How it entered the Observatory
The saved starting points
- Earliest thread file
- Date
- 2026-08-15
- File
- Federal Science Operating System/FEDERAL_FUSION_COMMERCIALIZATION_BRIDGE_2020-2035.md
- Note
- The fusion bridge and the date/time/place ledger carry an August 15, 2026 evidence cutoff; the Federal Science Operating System package itself began July 22, 2026 with the White House science page.
- Katie requests
- Date
- 2026-08-15 19:05 UTC
- Request
- K03-041
- Her words
- The Department of Energy X account just posted about Fusion power - this will be a perfect addition to the observatory!!!
- Why
- A DOE X post.
- Files
- Federal Science Operating System/FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md
- Federal Science Operating System/FEDERAL_FUSION_COMMERCIALIZATION_BRIDGE_2020-2035.md
- Package first request
- Date
- 2026-07-22
- Request
- K02-001
- Her words
- This was just released - might be interesting to add into our innovation plotlines - let's read and analyze and discuss!!
The dated steps
2019-01-14NEIMA became law.
NEIMA became law. Its section 103(a)(4) set December 31, 2027 as the deadline for the Nuclear Regulatory Commission (NRC) to finish a technology-inclusive optional licensing framework.
Who acted: Congress and the President (Nuclear Energy Innovation and Modernization Act, NEIMA, P.L. 115-439)
Stage: signed or enacted
NEIMA enacted 2019-01-14 already set 2027-12-31
2020-12-27 Turning pointThe Energy Act of 2020 authorized the Department of Energy (DOE) milestone-based fusion development program.
The Energy Act of 2020 authorized the Department of Energy (DOE) milestone-based fusion development program.
Who acted: Congress and the President (Energy Act of 2020, within P.L. 116-260)
Stage: signed or enacted
Energy Act of 2020 milestone-program authorization enacted within P.L. 116-260
2022-03-17OSTP and DOE held a fusion summit, scheduled 10:00 a.m. to 1:00 p.m.
OSTP and DOE held a fusion summit, scheduled 10:00 a.m. to 1:00 p.m. Eastern; the agenda does not give the venue.
Who acted: White House Office of Science and Technology Policy (OSTP) and DOE (official agenda)
Stage: scheduled
White House fusion summit scheduled opening and event window
2022-12-05NIF's first ignition shot produced 3.15 MJ of fusion energy from 2.05 MJ of laser energy delivered to the target.
NIF's first ignition shot produced 3.15 MJ of fusion energy from 2.05 MJ of laser energy delivered to the target.
Who acted: Lawrence Livermore National Laboratory, National Ignition Facility (NIF)
Stage: other
On December 5, 2022, the National Ignition Facility produced 3.15 MJ of fusion energy from 2.05 MJ of laser energy delivered to the target.
2023-04-13NRC chose to license fusion machines under its byproduct-material rules (10 CFR Part 30) rather than as reactors.
NRC chose to license fusion machines under its byproduct-material rules (10 CFR Part 30) rather than as reactors.
Who acted: Nuclear Regulatory Commission (NRC)
Stage: approved or adopted
NRC selected the Part 30 approach on 2023-04-13.
2023-05-31 Turning pointDOE selected eight companies for the Milestone-Based Fusion Development Program: Commonwealth Fusion Systems, Focused Energy, Realta Fusion, Thea Energy, Tokamak Energy, Type One Energy, Xcimer Energy and Zap Energy.
DOE selected eight companies for the Milestone-Based Fusion Development Program: Commonwealth Fusion Systems, Focused Energy, Realta Fusion, Thea Energy, Tokamak Energy, Type One Energy, Xcimer Energy and Zap Energy.
Who acted: U.S. Department of Energy (DOE), Office of Science, Fusion Energy Sciences
Stage: approved or adopted
DOE selects eight Milestone Program recipients
2024-06-03 Turning pointAll eight companies signed Technology Investment Agreements (TIAs) with DOE between June 3 and June 5; DOE announced it on June 6.
All eight companies signed Technology Investment Agreements (TIAs) with DOE between June 3 and June 5; DOE announced it on June 6. The first obligations under them total $46 million, for the first 18 months.
Who acted: DOE and the eight selected companies
Stage: signed or enacted
The initial June 2024 obligations total exactly $46 million.
2024-06-06DOE published its 2024 Fusion Energy Strategy, joining the Milestone Program, INFUSE, FIRE Collaboratives and a proposed public-private consortium.
DOE published its 2024 Fusion Energy Strategy, joining the Milestone Program, INFUSE, FIRE Collaboratives and a proposed public-private consortium.
Who acted: DOE
Stage: published
DOE Fusion Energy Strategy 2024 published; strategy clock
2024-07-09The ADVANCE Act became law.
The ADVANCE Act became law. Section 205 added 'fusion machine' to the Atomic Energy Act, brought fusion-made radioactive material into the byproduct-material definition, amended related NEIMA provisions, kept the December 31, 2027 date, and in section 205(c) required a separate report on mass-manufactured fusion machines within one year.
Who acted: Congress and the President (ADVANCE Act, P.L. 118-67, section 205)
Stage: signed or enacted
Where the files differ: Before September 7, 2026 the files credited the 2027 deadline to ADVANCE section 205. The bridge (September 7 correction) and the ledger (November 8 reconciliation) now credit NEIMA section 103(a)(4), 2019.
ADVANCE Act section 205 enacted
2024-07-15WHAM, a 17-tesla mirror machine at the Physical Sciences Laboratory in Stoughton, Wisconsin, made its first plasma.
WHAM, a 17-tesla mirror machine at the Physical Sciences Laboratory in Stoughton, Wisconsin, made its first plasma.
Who acted: University of Wisconsin-Madison and Realta Fusion (WHAM machine)
Stage: first use
first plasma 2024-07-15
2024-10-24Commonwealth Fusion Systems (CFS) reported that Massachusetts granted a broad-scope radioactive-materials license for its SPARC machine at Devens.
Commonwealth Fusion Systems (CFS) reported that Massachusetts granted a broad-scope radioactive-materials license for its SPARC machine at Devens.
Who acted: Commonwealth Fusion Systems (company report of a Massachusetts license)
Stage: approved or adopted
Massachusetts broad-scope radioactive-materials license for SPARC reported granted 2024-10-24
2024-12-05A $52 million upgrade of Tokamak Energy's ST40 machine in Oxfordshire was announced, split evenly among DOE, DESNZ and the company.
A $52 million upgrade of Tokamak Energy's ST40 machine in Oxfordshire was announced, split evenly among DOE, DESNZ and the company.
Who acted: Tokamak Energy, DOE and the UK Department for Energy Security and Net Zero (DESNZ)
Stage: announced
$52 million ST40 upgrade announced 2024-12-05, divided evenly among DOE, UK DESNZ and Tokamak Energy
2025DOE set up the Office of Fusion to lead roadmap implementation and act as the department's main contact; Fusion Energy Sciences keeps foundational science, enabling technologies and facilities.
DOE set up the Office of Fusion to lead roadmap implementation and act as the department's main contact; Fusion Energy Sciences keeps foundational science, enabling technologies and facilities.
Who acted: DOE (Office of Fusion; Fusion Energy Sciences)
Stage: other
DOE established the Office of Fusion as the roadmap implementation lead and primary departmental interface
2025-01-10Revisions to the eight Milestone agreements added $36.6 million in obligations.
Revisions to the eight Milestone agreements added $36.6 million in obligations.
Who acted: DOE (award records on USAspending)
Stage: other
January 10–15, 2025 revisions add $36.6 million.
2025-01-16DOE published an update naming five completed early milestones (two Focused Energy, one Realta, two Thea) and saying the other five companies were still working on early milestones.
DOE published an update naming five completed early milestones (two Focused Energy, one Realta, two Thea) and saying the other five companies were still working on early milestones. The same release selected six teams for the first round of FIRE Collaboratives.
Who acted: DOE
Stage: stated by the body
DOE's January 16, 2025 public update independently identified five completed early milestones
2025-02-25Zap Energy reported that DOE certified completion of a three-hour, 1,080-shot milestone on its Century test platform.
Zap Energy reported that DOE certified completion of a three-hour, 1,080-shot milestone on its Century test platform.
Who acted: Zap Energy (company report of a DOE certification)
Stage: stated by the body
Zap reported DOE-certified completion on 2025-02-25 of a three-hour, 1,080-shot Century milestone
2025-04-07A NIF shot reached 8.6 MJ from 2.08 MJ delivered to the target, a target gain of 4.13.
A NIF shot reached 8.6 MJ from 2.08 MJ delivered to the target, a target gain of 4.13.
Who acted: Lawrence Livermore National Laboratory, NIF
Stage: other
NIF's April 7, 2025 shot reached 8.6 MJ from 2.08 MJ delivered to the target
2025-05-27Type One Energy released an initial design review of its plant.
Type One Energy released an initial design review of its plant. The registry says the review was chaired by the company with outside experts.
Who acted: Type One Energy
Stage: stated by the body
Type One's 2025 initial design review was company-chaired with outside experts
2025-06-30CFS and Google announced a 200 MW power-purchase agreement for the proposed ARC plant in Chesterfield County, Virginia.
CFS and Google announced a 200 MW power-purchase agreement for the proposed ARC plant in Chesterfield County, Virginia.
Who acted: Commonwealth Fusion Systems and Google
Stage: announced
Google 200 MW PPA announced 2025-06-30
2025-07-09The one-year date for the section 205(c) report on mass-manufactured fusion machines.
The one-year date for the section 205(c) report on mass-manufactured fusion machines. The library holds no record of the result as of 2026-11-08.
Who acted: NRC (deadline under ADVANCE Act section 205(c))
Stage: scheduled
separately required a section 205(c) report within one year (2025-07-09)
2025-07-22TVA and Type One announced the first limited fabrication and welding contracts with TVA's Power Service Shops for the Bull Run project.
TVA and Type One announced the first limited fabrication and welding contracts with TVA's Power Service Shops for the Bull Run project.
Who acted: Tennessee Valley Authority (TVA) and Type One Energy
Stage: signed or enacted
TVA Power Service Shops fabrication/welding contracts announced 2025-07-22
2025-08-08DOE's Fusion Energy Sciences Advisory Committee ended on August 8, 2025.
DOE's Fusion Energy Sciences Advisory Committee ended on August 8, 2025. The census lists no meetings or reports from January 2025 on.
Who acted: DOE, Fusion Energy Sciences Advisory Committee (FESAC, committee no. 444)
Stage: ended or withdrawn
Terminated; TERMINATED in FY2025; agency recommendation for next year: Terminate
2025-09Chesterfield County approved a conditional-use permit for the proposed ARC plant site.
Chesterfield County approved a conditional-use permit for the proposed ARC plant site.
Who acted: Chesterfield County, Virginia
Stage: approved or adopted
Chesterfield conditional-use permit approved in September 2025
2025-09-10DOE selected 20 one-year INFUSE projects totaling $6.1 million and seven second-round FIRE Collaboratives teams.
DOE selected 20 one-year INFUSE projects totaling $6.1 million and seven second-round FIRE Collaboratives teams. The files say selection material carries a no-commitment disclaimer.
Who acted: DOE
Stage: approved or adopted
20 one-year projects totaling $6.1 million selected 2025-09-10
2025-09-18The subcommittee's calendar lists a hearing, 'Igniting America's Energy Future: The Promise and Progress of Fusion Power'.
The subcommittee's calendar lists a hearing, 'Igniting America's Energy Future: The Promise and Progress of Fusion Power'. The notes do not record whether the hearing was held.
Who acted: U.S. House Committee on Energy and Commerce, Subcommittee on Energy
Stage: scheduled
Igniting America's Energy Future: The Promise and Progress of Fusion Power
2025-09-19TVA and Type One announced a letter of intent for possible deployment once the technology is commercially ready.
TVA and Type One announced a letter of intent for possible deployment once the technology is commercially ready. The files say it is subject to TVA Board, planning and regulatory review.
Who acted: TVA and Type One Energy
Stage: announced
TVA letter of intent announced 2025-09-19 for potential deployment once commercially ready
2025-09-22CFS and Eni announced a power-purchase agreement described as more than $1 billion.
CFS and Eni announced a power-purchase agreement described as more than $1 billion.
Who acted: Commonwealth Fusion Systems and Eni
Stage: announced
Eni PPA described as more than $1 billion announced 2025-09-22
2025-09-30CFS reported that DOE validated its full-scale toroidal-field magnet milestone and paid $8 million.
CFS reported that DOE validated its full-scale toroidal-field magnet milestone and paid $8 million.
Who acted: Commonwealth Fusion Systems (company report of DOE validation and payment)
Stage: stated by the body
CFS reported DOE validation of its full-scale toroidal-field magnet milestone and an $8 million payment on 2025-09-30
2025-10-16DOE released Part I of its Fusion Science and Technology Roadmap.
DOE released Part I of its Fusion Science and Technology Roadmap.
Who acted: DOE
Stage: published
Fusion S&T Roadmap Part I public unveiling
2025-11-24The President signed Executive Order 14363, 'Launching the Genesis Mission'.
The President signed Executive Order 14363, 'Launching the Genesis Mission'. Its list of challenge areas includes fission and fusion. The order's steps are in the genesis-mission-awards story.
Who acted: The President (Executive Order 14363)
Stage: signed or enacted
EO 14363 signed/dated; Genesis establishment clock
2026-01-13Thea Energy reported that DOE certified or approved the preconceptual design of its Helios plant.
Thea Energy reported that DOE certified or approved the preconceptual design of its Helios plant. The library holds no matching DOE record as of 2026-11-08.
Who acted: Thea Energy (company report of a DOE certification)
Stage: stated by the body
Thea reported DOE certification/approval of the Helios preconceptual design on 2026-01-13
2026-01-23 Turning pointPublic Law 119-74 became law.
Public Law 119-74 became law. The explanatory table gives Fusion Energy Sciences $805.657 million ($634.973 million research, $170.684 million U.S. ITER construction) and directs at least $70 million of a $100 million public-private partnership line to the Milestone Program.
Who acted: Congress and the President (P.L. 119-74, FY2026 Energy and Water)
Stage: signed or enacted
Public Law 119-74 became law January 23.
2026-01-29 Turning pointType One and TVA reported an initial byproduct-material license submission for the Bull Run project under Tennessee's Agreement State authority.
Type One and TVA reported an initial byproduct-material license submission for the Bull Run project under Tennessee's Agreement State authority. The announcement calls it groundwork for later submissions; the library holds no record of a receipt, docket or completeness finding as of 2026-11-08.
Who acted: Type One Energy and TVA (submission to the Tennessee Department of Environment and Conservation, TDEC)
Stage: other
Where the files differ: Megawatt figure: the January 2026 announcement and TVA's and NRC's pages say 350 MWe; Type One's current copy and TDEC's June 2026 release say 400 MWe, from the same 800 MW fusion design. No file settles it.
Type One reported an initial byproduct-material application submitted 2026-01-29
2026-02-22The registry names a 'February 22 FES strategy briefing'.
The registry names a 'February 22 FES strategy briefing'. The library holds no record of what it was as of 2026-11-08.
Who acted: Fusion Energy Sciences (as the registry names it)
Stage: discussed
No public artifact was located for the February 22 FES strategy briefing
2026-02-26 Turning pointNRC published its proposed rule, 'Regulatory Framework for Fusion Machines' (91 FR 9476-9498), with draft consolidated guidance, opening a 90-day comment period to May 27.
NRC published its proposed rule, 'Regulatory Framework for Fusion Machines' (91 FR 9476-9498), with draft consolidated guidance, opening a 90-day comment period to May 27.
Who acted: Nuclear Regulatory Commission (NRC)
Stage: proposed
Where the files differ: Filing time: the ledger gives 8:45 a.m. ET; the spine says '08:45 (timezone not specified in filing line)'. Not settled.
NRC fusion-machine proposed rule published
2026-03-11Tennessee's fusion-machine rules (Chapter 0400-20-14; Rule IDs 10543-10549) were filed and received by the Secretary of State.
Tennessee's fusion-machine rules (Chapter 0400-20-14; Rule IDs 10543-10549) were filed and received by the Secretary of State.
Who acted: Tennessee Secretary of State, Division of Publications (receiving a TDEC rule filing)
Stage: other
Tennessee fusion-rule filing received by Secretary of State
2026-03-17DOE issued the Genesis request for applications (DE-FOA-0003612), anticipating $293.76 million across all subjects, not fusion alone.
DOE issued the Genesis request for applications (DE-FOA-0003612), anticipating $293.76 million across all subjects, not fusion alone. It lists fusion work: materials datasets, digital twins, real-time control, tritium models, blanket databases and a whole-plant repository.
Who acted: DOE, Office of Science (Genesis Mission)
Stage: request for information or comment
The March 17, 2026 Genesis RFA anticipated $293.76 million across all subjects, not fusion alone.
2026-04-02Realta and CFS published a magnet partnership.
Realta and CFS published a magnet partnership.
Who acted: Realta Fusion and Commonwealth Fusion Systems
Stage: announced
Realta/CFS magnet partnership publication
2026-04-28CFS announced it had applied to PJM Interconnection's Cycle 1 process for the proposed ARC (Fall Line) plant.
CFS announced it had applied to PJM Interconnection's Cycle 1 process for the proposed ARC (Fall Line) plant.
Who acted: Commonwealth Fusion Systems
Stage: other
CFS announces ARC/Fall Line PJM interconnection application
2026-04-29PJM confirmed that fusion was among the more than 800 Cycle 1 applicants.
PJM confirmed that fusion was among the more than 800 Cycle 1 applicants. The library holds no record of a study or interconnection agreement as of 2026-11-08.
Who acted: PJM Interconnection
Stage: stated by the body
PJM confirmed fusion among Cycle 1 applicants 2026-04-29
2026-05-13Thea reported operating a full-size, full-current, full-field Eos shaping coil at Kearny, New Jersey.
Thea reported operating a full-size, full-current, full-field Eos shaping coil at Kearny, New Jersey.
Who acted: Thea Energy
Stage: other
full-size, full-current, full-field Eos shaping coil reported operated at Kearny, New Jersey on 2026-05-13
2026-05-19Zap reported DOE approval of a preconceptual pilot-plant design of about 50 MWe net per module.
Zap reported DOE approval of a preconceptual pilot-plant design of about 50 MWe net per module. The library holds no matching DOE record as of 2026-11-08.
Who acted: Zap Energy (company report of a DOE approval)
Stage: stated by the body
it reported DOE approval on 2026-05-19 of an approximately 50 MWe-net-per-module preconceptual design
2026-05-27The comment period on NRC's proposed fusion rule closed.
The comment period on NRC's proposed fusion rule closed.
Who acted: NRC
Stage: comment period closed
NRC proposal comment period closes
2026-05-27Focused Energy announced a $240 million Series A financing, with RWE as investor and site partner.
Focused Energy announced a $240 million Series A financing, with RWE as investor and site partner.
Who acted: Focused Energy
Stage: announced
$240 million Series A announced 2026-05-27
2026-06-01Zap's Milestone agreement records a positive obligation revision of $8.3 million.
Zap's Milestone agreement records a positive obligation revision of $8.3 million.
Who acted: DOE (award record on USAspending)
Stage: other
Zap (+$8.3 million on June 1)
2026-06-01TDEC announced that its fusion regulations take effect June 9.
TDEC announced that its fusion regulations take effect June 9.
Who acted: Tennessee Department of Environment and Conservation (TDEC)
Stage: announced
Tennessee announces its June 9 fusion regulations
2026-06-03Xcimer announced that its Phoenix laser prototype in Denver began operating above 1 kJ.
Xcimer announced that its Phoenix laser prototype in Denver began operating above 1 kJ.
Who acted: Xcimer Energy
Stage: in operation
Xcimer announces start of Phoenix laser-prototype operations
2026-06-04DOE and the Japanese ministries announced a planned five-year, combined $1 billion Genesis partnership, subject to future appropriations; fusion is one of several fields.
DOE and the Japanese ministries announced a planned five-year, combined $1 billion Genesis partnership, subject to future appropriations; fusion is one of several fields.
Who acted: DOE with Japan's MEXT and METI
Stage: announced
DOE and Japanese ministries announced a planned five-year, combined $1 billion Genesis partnership, subject to future appropriations.
2026-06-08Thea announced a Helios digital-twin and AI surrogate-model collaboration.
Thea announced a Helios digital-twin and AI surrogate-model collaboration.
Who acted: Thea Energy with NVIDIA, Synopsys, Argonne National Laboratory and Princeton Plasma Physics Laboratory
Stage: announced
Thea announces Helios digital-twin and AI-surrogate collaboration
2026-06-09 Turning pointDOE released the finalized 122-page Fusion Science and Technology Roadmap (Part II).
DOE released the finalized 122-page Fusion Science and Technology Roadmap (Part II). The files say it commits no specific funding and depends on future appropriations and public-private partnerships; it sets a target of pilot plants delivering electricity in 2031-2035.
Who acted: DOE (Office of Fusion; Fusion Energy Sciences)
Stage: published
Where the files differ: Webpage metadata records creation on June 4 and later PDF production on June 11 and 15; the ledger keeps June 9 as the release date.
Finalized Fusion S&T Roadmap / Part II publicly released
2026-06-09 Turning pointTennessee's fusion-machine rules, Chapter 0400-20-14, took effect.
Tennessee's fusion-machine rules, Chapter 0400-20-14, took effect.
Who acted: State of Tennessee (TDEC; Chapter 0400-20-14)
Stage: took effect
Tennessee Chapter 0400-20-14 becomes effective
2026-06-09Thea's Milestone agreement records a positive obligation revision of $6.2 million.
Thea's Milestone agreement records a positive obligation revision of $6.2 million.
Who acted: DOE (award record on USAspending)
Stage: other
Thea (+$6.2 million on June 9)
2026-06-10Xcimer reported DOE approval of the preconceptual design and technology roadmap for its Athena plant.
Xcimer reported DOE approval of the preconceptual design and technology roadmap for its Athena plant. The library holds no matching DOE record as of 2026-11-08.
Who acted: Xcimer Energy (company report of a DOE approval)
Stage: stated by the body
Xcimer reported DOE approval of Athena's preconceptual design and technology roadmap on 2026-06-10
2026-06-19A WHAM direct-energy converter drew multiple amps at about 100 volts during plasma operation.
A WHAM direct-energy converter drew multiple amps at about 100 volts during plasma operation. Realta's own account says most of the energy was supplied heating power and it was not net electricity.
Who acted: Realta Fusion (WHAM, University of Wisconsin-Madison)
Stage: other
on 2026-06-19 a WHAM direct-energy converter drew multiple amps at about 100 volts during plasma operation
2026-06-20NIF recorded its eleventh ignition: 7.9 MJ yield and target gain of about 3.8.
NIF recorded its eleventh ignition: 7.9 MJ yield and target gain of about 3.8.
Who acted: Lawrence Livermore National Laboratory, NIF
Stage: other
On June 20, NIF recorded its eleventh ignition: 7.9 MJ yield and approximately
2026-07-09ARPA-E selected Thea Energy for up to $20 million to scale U.S. production of modular high-temperature-superconductor magnets.
ARPA-E selected Thea Energy for up to $20 million to scale U.S. production of modular high-temperature-superconductor magnets.
Who acted: DOE, Advanced Research Projects Agency-Energy (ARPA-E)
Stage: approved or adopted
ARPA-E selected Thea on 2026-07-09 for up to $20 million
2026-07-13The CFS Milestone agreement records a positive obligation revision of $13.585 million; its displayed award period ended December 4, 2025.
The CFS Milestone agreement records a positive obligation revision of $13.585 million; its displayed award period ended December 4, 2025.
Who acted: DOE (award record on USAspending)
Stage: other
CFS (+$13.585 million on July 13)
2026-07-15Realta announced its Hammir machine site at the former Oscar Mayer plant in Madison, with state and city support described as up to $55 million.
Realta announced its Hammir machine site at the former Oscar Mayer plant in Madison, with state and city support described as up to $55 million. The notes record no start of construction as of 2026-11-08.
Who acted: Realta Fusion, with the Wisconsin Economic Development Corporation and the City of Madison
Stage: announced
Wisconsin and Madison support described as up to $55 million
2026-07-22DOE selected 278 Genesis projects for award negotiations; the list includes fusion design, control twins, materials, magnet manufacturing, a D-T process loop, Realta neutral-beam work and Princeton Plasma Physics Laboratory gyrotrons.
DOE selected 278 Genesis projects for award negotiations; the list includes fusion design, control twins, materials, magnet manufacturing, a D-T process loop, Realta neutral-beam work and Princeton Plasma Physics Laboratory gyrotrons.
Who acted: DOE (Genesis Mission)
Stage: approved or adopted
Genesis project selections include named fusion/DCP work
2026-07-22The registry names a 'July 22 directed helium-3/tritium report' and records it as a directed report.
The registry names a 'July 22 directed helium-3/tritium report' and records it as a directed report. It does not say who directed it or who must report. The library holds no record of the result as of 2026-11-08.
Who acted: not named in the files
Stage: scheduled
the July 22 directed helium-3/tritium report
2026-07-29Biblis, Germany was selected as Focused Energy's German laser-fusion hub.
Biblis, Germany was selected as Focused Energy's German laser-fusion hub.
Who acted: Focused Energy
Stage: announced
Biblis selected as German laser-fusion hub
2026-08-05ORNL announced a signed license to Type One for four ORNL cryogenic pellet-fueling inventions for the fusion fuel cycle.
ORNL announced a signed license to Type One for four ORNL cryogenic pellet-fueling inventions for the fusion fuel cycle.
Who acted: Oak Ridge National Laboratory (ORNL) and Type One Energy
Stage: signed or enacted
ORNL, Type One Energy advance fusion fuel cycle with innovative new technologies
2026-08-11ORNL announced that it and Kyoto Fusioneering will develop the UNITY-3 fusion technology test facility in East Tennessee, and reported a DOE funding commitment; no amount is given.
ORNL announced that it and Kyoto Fusioneering will develop the UNITY-3 fusion technology test facility in East Tennessee, and reported a DOE funding commitment; no amount is given.
Who acted: Oak Ridge National Laboratory (ORNL) and Kyoto Fusioneering
Stage: announced
ORNL reported a DOE funding commitment and partner plans to help build and operate UNITY-3
2026-08-15DOE posted a three-post, five-card X thread, 'FUSION: ENERGY WITHOUT LIMITS', pointing to the June 9 roadmap.
DOE posted a three-post, five-card X thread, 'FUSION: ENERGY WITHOUT LIMITS', pointing to the June 9 roadmap.
Who acted: DOE (official X account)
Stage: announced
DOE `Energy Without Limits` root post; online publication
2026-10-08DOE announced twelve Phase II ($159 million total) and six Phase I Genesis selections; one Phase II selection is a Commonwealth Fusion Systems digital twin for SPARC.
DOE announced twelve Phase II ($159 million total) and six Phase I Genesis selections; one Phase II selection is a Commonwealth Fusion Systems digital twin for SPARC. DOE's list says selection for award negotiations is not a commitment to award or fund.
Who acted: DOE (Genesis Mission)
Stage: approved or adopted
The twelve Phase II selections include a Commonwealth Fusion Systems digital twin for SPARC
2026-10-22Commerce announced letters of intent for four prospective CHIPS research awards totaling up to $389 million, including up to $85 million for Commonwealth Fusion Systems for RF plasma-heating, power, diagnostic and radiation-hardened electronics.
Commerce announced letters of intent for four prospective CHIPS research awards totaling up to $389 million, including up to $85 million for Commonwealth Fusion Systems for RF plasma-heating, power, diagnostic and radiation-hardened electronics. Each final award would be conditioned on a minority, non-voting equity stake.
Who acted: U.S. Department of Commerce (CHIPS R&D)
Stage: announced
Commonwealth Fusion Systems — up to $85 million for RF plasma-heating, power, diagnostic and radiation-hardened electronics;
2026-11-02DOE announced $8.5 million in FY2026 INFUSE funding for 28 selected projects.
DOE announced $8.5 million in FY2026 INFUSE funding for 28 selected projects. Its release specifies award negotiations before a commitment to award or fund.
Who acted: DOE Office of Science
Stage: selection announced
On November 2, 2026, DOE's Office of Science announced $8.5 million in FY2026 INFUSE funding for 28 selected projects involving laboratories, universities and commercial partners.
2026-11-02CFS described SPARC assembly and support-system commissioning, with operation expected the following year and a planned campaign toward Q greater than one.
CFS described SPARC assembly and support-system commissioning, with operation expected the following year and a planned campaign toward Q greater than one.
Who acted: Commonwealth Fusion Systems
Stage: company report
CFS's November 2 account describes SPARC assembly and commissioning of support systems, with operation expected the following year.
2026-11-13DOE updated its fusion challenge page describing an AI-Fusion Digital Convergence Platform joining modelling and experimental infrastructure.
DOE updated its fusion challenge page describing an AI-Fusion Digital Convergence Platform joining modelling and experimental infrastructure.
Who acted: DOE
Stage: programme description updated
DOE's fusion challenge page, updated November 13, describes an AI-Fusion Digital Convergence Platform connecting physics-constrained twins, HPC, foundation/surrogate models, plasma/materials science and experimental infrastructure.
undated (FY2027 budget request; the files give no release date)DOE's FY2027 request asks $755.251 million for Fusion Energy Sciences ($50.406 million below FY2026), $135 million for public-private partnerships, and a first standalone $10 million Office of Fusion account.
DOE's FY2027 request asks $755.251 million for Fusion Energy Sciences ($50.406 million below FY2026), $135 million for public-private partnerships, and a first standalone $10 million Office of Fusion account.
Who acted: DOE (FY2027 budget request)
Stage: proposed
FY2027 request is $50.406M below FY2026 enacted
undated (Tennessee database; no date given)The Tennessee Nuclear Fund database lists a $4.5 million contracted award to Type One, with a 330-job and $223.5 million investment commitment.
The Tennessee Nuclear Fund database lists a $4.5 million contracted award to Type One, with a 330-job and $223.5 million investment commitment.
Who acted: State of Tennessee (Tennessee Nuclear Fund)
Stage: signed or enacted
Tennessee Nuclear Fund database: $4.5 million contracted award, 330-job commitment and $223.5 million investment commitment
Where it stands
The November 19 bounded return records later programme selections and developer assembly/planning statements. The saved Milestone obligations/outlays, NRC proposal and state/project licensing clocks retain their original evidence dates. The reviewed new sources establish no sustained net fusion-electricity delivery to a customer.
What comes next
- When
- 2026-11-24
- What
- First annual Genesis Mission report from the Secretary of Energy to the President under EO 14363 (covers the fusion challenge among others). The order does not require public release.
- Stage
- scheduled (deadline in the order)
- Files
- Federal Science Operating System/FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md
- Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
- When
- 2027-06-04
- What
- Displayed award end dates for the Zap and Thea Milestone agreements.
- Stage
- scheduled (award period shown on USAspending)
- Files
- Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
- When
- 2027 (end)
- What
- ORNL targets completion of the Bull Run high-heat-flux facility with Type One and the University of Tennessee.
- Stage
- scheduled (target)
- Files
- Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
- When
- 2027-12-31
- What
- NEIMA section 103(a)(4) deadline for NRC's technology-inclusive framework rule.
- Stage
- scheduled (statutory deadline)
- Files
- Federal Science Operating System/FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md
- Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md
- Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_IMPLEMENTATION_WATCHBOARD.md
- When
- 2028 (January)
- What
- MPEX CD-4 target retained in the FY2027 request.
- Stage
- scheduled (target)
- Files
- Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
- When
- 2028 to 2029
- What
- Infinity Two construction 'as early as 2028'; Infinity One commissioning/startup 2029; Xcimer Anvil 2028 (company targets).
- Stage
- scheduled (company targets)
- Files
- Federal Science Operating System/FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md
- When
- 2031-2035
- What
- DOE roadmap target window for pilot plants delivering electricity.
- Stage
- scheduled (target)
- Files
- Federal Science Operating System/FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md
What the notes do not record
- A DOE action record for the Thea (January 13), Zap (May 19) or Xcimer (June 10) design approvals; each is known from the company's release.
- A one-to-one link between any Milestone obligation or outlay and a named verified milestone (the agreement amendment, verification memorandum, invoice and payment record).
- The July 2026 amendment that explains the CFS obligation revision after its displayed December 4, 2025 award end.
- The Type One/TVA January 29, 2026 submission itself, its TDEC receipt, docket, scope (Infinity One, Infinity Two or both) or completeness finding.
- An NRC final fusion rule, its publication or effective date.
- The Massachusetts license document for SPARC; the files rely on CFS's report.
- An executed award, obligation or platform access for any Genesis fusion selection (July 22 or October 8, 2026).
- A Fusion BRIDGE solicitation or award, and the FY2026 split of the $100 million public-private partnership line.
- The date the Office of Fusion was set up, the date of JP Allain's departure, or a named successor.
- Who directed the 'July 22 helium-3/tritium report', and the year and host of the 'February 22 FES strategy briefing'.
- The amount of DOE's reported funding commitment for ORNL's UNITY-3 facility.
- Any PJM study or interconnection agreement for ARC; any grid request for Infinity Two.
- A record of the ADVANCE Act section 205(c) report due July 9, 2025.
What it touches
- Nuclear Regulatory Commission (NRC)'s fusion-energy rule (byproduct-materials framework): from proposed rule to final rule
NRC's fusion-machine rule is its own thread (system civilian-nuclear-licensing-and-fuel). The 2027 deadline comes from NEIMA (2019); ADVANCE (2024) supplied the definitions. This story carries the rule's dated steps as one strand.
- DOE's Genesis Mission: research selections, funding opportunities, pledges and platform pieces
The Genesis request for applications, the July 22 and October 8 selections for award negotiations, and the U.S.-Japan partnership are steps of that story; here their fusion content is listed.
- Department of Energy (DOE) Milestone-Based Fusion Development Program money: obligations, outlays and verified milestones per company
Folded in as the 'Money: Milestone Program' strand (it is listed in has_parts).
- Type One Energy and Tennessee Valley Authority (TVA)'s Bull Run fusion project (Infinity One and Two)
Folded in as the 'Type One and TVA at Bull Run' strand.
- The Nuclear Regulatory Commission's revision of reactor licensing rules under Executive Order 14300
NRC's reactor-licensing proposals of 2026 run beside the fusion proposal; the spine reviews them together. The library holds no record tying the fusion rule to EO 14300 as of 2026-11-08.
- Quantum CHIPS Act chip-manufacturing programme (CHIPS) letters of intent converting (or not) into definitive Commerce awards
The October 22, 2026 Commerce letters of intent (CFS up to $85 million) are CHIPS research letters of intent, the instrument whose conversion to definitive awards that thread follows.
- U.S. participation in ITER: in-kind deliveries, Council and budget
$170.684 million of the FY2026 Fusion Energy Sciences appropriation is U.S. ITER construction.