance material to payment under the False Claims
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Nucleic Acid Synthesis Screening 2026-11-05/README.md
  • Quote
    annual spot checks of every fundamental-research award with mitigation and at
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_FACTUAL_LEGAL_MAP_2026-08-17.md
Points to
  • how-federal-health-programs-pay-and-how-medical-products-are-approved (NIH and HHS)
Order instructions
  • EO 14292 Secs. 3-7
  • EO 14282 Sec. 2
  • EO 14303 Sec. 4
Examples
  • Stage
    10
    Date
    2026-07-20
    Body
    United States Government (policy announced by HHS July 28)
    What
    Policy for Stopping High-Risk Life Sciences Research.
    Stage word
    policy issued; announced July 28
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Covid/HHS High-Risk Life Sciences Research Policy 2026-07-28/HHS_HIGH_RISK_LIFE_SCIENCES_RESEARCH_POLICY_DELTA_2026-07-28.md
    Thread id
    eo-14292-bio-research-safety
    Quote
    Quote
    Document dated July 20; publicly linked July 28
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Covid/HHS High-Risk Life Sciences Research Policy 2026-07-28/HHS_HIGH_RISK_LIFE_SCIENCES_RESEARCH_POLICY_DELTA_2026-07-28.md
  • Stage
    10
    Date
    2026-11-05
    Body
    National Security Advisor and OSTP Director (NSTM-6)
    What
    National nucleic-acid synthesis screening policy.
    Stage word
    signed
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Nucleic Acid Synthesis Screening 2026-11-05/README.md
    Thread id
    nstm-6-synthesis-screening
    Quote
    Quote
    signed by National Security Advisor Marco Rubio and Assistant to
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/Nucleic Acid Synthesis Screening 2026-11-05/README.md
  • Stage
    10
    Date
    2026-09-15
    Body
    Department of Education Office of the General Counsel, with State
    What
    Section 117 notices to Duke University and the University of North Dakota; records due in 30 calendar days.
    Stage word
    investigation opened
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_4A_EXECUTIVE_HUMAN_LIBRARIES.md
    Thread id
    section-117-investigations
    Quote
    Quote
    UND: no reports before July 2020; 71 qualifying transactions since then valued at ~$98 million
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_4A_EXECUTIVE_HUMAN_LIBRARIES.md
  • Stage
    10
    Date
    2026-10-19
    Body
    Department of War
    What
    Reports the 30 initial audits complete, all fully mitigated, more than 80 termination-related actions; names seven institutions.
    Stage word
    issuer-reported results
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_RESULTS_2026-10-19.md
    Thread id
    dow-university-research-audits
    Quote
    Quote
    The Department reports more than 80
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_RESULTS_2026-10-19.md
Accepting what is delivered
N
11
Stage
Accepting what is delivered
What happens
Delivery and acceptance are different steps, and the files keep the acceptance decision with a named government or owner official. Contractors, test laboratories, calibration firms and commissioning agents produce evidence; the government range safety officer keeps the permission-to-fire decision; NIST validates cryptographic modules after a laboratory tests them; the agency authorizing official accepts a system's configuration and residual risk; for DOE laboratory purchases the M&O contractor and DOE officials keep the decision. DOE relies in part on contractor self-assurance, which GAO (August 26, 2026) found lacked a definition of 'effective' and measurable criteria. Company reports of DOE approval (Thea, Zap, Xcimer preconceptual designs) are company-reported until a DOE record is cited. Licensing of a machine is a separate system (for fusion: NRC's proposed rule and Agreement States).
Who
Owner or government authority (program office, range safety officer, NIST, agency authorizing official, contracting officer); evidence producers (contractors and laboratories); GAO.
Under what
The contract or award's acceptance terms; DOE contractor-assurance policy; for cryptography, NIST's validation program.
Record left
Test, calibration and commissioning records; validation certificate; authorization to operate; acceptance or disposition record; GAO report.
How long
The files do not give a standard time.
Branches
  • Name
    Physical test (range safety)
    What
    Contractors calculate hazards and calibrate; the government officer fires.
    Quotes
    • Quote
      For laser and HPM work, the government range safety officer retains the permission-to-fire decision.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_MAP_2026-08-19.md
  • Name
    System authorization
    What
    The agency authorizing official accepts residual risk.
    Quotes
    • Quote
      The agency authorizing official accepts the system configuration and residual risk.
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md
  • Name
    Contractor self-assurance (DOE)
    What
    Contractor identifies and corrects problems; federal overseers tailor their own work.
    Quotes
    • Quote
      An `effective` declaration without criteria is not an independently verified
      File
      ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/DOE_CONTRACTOR_ASSURANCE_GAO_DELTA_2026-10-25.md
Quotes
  • Quote
    federal award or sources sought → M&O/nonprofit/consortium operator → private PO, PSA or subcontract → test/commissioning evidence → owner or government disposition
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_HIDDEN_ACCEPTANCE_ECONOMY_MAP_2026-08-19.md
  • Quote
    those retain the provenance
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
Points to
  • how-federal-information-systems-and-ai-are-built-authorized-and-secured (authorization to operate)
  • how-the-armed-forces-are-funded-and-buy (test and acceptance in defense buying)
Examples
  • Stage
    11
    Date
    2026-08-26
    Body
    Government Accountability Office (GAO-26-107850)
    What
    DOE contractor-assurance review at Idaho, Los Alamos and Hanford; four recommendations; DOE concurred.
    Stage word
    report issued; recommendations open
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/DOE_CONTRACTOR_ASSURANCE_GAO_DELTA_2026-10-25.md
    Thread id
    science-acceptance-control
    Quote
    Quote
    It made four recommendations:
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Government Hidden Control Surfaces 2026/DOE_CONTRACTOR_ASSURANCE_GAO_DELTA_2026-10-25.md
  • Stage
    11
    Date
    2026-01-13
    Body
    Thea Energy (company report)
    What
    Reported DOE certification or approval of the Helios preconceptual design; the notes do not record a matching DOE record.
    Stage word
    stated by the body
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
    Thread id
    fusion-commercialization
    Quote
    Quote
    Thea Energy reported that DOE certified or approved the preconceptual design of its Helios plant.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/fusion-commercialization.md
Ending, suspending and contesting awards; oversight
N
12
Stage
Ending, suspending and contesting awards; oversight
What happens
An award can end before its term. EO 14332 directs that discretionary grants permit termination for convenience and that awards no longer advancing agency priorities can be terminated; OMB's revision of the Uniform Guidance is recorded at the proposal stage. Commerce terminated the SMART USA award for convenience and withdrew funding. A suspension is a different step from a termination or debarment (NIH's July 8, 2020 letter to EcoHealth invoked 45 C.F.R. 75.371). Recipients litigate: in Trump v Thakur (No. 26-210) the government asks the Supreme Court to review limits on terminating academic-research grants because of the projects' viewpoints; distributed for the November 13, 2026 conference. GAO and inspectors general audit and recommend.
Who
Agency head and senior appointee; awarding official; recipient; courts; GAO; inspectors general.
Under what
EO 14332 Secs. 5-6; award terms; 45 C.F.R. 75.371 (as the 2020 letter cites it); NIH Grants Policy Statement 8.5.2.
Record left
Termination or suspension notice; court docket; GAO or OIG report.
How long
The files do not give standard times.
Quotes
  • Quote
    Commerce terminated the
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_MAP_2026-08-18.md
  • Quote
    The government's October 27 reply asks the Court to review limits on terminating academic-research grants because of the funded projects' viewpoints.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/RESEARCH_FUNDING_AND_ADMISSIONS_CASES_2026-10-30.md
  • Quote
    The mapped state remained proposal pending.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md
Points to
  • who-watches-the-oversight-bodies-and-what-each-can-actually-do
Order instructions
  • EO 14332 Secs. 5(a), 6(a), 6(b)
Examples
  • Stage
    12
    Date
    2026-10-28
    Body
    Supreme Court of the United States
    What
    Trump v Thakur (No. 26-210) distributed for the November 13, 2026 conference.
    Stage word
    distributed for conference
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/RESEARCH_FUNDING_AND_ADMISSIONS_CASES_2026-10-30.md
    Thread id
    trump-v-thakur
    Quote
    Quote
    records respondents' October 19 opposition, the October 27 reply and October 28 distribution for the **November 13 conference**.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Education/RESEARCH_FUNDING_AND_ADMISSIONS_CASES_2026-10-30.md
  • Stage
    12
    Date
    2026 (date not given)
    Body
    Department of Commerce
    What
    SMART USA digital-twin manufacturing institute award terminated for convenience; funding withdrawn.
    Stage word
    terminated
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_MAP_2026-08-18.md
    Thread id
    smart-usa-termination
    Quote
    Quote
    award for convenience and withdrew federal funding.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_MAP_2026-08-18.md
International partnerships
N
13
Stage
International partnerships
What happens
U.S. agencies make science partnerships with foreign governments under their own national institutions. DOE with Japan's MEXT and METI announced a planned five-year Genesis partnership of a combined $1 billion, split equally and subject to future appropriations (June 4, 2026). The Kyoto Vision is a 17-country non-binding declaration with no fund or secretariat; the first named follow-through was national (NSF's Office of Metascience; DOE's metascience initiative) and a joint NSF-UKRI statement. U.S. ITER construction is funded within Fusion Energy Sciences ($170.684 million in FY2026).
Who
DOE; NSF; Department of State; foreign ministries and funders.
Under what
Agency authorities; the partnership instruments as announced.
Record left
Joint announcement or statement; later project agreements (none recorded for the Japan teams).
How long
Japan partnership: five years, subject to appropriations.
Quotes
  • Quote
    These are U.S. agency actions under existing national
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/KYOTO_VISION_NATIONAL_AND_SHARED_IMPLEMENTATION_RETURN_2026-10-12.md
  • Quote
    The announcement is an institutional and funding plan, not proof of a fusion
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
Points to
  • how-the-united-nations-and-international-agreements-work
Examples
  • Stage
    13
    Date
    2026-06-04
    Body
    DOE with Japan's MEXT and METI
    What
    Planned five-year Genesis partnership, combined $1 billion, subject to future appropriations.
    Stage word
    announced
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
    Thread id
    genesis-mission-awards
    Quote
    Quote
    DOE and Japan's Ministry of Education, Culture, Sports, Science and Technology (MEXT) and Ministry of Economy, Trade and Industry (METI) announced a planned five-year Genesis partnership
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 4/genesis-mission-awards.md
  • Stage
    13
    Date
    2026-10-08
    Body
    NSF; DOE
    What
    NSF Office of Metascience; DOE metascience initiative and Golden Ticket pilot, announced at the October 8 summit.
    Stage word
    announced
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/KYOTO_VISION_NATIONAL_AND_SHARED_IMPLEMENTATION_RETURN_2026-10-12.md
    Thread id
    metascience-units
    Quote
    Quote
    NSF announced an Office of Metascience and new review/funding
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Science Operating System/KYOTO_VISION_NATIONAL_AND_SHARED_IMPLEMENTATION_RETURN_2026-10-12.md
Full diagram description
# Diagram description: how federal research and science funding is set, awarded, reviewed, screened and accepted This describes the picture; it does not draw it. Read with `how-federal-research-and-science-funding-is-awarded-reviewed-and-accepted.md`. Time runs left to right, following one award from priority to acceptance. Legal authority runs top to bottom. Money runs in its own lane at the bottom. Every arrow is an instruction, a recommendation, an application, a decision, a payment, a piece of evidence or a record; research results themselves are not drawn as moving. ## Layout Six horizontal bands, top to bottom: 1. **Priority band**: the President, OSTP (its Director is the APST), OMB, the National Security Council, and the documents they issue. 2. **Advice and governance band**: PCAST, STIB, NQIAC (advisory, drawn with dashed outlines) and the National Science Board (governing, drawn with a solid outline inside the NSF frame in band 3). 3. **Funding agency band**: NSF, DOE (Office of Science, Office of Fusion, ARPA-E, RTES, NNSA), NIH within HHS, the Department of War (Office of the Under Secretary of War for Research and Engineering; DARPA), NIST within Commerce (with the CHIPS Research and Development Office), the Department of Education with the Department of State (Section 117). 4. **Performer band**: DOE national laboratories inside an "M&O contractor" frame (example label: UChicago Argonne, LLC, contract DE-AC02-06CH11357, end date September 30, 2026); FFRDCs inside an "administrator" frame (MITRE, RAND, IDA); universities; companies (example: the eight Milestone companies); the Genesis Mission Consortium drawn as a dotted cloud labelled "membership is not a contract". 5. **Evidence and acceptance band**: contracted evidence producers (test laboratories, calibration, commissioning, independent engineers, support contractors) on the left; acceptance holders on the right (program office, government range safety officer, NIST validation, agency authorizing official, DOE with the M&O contractor). 6. **Money and record band**: Congress's appropriation at the left, then estimated total, obligation, milestone review, outlay; record boxes beneath (NSF Awards API, USAspending, Field Work Proposal records, Federal Register). Two side columns: on the far left, **Congress** (authorization and appropriation, plus the NDAA section 238/215 funding limitation); on the far right, **Review and remedy** (federal courts and the Supreme Court, GAO, inspectors general). A small box outside the frame at the bottom right: **Foreign partners** (Japan's MEXT and METI; UKRI; ITER). ## Boxes in the priority band (left to right) - **Executive orders**, one stacked box: EO 14177 (PCAST, Jan 23, 2025), EO 14292 (biological research, May 5, 2025), EO 14303 (Gold Standard Science, May 23, 2025), EO 14332 (grant oversight, Aug 7, 2025), EO 14363 (Genesis Mission, Nov 24, 2025), EO 14413 (quantum, Jun 22, 2026). Label: "246 instructions in 20 orders; see list". - **'Science: A New Golden Age'** (OSTP report, Jul 21, 2026), label "recommends". - **NSTM-5 / M-26-16** (OSTP-OMB memorandum, Jul 21, 2026), label "FY2028 budget instructions; action plans due Oct 19, 2026". - **National Security Science and Technology Strategy** (cover month Aug 2026), label "assigns to 'relevant agencies'". - **High-risk life-sciences policy** (dated Jul 20, 2026) and **NSTM-6** (Nov 5, 2026), drawn together, label "conditions on federally funded life-science work". ## Arrows (each labelled with what it means) 1. Congress → each funding agency: "authorizes; appropriates" (two parallel arrows, one solid for appropriation, one dashed for authorization, with the note "$415 million Milestone figure is an authorization"). 2. Each agency → Congress: dashed arrow "budget request (proposal)", example "FY2027 AIQ account $1.2 billion, proposed". 3. President → OSTP, OMB, agencies: "executive order directs". 4. OSTP + OMB → agencies: "budget memorandum instructs"; agencies → OSTP and OMB: "action plan" (drawn dotted, label "notes do not record any plan"). 5. PCAST → President, STIB → Department of War: dotted "advice"; the receiving body's box shows "decision stays here". 6. National Science Board → NSF Grants and Agreements Officer: "conditional recommendation (resolution)", then Grants and Agreements Officer → performer: "award (cooperative agreement)". Example on the arrows: NSB-2025-16 (Jul 23, 2025) → award 2435260 (signed Sep 17, 2025) → EarthScope Consortium Inc. 7. Agency → performers: "solicitation / request for applications" (examples DE-FOA-0003612, Mar 17, 2026; NSF 26-513, Jul 31, 2026). A separate thinner arrow from the M&O contractor to companies: "sources sought (market research)". 8. Performers → agency: "proposal". 9. Agency → performers: "selection for award negotiations (no commitment)" (example: 278 Genesis selections, Jul 22, 2026), then a gap, then "executed instrument". Draw the gap as a broken arrow labelled "notes do not record executed Genesis awards". 10. Research-security gate: a vertical gate drawn across arrows 8 to 9, labelled with its parts left to right: "disclosures and certifications" → "analytics (NSF) / due diligence (DOE RTES) / decision matrix (Department of War)" → "human verification" → "prohibited, mitigation required, or no mitigation needed". A side arrow into the gate from the far-left list box "lists (Section 1286, 1260H, Entity List, SDN)" labelled "routing signal; the receiving authority decides the effect". A second arrow from the gate back to the performer after award, labelled "post-award reopening / spot checks / institutional audit (30 universities, Aug 17 to Oct 19, 2026)". 11. Award instrument types: a fan of five small boxes hanging from the "executed instrument" point: grant; cooperative agreement; contract; other transaction / Technology Investment Agreement; Field Work Proposal (laboratories); plus CHIPS "letter of intent → final award with equity condition". 12. Money lane: appropriation → "estimated total" → "obligation" → (for milestone awards) "milestone review by DOE" → "outlay". Example numbers on the lane: EarthScope $222,665,168 estimated / $59,175,664 obligated; Milestone Program $110.685 million obligated / $28.490 million outlaid (as of Aug 15, 2026). Mark the link from "outlay" back to a named milestone as a dashed line labelled "join not recorded". 13. Conditions arrows from the high-risk policy and NSTM-6 boxes down to performers: "award term; compliance material to payment (False Claims Act)"; from Education and State to universities: "Section 117 investigation (Sep 15, 2026)". 14. Performers → evidence producers → acceptance holders: "deliverable" then "evidence" then "acceptance decision". Draw the acceptance decision only on the acceptance-holder side. A dashed arrow from companies directly to the money lane labelled "company-reported DOE approval" stops short of the DOE box. 15. GAO → DOE: "audit; four recommendations (GAO-26-107850, Aug 26, 2026)". 16. Agency → performer, red dashed: "termination for convenience / suspension" (examples SMART USA; EO 14332 terms). Performer → courts: "challenge" (Trump v Thakur, conference Nov 13, 2026). 17. DOE ↔ Japan's MEXT and METI: double arrow "planned partnership, subject to appropriations (Jun 4, 2026)". ## Where time and authority flow - Authority flows down from the President and Congress to agencies, and from agencies to performers by instrument; it does not flow upward from performers or evidence producers. - Advice flows upward or sideways (PCAST to President, STIB to the Department of War, NSB to the NSF award officer) and is always shown as dotted, except the NSB's approval, which is solid because the NSB is part of NSF's governance. - Money flows only along the bottom lane, and each step is its own box. - Time markers along the top edge: Jan 23, 2025 (EO 14177); Aug 7, 2025 (EO 14332); Nov 24, 2025 (EO 14363); Mar 17, 2026 (DE-FOA-0003612); Jul 20-22, 2026 (high-risk policy; M-26-16; 278 selections); Aug 17, 2026 (Department of War notices); Oct 8, 2026 (Phase II selections; fellowship notice); Oct 19, 2026 (audit results; action-plan date); Nov 5, 2026 (NSTM-6); Nov 24, 2026 (first Genesis report due).

Stories that rest on this

Graphics and studies