Skip to content

Permanent-magnet company registry

Core registry as of: 2026-07-22

New York extension as of: 2026-09-04 ET; see `PERMANENT_MAGNET_NEW_YORK_FOOTPRINT.md`

Purpose: identify the legal/industrial function actually performed and prevent proposed capacity from being reported as production

Required distinctions

For each company or project, keep these objects separate:

  1. parent and operating subsidiary;
  2. mine/resource and its current permit/construction/production state;
  3. concentrate, mixed carbonate, separated oxide, metal/alloy and magnet products;
  4. site name and country;
  5. announced, financed, under construction, commissioned and commercial states;
  6. nameplate capacity, current run rate, customer-qualified capacity and reported shipments;
  7. company claim, counterparty confirmation, regulator filing and measured output;
  8. grant, conditional commitment, final agreement, disbursement and repayment;
  9. memorandum, binding offtake, customer nomination and completed delivery.

Status vocabulary

A. United States magnet makers

Company / legal seamSites and functionCurrent controlled stateCapacity / next clockPublic-state seamSource anchors
Noveon Magnetics, Inc.; formerly Urban Mining Co.San Marcos, TX; recycled/direct feed into sintered NdFeBCOMMERCIAL — VERIFIED SHIPMENT. GM deliveries began Jul. 2025; ABB deliveries began Aug. 2025; Nidec offtake begins 20252,000-tpa facility capacity is widely reported; sustained actual annual output not publicly audited. Korea 2,000-tpa plant is only MOU/planned for 2027prior DoD support; $215m Series C in Jan. 2026GM; ABB; Nidec; Series C
MP Materials Corp.; Mountain Pass/MP Magnetics entitiesMountain Pass, CA mining/separation/recycling; Independence, Fort Worth, TX metal/alloy/magnets; 10X, Northlake, TX plannedCOMMERCIAL — EARLY RAMP. Commercial metal in 2024; first alloy/finished magnets on commercial equipment in 2025; GM ramp expected 202610X commissioning targeted 2028; total U.S. magnet capacity target about 10,000 tpaDoD preferred equity/warrant, $110/kg NdPr floor, 10-year 10X outlet support, HREE loan; Apple $500m partnership2025 results; 10X; DoD
eVAC Magnetics LLC / VAC GroupSumter, SC; sintered NdFeB; parent has German/global alloy and magnet operationsCOMMERCIAL — VERIFIED SHIPMENT. First Sumter shipment Dec. 12, 2025company target 2,000 tpa by Q1 2026, expandable; sustained run-rate evidence remains openDoD $94.1m award and reported §48C support; MP feedstock relationshipfirst shipment
USA Rare Earth, Inc. and operating subsidiariesStillwater, OK magnets; Less Common Metals/Blacksburg, SC metal/alloy; Round Top, TX proposed mine/separationCOMMISSIONED / RAMP. Stillwater Phase 1a commissioned Mar. 2026; commercial-order and run-rate targets are not yet equivalent to verified deliverycompany targets 600-tpa run rate by Q4 2026, 1,200 tpa Q1 2027; Commerce package supports eventual 10,000-tpa magnet plus 10,000-tpa metal/alloyfinal Commerce agreement up to $277m incentives + $1.3bn loan; equity/warrant rights were part of policy structureCommerce final agreement; Q1 results
Vulcan Elements, Inc.Durham, NC small commercial/R&D facility; Benson, NC proposed large magnet campusSMALL-SCALE COMMERCIAL / ANNOUNCED SCALE. Do not count Benson output yetproposed 10,000 tpa; site and equipment/build milestones are next proof$620m OSC conditional loan; $50m Commerce CHIPS letter/award track; federal warrants/equity features reported in official packageOSC; NIST
Evolution Metals & Technologies Corp. (EMAT) and Korean subsidiariesHanda/KMMI/NS World/KCM Korean operating assets; proposed U.S. integrated campusFOREIGN COMMERCIAL BASE / U.S. ANNOUNCED. New listed roll-up; U.S. production not establishedaggressive 2026/long-term capacity targets require machine installation, yield and customer proofpublic-company capital markets; no equivalent final federal build package confirmed in this sweep2026 10-Q
Electron Energy Corp. / PermagLancaster, PA; SmCo magnets and assemblies for aerospace/defenseCOMMERCIAL — SPECIALTY. Separate from the NdFeB scale raceexact current tonnes not public; qualification and program exposure matter more than commodity capacitydefense-qualified domestic-source relevancePermag
Arnold Magnetic TechnologiesRochester, NY headquarters and magnet-fabrication/precision-assembly plant; Sheffield, UK; Shenzhen, China; Lupfig, Switzerland SmCo block/alloy sourceCOMMERCIAL — SPECIALTY/GLOBAL. Rochester is an operating fabrication and assembly site, not only a corporate addressexact current tonnes not refreshed; company says SmCo block moves from Lupfig to Rochester for fabricationdefense/aerospace and high-temperature qualificationArnold; Rochester capabilities; SmCo path
TDA MagneticsU.S. specialty magnet producerCOMMERCIAL / QUALIFIED NICHEsmall capacity; program qualification rather than headline tonnesDoD-supported alternative domestic suppliercompany and DoD records require deeper contract-level pass

New York extension — additional industrial nodes

CompanyNew York site and actual functionControlled stateImportant limitSource
Hoosier MagneticsOgdensburg; strontium hard-ferrite powder for sintered and bonded permanent magnets; corporate office, R&D and manufacturing consolidated at the siteCOMMERCIAL — FERRITE MATERIALrare-earth-free ferrite lane, not NdFeB or SmCo; current audited tonnes not publicHoosier; products; 2026 city filing
Rochester Magnet CompanyEast Rochester; converting, custom fabrication and magnetic assemblies using flexible, rare-earth, ceramic and Alnico productsCOMMERCIAL — CONVERTER / ASSEMBLERno evidence located for alloy melting, powder metallurgy, pressing or sintering of rare-earth blocks; feedstock origin openRochester Magnet; products
Cerion NanomaterialsRochester existing nanomaterials facility supporting Niron's federally backed pilot iron-nitride magnet projectSMALL-SCALE R&D / PILOT PROJECT ROLEDOE project record does not establish commercial precursor or magnet tonnesDOE; Cerion
REEgenIthaca biological rare-earth recovery R&D; planned SouthWorks scale-up space; 2026 DOE/REMADE demonstration with RITACTIVE R&D / DEMONSTRATION; SCALE-UP PLANNEDno current commercial oxide, metal or magnet output establishedDOE; Cornell
TAM Ceramics Group of New YorkNiagara Falls ceramic-powder processing; 2013-14 rare-earth/magnet-recycling proposal with ReNewCURRENT CERAMICS / HISTORICAL RECYCLING PROJECT — PRESENT RECYCLING STATE UNVERIFIED2015 state report says TAM declined the related ESD award; current public site does not establish rare-earth recycling outputTAM; 2015 NY report

B. U.S. upstream, separation, metal and recycling nodes

Company / projectActual functionStateWhy it mattersSource
Energy Fuels / White Mesa Millmonazite processing and separated NdPr; Dy/Tb development; planned metalCOMMERCIAL NdPr; HREE PILOT/EXPANSIONone of the few live U.S. oxide nodes; not a finished-magnet plant2025 10-K; OSC conditional finance
ReElement Technologies / American Resourceschromatographic separation/refining and recyclingDEMONSTRATION / EARLY COMMERCIAL CLAIMpaired with Vulcan; output purity, tonnes and customer acceptance need independent proofOSC
Less Common Metals (USAR-owned)rare-earth metal, alloy and strip castingCOMMERCIAL INCUMBENTfills the oxide-to-magnet conversion seamUSAR filings and Commerce agreement
Niron Magneticsiron-nitride rare-earth-free magnet materialPILOT / SAMPLE; PLANT ANNOUNCEDpotential material substitution, but not current bulk supplyNiron; ARPA-E project
Project Vault operators and suppliersstrategic inventory, finance, logisticsAPPROVED/FORMATIONbridges producers, traders and OEMs; exact inventory and draw rules are keyEXIM

C. Allied upstream and midstream leaders

CompanySites / productCurrent stateImportant limitSource
Lynas Rare EarthsMt Weld mine, Kalgoorlie processing, Malaysia separation; NdPr plus first separated Dy/TbCOMMERCIALnot a scaled finished-magnet maker; proposed Texas HREE configuration remains uncertainFY26 half-year report
Serra Verde GroupPela Ema, Goiás, Brazil; mixed rare-earth concentrate containing Nd/Pr/Dy/TbCOMMERCIAL RAMPnot yet part of USAR: Apr. 2026 merger is signed and expected to close Q3, subject to conditionsUSAR merger announcement; SEC filing
Iluka Resources / EneabbaAustralian mineral sands stockpile and planned refinery; NdPr/Dy/Tb productsCONSTRUCTIONrefinery is not operating; commissioning target mid-2027June 2026 update
Neo Performance MaterialsSilmet, Estonia separation; Magnequench alloy/powder; Narva, Estonia magnet plantINCUMBENT MIDSTREAM; NEW MAGNET RAMPfirst samples/opening do not by themselves prove 2026 mass-production rateNeo Estonia
Arafura Rare Earths / NolansAustralian NdPr mine/separation projectDEVELOPMENT / FINANCED BUILD TRACKnot current production; construction and offtake conditions mattercompany and Australian-government project records; deeper refresh queued
Solvay La RochelleFrench rare-earth separationCOMMERCIAL/EXPANDINGmagnet-independent separation node; exact element/product output requires refreshNoveon–Solvay supply agreement

D. Asian and European magnet incumbents

CompanyRoleControlled stateWhy it belongs
JL MAG Rare-Earth Co.Chinese high-performance sintered NdFeBCOMMERCIAL — GLOBAL SCALEone of the largest public pure-play manufacturers; reported 40,000-tpa capacity in 2025 materials; China licensing exposure remains
Ningbo YunshengChinese NdFeB and assembliesCOMMERCIAL — GLOBAL SCALElarge integrated producer; official profile reports substantial blank capacity
Beijing Zhong Ke San HuanChinese sintered/bonded NdFeBCOMMERCIAL — GLOBAL SCALEmajor producer with deep technology/IP history
Zhenghai Magnetic MaterialChinese high-performance NdFeBCOMMERCIAL — GLOBAL SCALEmaterial automotive/industrial supplier; exact current output needs annual-report refresh
Shin-Etsu ChemicalJapanese integrated separation/refining, alloy and rare-earth magnets; Japan/Philippines productionINCUMBENT — SCALE NOT REFRESHEDhigh-quality auto/industrial magnets, recycling and heavy-rare-earth reductionproduct; recycling
Proterial / NEOMAXJapanese NdFeB/ferrite magnet and motor-material supplierINCUMBENT — SCALE NOT REFRESHEDfoundational patents and active heavy-rare-earth-free developmentmagnetic materials; 2025 development
TDKJapanese magnets, ferrites and electronic componentsINCUMBENT — SCALE NOT REFRESHEDintegrated component/customer relationships; current site-by-site capacity requires separate pass
VAC / VacuumschmelzeGerman alloy, magnet and magnetic-components incumbent; parent of eVACCOMMERCIAL — GLOBALprocess knowledge and Western customer qualification underpin the new U.S. plant

E. Customers and capital actors that function as industrial nodes

EntityMagnet-stack roleEvidence to track
General Motorsanchor customer for MP and Noveonqualified part families, annual delivered tonnes, dual-sourcing and GM confirmation
Apple$500m MP partnership and recycled-feedstock/magnet buyerMountain Pass recycling line, 2027 delivery start, product qualification and actual purchase volumes
ABBNoveon industrial-motor buyer; data-center/HVAC linkagemonthly deliveries and end-2026 share of North American motor parts
Nidecmotor incumbent and Noveon offtakerdelivery volumes under the five-year contract
Clarios, GE Vernova, Western Digital, BoeingProject Vault OEM demand indicationswhether indications become binding participation and draw arrangements
Hartree, Mercuria Americas, TraxysProject Vault suppliers/tradersinventory title, warehouse, hedging, price and draw mechanics
Department of War / OSCinvestor, lender, offtake/qualification authorityclosing, disbursement, warrants, price-support payments and sourcing rules
Commerce / CHIPS Programgrant, loan and equity-linked industrial policymilestone releases and project covenants
EXIMProject Vault senior financefinal draw, capital structure, eligible minerals and default/liquidation waterfall

Immediate diligence gaps

  1. Verified quarterly magnet tonnes, yield and scrap for every U.S. producer.
  2. Customer-qualified tonnes versus physical nameplate.
  3. Origin of NdPr, Dy/Tb and alloy feed used at each U.S. plant.
  4. Final/closed/disbursed state of every federal loan or equity tranche.
  5. Actual general-license coverage and transaction delay under China's April controls.
  6. 2026 mass-production state at Neo's Narva plant.
  7. Closing of the USAR–Serra Verde merger; do not consolidate before closing.
  8. SmCo raw-material and metallization map, including samarium/cobalt origin.

Sources

Full saved reading

View cited sources (43)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.