Merge — what the chart walk added
In plain English
Question: What materially changed across official U.S. federal sources from September 4 through September 11, 2026 after the targeted weekly was corrected with a broader publisher walk?
Answer: The week brought changes in citizenship rules, tariffs, industrial authority, sanctions, spending transparency, bank exams, courts, energy finance and federal delivery. A broader agency-by-agency review found material items the first pass missed.
Evidence checked through: 2026-09-11T16:01:37-04:00
The detailed record below keeps the legal wording, source limits and open questions.
Same frozen window. This file corrects the 1A–2E close. That pass was a targeted weekly. This pass opened the rest of the separately sweepable Federal Group publishers.
Empty hunts are coverage. The objects below were not in the 1A–2E ranked list.
Material objects 1A–2E never opened
| Object | Actor | Clock | Claim limit |
|---|---|---|---|
| NRC 26-077 reactor-regulation NPRM (EO 14300) | NRC | 2026-09-11 | NPRM. Not a license, exemption, or order. |
| FERC CIP-014-4 vote + three NGA certificates (Kosciusko, Gator Express, Carnation) | FERC | 2026-09-10 | Certificate ≠ in-service. Order PDFs unread. |
| ISCAP/NARA 9/11 Commission PDB summary + 11 MFRs | NARA / ISCAP | 2026-09-11 | Declassification ≠ new intel finding. |
| SBA 8(a) defense-critical NAICS to front of queue | SBA | 2026-09-10 overlay on Aug 11 rule | Processing overlay. Not a new 8(a) statute. |
| EXIM $280M MMIA credit agreement, CesiumAstro | EXIM | signed 2026-09-09 | Signing ≠ draw. Sep 10 Board Completed with no published satellite/THY/Ferromex decision. |
| DFC $10M MiCrédito Honduras | DFC | approved 2026-09-08 | Approval ≠ disbursement. |
| MCC Kiribati Amendment 1 payload (09-03 hold fill) | MCC | signed earlier; line-read now | $29.1M ceiling unchanged; Kiritimati study $1,469,000; completion EIF+4y9m. |
| CISA/NSA/FBI AA26-251A China industrial-scale AI distillation | CISA | 2026-09-08 | Advisory. Not attribution adjudication or a patch mandate. |
| First ATRC case unsealed after removal | DOJ/ATRC | 2026-09-11 | Unsealing ≠ conviction. |
| CMS Preclusion List: 11 DMEPOS, ~$3.4B suspected billing | CMS | 2026-09-08 | List/suspected ≠ adjudicated fraud or recovered cash. |
| CBP Trusted Traveler app live; two apps discontinued | CBP | 2026-09-09 | App launch ≠ enrollment census. |
| FEMA DR-4944 Colorado Public Assistance | FEMA | 2026-09-04 | Declaration ≠ outlay. |
| CDC NCIRD reorg (Influenza + Coronavirus divisions merged) | CDC | effective 2026-09-04 | Org change ≠ surveillance outcome. |
| NNSA CD-1 for LANL LAMP (LANSCE front-end) | NNSA / LANL | 2026-09-09 | Design-phase. Not construction or first beam. |
| CHIPS R&D: GlobalFoundries up to $375M; PsiQuantum up to $100M | Commerce / NIST | posted 2026-09-08 | Award ceiling ≠ draw or IOC. |
| SAMHSA $383.4M awards (dissolving heading, live operator) | SAMHSA | 2026-09-08 | Award ≠ obligation. Person still exists. |
| NLRB ALJ bench restored to 30 judges | NLRB | in-window | Headcount. Not a doctrine change. |
| FEC *NRSC* plaintiffs moved for final judgment wrapping June 30 SCOTUS holding | FEC docket | 2026-09-04 | Motion ≠ entered judgment. |
Looked, empty, or still proposed (now we know)
- Vehicles: SBR, Digital Asset Stockpile, Sovereign Wealth Fund, PWG Digital Asset Markets, SCRC, AHA, External Revenue Service, Investment Accelerator — no in-window public operating instrument. Fraud.gov still a WH overlay; no Task Force deliverable.
- DOGE still serving after the Jul 4 sunset (API live; sampled grants still dated 2025-10-02). Not a new charter.
- USAID remnant still the Feb 23 2025 leave/RIF page. CFPB, AmeriCorps, USAGM, IAF, USADF, USICH still dissolving-and-live. FMCS and IMLS still restored; IMLS opened FY2027 applications due Nov 13.
- USTR TRQ still none. Fiscal Service / ESF / Do Not Pay / Mint / BEP / FSOC / CFIUS / Outbound — no new operating object.
- TVA, PBGC, Ginnie APM, FFB, FHLBanks, Farm Credit legal libraries, power marketing admins — empty hunts.
- CISA Logging Reference Architecture is live dated Aug 20 — standing watch stays unfired (object existed before this window).
What this does to the earlier ranked list
Keep 1A–2E's strongest legal objects (DHS LPR IFR, Census NPRM, Canada §338, DPA split, OFAC Iran stay, H.R. 2069/5366, exam-cycle IFR, Duane Arnold close, USPS PI). Add the table above as chart-walk finds. Do not pretend the targeted weekly already covered FERC, NRC, EXIM, DFC, CISA, CMS preclusion, or NNSA LAMP.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 3 merge — what the chart walk added