Skip to content

Genesis Mission

Full saved reading

View cited sources (35)

These are the sources cited by this reading. Each source keeps its own date and scope.

Optional file downloads
For AI readers: complete text and record details

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Genesis Mission

November 18 source-depth return: Argonne's equipment, model access and scientific-agent workflows adds detail from its November 4 service announcement. The proposed supercomputing center, project funding and integrated platform keep their separate records and dates.

<!-- managed-discovery-batch-2026-11-03:genesis -->

Dated extension — Genesis Agent Skills release

Source date: October 15, 2026; integrated November 3. DOE announced a freely available Genesis Agent Skills package from ModCon's BASE team: reusable instructions, workflows and resources for scientific coding assistants, including safety, agent evaluation/monitoring, data governance and multi-agent work. This adds a named resource to the previously described workflow layer. It is an agency-reported release, not proof of accepted scientific workflows or measured results. The repository was inaccessible during the October 31 discovery review; its contents, license, version and practical portability were not independently verified. This integration rechecked the release, not the repository.

Source: DOE release, complete substantive body, especially package description and BASE attribution. The October 13 baseline and individual system/company clocks below remain unchanged. No DOE–NIST implementation join is established.

<!-- /managed-discovery-batch-2026-11-03:genesis -->

<!-- plain-english-entry:start -->

In plain English

Question: What is Genesis building, how do laboratories and researched companies contribute, and what has actually been demonstrated?

Answer: Genesis connects national labs, scientific data, computing and AI tools through a DOE-led platform. Oak Ridge documented active Lux project accounts, and Argonne added computing capacity for its operating Inference Service. DOE has documented catalog access and lab demonstrations. The public record still lacks evidence for an end-to-end deployment across participating agencies.

Evidence checked through: 2026-11-15 for the order's computing, data and robotics provisions. The summit and each system or company profile retain their own dates.

The detailed record below keeps the legal wording, source limits and open questions.

<!-- plain-english-entry:end -->

Maintained research guide · original system and company pass September 9, 2026; summit check October 9 and targeted return October 13, 2026.

A national effort to connect scientific data, AI models, advanced computing and laboratories so researchers can tackle challenges in health, energy, industry, discovery and security.

Established in November 2025, Genesis is coordinated by the White House across federal agencies. DOE builds the shared scientific platform; Under Secretary for Science Darío Gil directs the mission at DOE. Its aim is to double the productivity and impact of American science and engineering within a decade.

Executive Order 14363 — Launching the Genesis Mission · White House: More than $5 billion in federal commitments

What changed at the October 8 science summit

The summit moved several named projects and resources forward. It did not turn the whole Genesis platform into a demonstrated, shared operating system.

ObjectWhat the official record saysEvidence boundary
Genesis research projectsDOE announced twelve Phase II projects totaling $159 million and six Phase I selections. Its release says the first-year portfolio is now 297 projects.The posted October 8 list names all eighteen and states that selection for award negotiations is not a commitment to issue an award or provide funding. The July graphic retains its 278-row selection snapshot. The public release's 297 total has not been reconciled row by row with that earlier list; do not add 18 to 278 and silently relabel the graphic.
Scientific compute and AI toolsThe White House announced $2.4 billion in tools and compute credits from eleven industry partners for the Genesis consortium.Partner commitments and credits are not federal outlays, delivered compute, access grants or measured use. The White House's larger “over $6 billion” summit figure mixes federal, industry, academic and philanthropic sources; do not add it to the earlier federal commitment figure.
Data federationDOE identified 190 priority dataset repositories across fourteen agencies.Identification is a starting inventory. It does not establish interoperable access, permissions, data quality, model use or an operating cross-agency federation.
Instruments and autonomous labsDOE and NSF announced more than $100 million for scientific instrumentation and autonomous laboratories; DOE separately identified four lab-led robotics testbed selections for $30 million over three years.The posted testbed list is selected for award negotiations. Construction, integration, user access and measured science remain later gates.
Quantum and workforceDOE named eight Quantum Genesis priority applications; the summit announced a Genesis graduate fellowship and a high-school fellowship.Priority problems and fellowship launches do not establish fault-tolerant quantum operation or completed cohorts.

The twelve Phase II selections include a Commonwealth Fusion Systems digital twin for SPARC, an RNA-structure project led by UC San Diego, MIT lattice-QCD work and an Argonne scientific-software project. These are named research aims, not completed fusion, biological, particle-physics or computing results.

Primary records: DOE Genesis project release, October 8 · DOE's eighteen-name selection list and its award-negotiation caveat · DOE summit fact sheet, October 9 · White House summit fact sheet, October 8 · DOE robotics selection list.

What the October 13 return added

No later dated Genesis release was located on the reached official surfaces after October 9. The return did find details in the summit material that this answer had not yet captured:

- Graduate fellowship: DOE opened DE-FOA-0003673, with $100 million expected across current and future years, about four to eight institutional awards and an initial target of roughly 100 fellows. The November 9 letter-of-intent and January 12, 2027 application clocks are real; no institution or fellow has been selected.

- Quantum user facility: DOE now describes a planned National Quantum Supercomputing User Facility. No site, appropriation, procurement, award, construction or operating-access receipt was located.

- More working pieces: DOE reports Osprey installed at eight accelerator facilities; Jefferson Lab's HAIDIS inverse solver; two Brookhaven biomolecules that capture terbium; bounded SLAC accelerator-AI speedups; and ORBIT water forecasts. These are component claims, not proof of one completed Genesis platform.

- More visible collaborators: the standalone Genesis site displays OpenAI for Government and Google. It does not disclose an exact legal entity, agreement, assigned work, value or accepted result for either.

Read the dated October 13 return for amounts, clocks, source links and evidence limits.

Computing, data access and automated experiments through November 15, 2026

EO 14363 provisionPublic evidenceOpen record
§3(c), federal and industry computing, storage and networking resources, due February 22DOE's October 21 account of the Argonne hackathon reports that teams representing 185 projects had access to more than 55,000 DOE compute hours and $1 million in computational resources from AWS, Google, Microsoft and OpenAI. On November 4, Argonne reported adding Tara and Minerva to its operating Inference Service, available to Genesis teams and other authorized researchers. DOE hackathon · Argonne's Inference ServiceThe full February resource inventory and related partnership or infrastructure assessment were not located in the public sources reviewed. Event access records do not measure consumption of the available resources.
§3(d)(ii), plan for incorporating datasets with risk-based cybersecurity, due March 24DOE's April 3 ModCon presentation reported eight catalogs accessible through the Genesis Central Catalog and initial metadata, data cards and data sheets available for use. DOE's October fact sheet identified 190 priority repositories in 14 federal agencies as the basis for further federation. April 3 presentation, slides 33–36 · October fact sheetThe full plan covering federal, academic and approved private sources was not located. The April count measures catalog access and the October count measures repositories identified.
§3(e), robotic laboratory and production capabilities and standards review, due July 22Argonne reported a SYNAPS-I demonstration at the 26-ID hard X-ray nanoprobe. A natural-language instruction directed the agent to find an interface in a microelectronics sample by scanning, analyzing and navigating images. Argonne demonstrationNo department-wide review or completion statement was located. The demonstration concerns one experimental workflow.

On November 12, Under Secretary Darío Gil described Oak Ridge's Lux as deployed. He reported 297 teams across 369 institutions, more than 70 consortium partners, and $2.5 billion in committed tools and computing resources. These figures are DOE's reported cohort and commitment totals. Formal acquisition acceptance for Lux and aggregate usage or disbursement figures remain unverified. Gil's November 12 letter

Executive Order 14363, §3

Read the mission in its own words

The hub opens with the definition in Section 2(a) of Executive Order 14363, followed by all seven official section headings and labeled original excerpts. The six platform components, original priority domains and reporting subjects are retained. DOE’s five July 2026 challenge-family headings follow the charter, before the links into deeper research.

Explore the hub

Open the interactive hub. Six areas connect the mission, science challenges, platform, organizations, funding and source research. The Library version supports saved-document reading and return.

Coverage in the existing interactive hub: 33 official challenges; all 278 July selection-list rows; 12 detailed project or participation profiles; 30 researched organizations. The October update above has not been inserted into that July row set. This is a bounded company selection, not a complete member or executed-award census.

What Genesis is doing

The charter directs an integrated American Science and Security Platform. American Science Cloud and ModCon connect data, AI and shared services with laboratory computing and facilities. Each project has its own access conditions, scientific purpose and implementation state.

Executive Order 14363 — Launching the Genesis Mission · DOE ModCon architecture and resources

OPAL plant science workflow

Demonstrated workflow. A reported production workflow couples ORNL plant imaging, Genesis services and Frontier.

A 40-day campaign of 360 pennycress plants; ordinary data queries 3–10 seconds, provenance overhead under 1%.

Next evidence: Complete shared provenance/lakehouse integration and test further laboratories.

Author-reported preprint. Cold inference with queue contention takes 30 minutes–2 hours; not all science is instantaneous.

OPAL production workflow paper

GridFM 2.0

Research development. Brookhaven-led three-year project for faster grid planning.

Named research/utility collaboration; open-source program context.

Next evidence: Two planned utility deployments; evaluate performance against stated targets.

BNL reports $14.2m and OE $11.5m; no reconciliation assumed. Billion-scenarios and acceleration figures are goals.

Brookhaven GridFM Phase II project · DOE GridFM 2.0 announcement

Genesis-Science-1

In development. Arcee and DOE are developing an open scientific model.

Contribution portal and described workbench approach.

Next evidence: Post-training contributions due September14; verify model release and evaluations.

No downloadable released weights established in reviewed official pages.

Genesis Open Models contribution portal · Genesis-Science-1 planned operating design

Prometheus nuclear AI

November 19 return: Arco and Prometheus adds the November 18 computing/user-facility launch, later agency/operator award descriptions and a March 2027 production-platform target. Executed award terms, payments and validated deployment gains remain separate. The earlier selection record below retains its original clock.

Phase II selection. INL-led work on reactor engineering and licensing workflows.

Named lab/industry team and NVIDIA collaboration.

Next evidence: Execute research, demonstrate validated improvements and retain human oversight.

Distinct from the private company named Project Prometheus and historical NASA project; no name-based merge.

INL Prometheus Phase II selection · INL NVIDIA Prometheus collaboration

NNSA Secret/Restricted Data cloud

Authorized environment. An authorized AWS environment intended to host inaugural Genesis workloads.

NNSA reports established enterprise-authorized environment and shared tools.

Next evidence: Obtain dated evidence of Genesis-specific workload deployment.

Corrects the older saved claim that this release established operating Genesis workloads.

NNSA authorizes Secret/Restricted Data cloud with AWS

Solstice and Equinox

In development. NVIDIA and Oracle systems planned for Argonne.

Named technology partnership; existing ALCF capabilities.

Next evidence: Delivery and acceptance of each system; verify final configuration.

Solstice 100,000 and Equinox 10,000 GPUs are announced configurations, not installed counts.

DOE NVIDIA and Oracle partnership · ALCF Genesis systems status

Lux

Oak Ridge Leadership Computing Facility documented user access by November 11, 2026. Its Lux training announcement describes active project accounts and hands-on system exercises. Its user guide gives login and Slurm batch-job instructions, including example output dated October 12. DOE’s formal acquisition acceptance record and a dated first Genesis production workload were not located. November 11 OLCF training · OLCF Lux user guide · DOE Lux and Discovery partnership

Discovery

Planned system. Next Oak Ridge leadership system built by HPE with AMD.

Competitive procurement and supplier selection announced.

Next evidence: Delivery expected in 2028.

DOE Lux and Discovery partnership

Mission and Vision

System design. HPE/NVIDIA next-generation LANL systems.

Named codesign partners; server testing planned.

Next evidence: Full deployment expected 2027 and 2028.

July16 release does not establish later test-server acceptance.

NNSA and LANL codesign Mission and Vision

American Science Cloud and ModCon

Services partly operating. Shared model, data and agent services over DOE facilities.

Cards, model gateway, catalog and workflow primitives; OPAL demonstrates a composition.

Next evidence: Broader federated-training orchestration and shared data/provenance integration.

Authenticated access and provenance do not establish cryptographic signing, blockchain or PQC.

DOE ModCon architecture and resources · Federated learning on AmSC using APPFL · OPAL production workflow paper

Genesis Mission Consortium

Membership. Formal participation and proposed contributions.

Official roster accessible.

Next evidence: Verify project-specific agreements and delivery.

Genesis Mission Consortium — Our Members

AlphaFilm: Closed-Loop AI for Thin-Film Materials

Selected for award negotiations. Exabyte selection led by Sergey Barabash.

Named selection in July22 list.

Next evidence: Executed assistance agreement and project milestones.

DOE Genesis project selections, July 22

Companies and organizations we have researched

The October 13 company return expands the hub to 63 researched organizations: all 46 private-sector entries on the current public consortium roster, five additional pledge-only companies and the existing named project collaborators. It also keeps the eleven October commitments in their own layer, with the announced value, form and evidence limit. Read the company return for the full roster and pledge table.

The table below preserves the earlier companies with deeper named project or dossier roles. Entity names retained from those dossiers do not independently establish a new legal signatory. Roster capability descriptions remain attributed membership statements. Membership is not a pledge; a pledge is not an award; an award is not delivery; and delivery is not accepted use.

OrganizationContribution and evidence state
NVIDIAAccelerator/system partner — Named partner; Vera Rubin technology partner — Named partner; AI and simulation-code collaboration — Named partner; Named research collaborator — Named collaborator
OracleCloud/system integration partner — Named partner
HPESystem builder — Named partner; System builder — Named partner; System builder — Named partner
AMDCPU/GPU/network platform — Named partner; Processor/accelerator platform — Named partner
Amazon Web ServicesAuthorized cloud environment provider — Authorized environment; Named research collaborator — Named collaborator
Arcee AIScientific model development — Development
IBM ResearchNamed research collaborator — Named collaborator
GE Vernova ResearchNamed research collaborator — Named collaborator
Accenture Federal ServicesNamed research collaborator — Named collaborator
MicrosoftNamed research collaborator — Named collaborator
Alvarez and MarsalNamed research collaborator — Named collaborator
Alabama PowerNamed research collaborator — Named collaborator
National GridNamed research collaborator — Named collaborator
Con EdisonNamed research collaborator — Named collaborator
Great River EnergyNamed research collaborator — Named collaborator
GridFM CorporationNamed research collaborator — Named collaborator
X-energyNuclear industry collaborator — Named collaborator
TerraPowerNuclear industry collaborator — Named collaborator
OkloNuclear industry collaborator — Named collaborator
PalantirRole not specified on roster — Consortium member
CoreWeaveAI computing infrastructure — Consortium member
DatabricksGoverned data and agent workflows — Consortium member
Scale AIData curation, evaluation and agents — Consortium member
Periodic LabsMaterials AI and autonomous laboratories — Consortium member
DataeraiInstrument data capture and traceability — Consortium member
MedraAutonomous biological laboratory access — Consortium member
IntelCompute, silicon and robotics expertise — Consortium member
Cerebras SystemsAI training and inference — Consortium member
DrivenDataScientific datasets and evaluation — Consortium member
ExabyteLead: closed-loop thin-film materials — Selected for award negotiations

Money without double counting

Federal commitments, agency components, private in-kind contributions, selected assistance and individual project amounts have different scopes. The hub keeps them separate. GridFM’s $11.5 million DOE figure and $14.2 million Brookhaven figure remain unreconciled. Prometheus’s stated $60 million Phase II selection must not be replaced with the older generic call range.

White House: More than $5 billion in federal commitments · DOE partner commitments · INL Prometheus Phase II selection · DOE GridFM 2.0 announcement · Brookhaven GridFM Phase II project

Next research

- Reconcile GridFM’s conflicting published funding amounts.

- Verify Genesis-specific workloads in the authorized NNSA cloud.

- Check released scientific models and reproducible evaluations.

- Follow system delivery and acceptance, including Lux and Argonne’s new systems.

- Identify executed awards and results beyond original project selection.

The September consultation has now become an open fellowship funding opportunity, not fellowship awards. Model releases, system commissioning, fellowship selections and execution of selected project awards require their own later evidence.

DOE Genesis graduate fellowship funding opportunity · DOE launches Genesis Open Models Initiative

Existing research and custody

- October 13 company return — Current 46-member private-sector roster, eleven October commitments and company-specific evidence limits.

- October 13 targeted return — Fellowship funding, quantum user-facility plan, additional working lab components and post-summit no-new-release check.

- September 9 research update — The targeted refresh that opened this hub investigation.

- Genesis identity and provenance — Earlier platform anatomy, with later corrections clearly dated.

- Company dossiers — Our deeper research on AWS, Oracle, GE Vernova, Palantir and other companies.

- Programs, companies and facilities — Named program relationships and the remaining steps to operation.

- Federal science factual spine — The legal and policy context around Genesis.

- Fusion commercialization — Fusion research, capital and grid-delivery stages.

The data index records exact primary URLs, source dates, checked dates and limits. Original research remains in its maintained package. This guide does not reset the evidence cutoff of those other packages.