Permanent Magnets
Core package cutoff: 2026-07-22
New York footprint extension cutoff: 2026-09-04 ET
Project Vault return refresh cutoff: 2026-10-05 ET
Lifecycle: active — retained Workbench evidence; no vault promotion has occurred
Scope: the industrial permanent-magnet stack, centered on sintered NdFeB and the separate SmCo/high-temperature lane
Read in this order:
- `PROJECT_VAULT_RETURN_REFRESH_2026-10-05.md` — current Project Vault vehicle, governance and still-missing finance/custody state.
- `PERMANENT_MAGNET_RESEARCH_PACKAGE.md` — short answer and integrated factual spine.
- `PERMANENT_MAGNET_COMPANY_REGISTRY.md` — who actually occupies each link and what state each project has reached.
- `PERMANENT_MAGNET_NEW_YORK_FOOTPRINT.md` — New York operating sites, office-only footprints, missing ferrite/converter nodes and exact process limits.
- `PERMANENT_MAGNET_TRANSITION_TIMELINE.md` — export-control, financing, production, qualification and acquisition clocks.
- `PERMANENT_MAGNET_CLAIM_AUDIT.md` — corrections to the most load-bearing public and vault claims.
- `PERMANENT_MAGNET_SOURCE_WATCHBOARD.md` — exact observables that can move a company or policy state.
- `PERMANENT_MAGNET_EXISTING_CORPUS_AUDIT.md` — what the live vault already caught and what remains missing.
Governing rule
Do not collapse ore, mixed concentrate, separated oxide, metal, alloy/flake, magnet block, finished magnet, motor, or qualified end-use part. They are different products with different plants, yields, customers and legal controls.
Do not collapse announced nameplate capacity into commissioned equipment, first article, customer qualification, commercial shipment, sustained output or profitable output.
Package boundary
This package covers conventional permanent magnets and their supply chain. It does not turn the vault's broader Electromagnetism plotline into an industrial-magnets category. Superconducting magnets, fusion coils, medical MRI magnets and speculative magnetic phenomena are adjacent research lanes, not interchangeable evidence.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.