Permanent-magnet source watchboard
Cutoff: 2026-07-22
Purpose: monitor exact changes in law, finance, plant state, qualification and flow without promoting headlines into facts
Source hierarchy
- enacted law, executive order, regulation, customs/export-control notice;
- regulator, agency, court or official financing record;
- SEC/ASX/HKEX filing and audited company report;
- named customer/counterparty confirmation;
- company release or technical data sheet;
- trade reporting with named evidence;
- unattributed reporting, social claim or presentation projection.
Immediate watchboard
| Lane | Controlling source | Next observable | Promotion test | Weakening / falsifier |
|---|---|---|---|---|
| China April controls | MOFCOM, GACC, SCIO; importing-country customs | license scope, general-license recipients, average/maximum approval time, actual licensed volumes | official rule or customs/firm evidence tied to item and period | diplomatic language without operating data |
| China October suspension | MOFCOM/SCIO | action before 2026-11-10 | official extension, expiry, replacement or activation | assumption that suspension ends April controls |
| U.S. Section 232 PCMDP | White House, Commerce, USTR, Federal Register | agreements, minimum import prices, quotas, tariffs or report after 180-day milestone | published operative instrument with HTS/product scope and effective date | speech or fact sheet with no operative schedule |
| Section 301 magnets tariff | USTR, Federal Register, CBP HTS | 2026 effective implementation and exclusions | final HTS note/rate and CBP implementation | old proposed schedule only |
| July 20 defense order | White House, DoW, DFARS/Federal Register | Jan. 1, 2027 waiver practice; 180-day mapping policy; 90-day regulations; qualification guidance | issued policy/rule and contractor compliance terms | broad “ban” claim without rule text |
| MP Independence | MP 10-Q/10-K, GM | quarterly magnets produced/sold, GM-delivered tonnes, yield/scrap | numerical period output or named customer receipt | repeating “first magnets” without later throughput |
| MP 10X | MP filings, DoW, Texas records | groundbreak, equipment, financing, commissioning in 2028 | physical milestone and later qualification/output | planned 10,000 tpa repeated as present output |
| MP price floor | MP filings/DoW budget records | floor-support payments, NdPr market price, EBITDA support | filed payment/cost and period | treating $110/kg as universal market price |
| Apple–MP | Apple/MP filings | recycling-line operation and 2027 deliveries | named first shipment/receipt and product stream | partnership value alone |
| Noveon | Noveon, GM, ABB, Nidec, permits | quarterly/annual tonnes, 24/7 operation, actual deliveries | customer-confirmed delivered tonnes or audited output | 2,000-tpa nameplate alone |
| eVAC | eVAC/VAC, customer, South Carolina permits | proof of Q1 2026 ramp and named customers | sustained period output or counterparty shipment | first shipment reused as full-scale proof |
| USAR Stillwater | USAR SEC filings, customer releases | Q2 order fulfillment, Q4 600-tpa run rate, Q1 2027 1,200 tpa | actual magnets sold and period tonnes | “commissioned” or capacity target alone |
| USAR federal package | NIST/Commerce, SEC | milestone payments, loan draws, equity/warrant state | final closing/disbursement record with conditions | headline “$1.6bn award” treated as cash received |
| USAR–Serra Verde | SEC, DFC, Brazilian filings | Q3 close, shareholder/regulatory approval, offtake-SPV identity | closing 8-K and ownership update | definitive agreement alone |
| Serra Verde | company/USAR filings, DFC | 2026–27 MREC production, Phase 1 ramp, Nd/Pr/Dy/Tb recoveries | audited tonnes, recovery and shipped product | 6,400-tpa 2027 projection as current output |
| Vulcan/ReElement | OSC, NIST, company, local permits | conditional-loan close, construction, equipment commissioning, output quality | final loan/disbursement plus tonnes and customer qualification | conditional commitment or 10,000-tpa target alone |
| Energy Fuels | 10-Q/10-K, OSC | Dy/Tb commercial line, metallization, loan close | saleable separated product and customer/volume evidence | pilot sample or conditional finance |
| Neo Narva | Neo filings, EU/Estonia records, customers | 2026 mass-production start and actual tpa | customer-qualified output and reported sales | ribbon cutting/first samples |
| Lynas | ASX filings | Dy/Tb volumes, Malaysia/Kalgoorlie output, Texas decision | quarterly product volumes and final project instrument | “only outside China” claim without product/time scope |
| Iluka Eneabba | ASX, Australian government lender | construction percentage, commissioning mid-2027, first product | commissioning and saleable oxide output | construction/nameplate treated as operating |
| Project Vault | EXIM, SPV/company filings, suppliers/OEMs | legal vehicle, first loan draw, inventory purchased, title/warehouse/draw rules | executed documents or audited inventory | $12bn headline alone |
| DLA stockpile | DLA Strategic Materials budget/procurement | NdPr oxide, NdFeB block and SmCo acquisitions | awarded contract and delivered inventory | potential-acquisition list |
| Niron | ARPA-E, Niron, customers | pilot yield, Plant 1 commissioning, performance/qualification, 10,000-tpa site | customer-qualified saleable magnets at measured volume | material-property sample as commercial scale |
| SmCo lane | DLA, Permag/EEC, Arnold, cobalt/samarium suppliers | domestic metal/alloy origin and defense-qualified output | product/site/tonnes and program qualification | assuming NdFeB supply solves SmCo |
Six measurements that matter more than nameplate
- finished magnet tonnes sold by grade and site;
- first-pass yield and scrap return;
- qualified customer part numbers and time to approval;
- NdPr/Dy/Tb/Sm origin and inventory days;
- average export-license lead time and rejected/paused transactions;
- state-support cash received or paid, separated into equity, loan draw, price support and offtake purchase.
Trigger radar
Near term: now through 2026-11-10
- USAR–Serra Verde closing or delay;
- evidence for USAR Stillwater customer shipments and run rate;
- first hard eVAC throughput disclosure;
- Section 232 post-180-day instrument or explicit non-action;
- China October-control suspension decision;
- Project Vault legal/operating documents;
- defense implementation guidance under the July 20 order.
2027
- Jan. 1 waiver/mitigation implementation;
- USAR 1,200-tpa ramp evidence;
- Apple–MP first deliveries;
- Iluka first commissioning/product;
- Noveon/ABB end-2026 ramp proof;
- China/allied price-floor or trade-agreement implementation.
2028–2030
- MP 10X, USAR 10k platform, Vulcan Benson and other large projects moving from nameplate to customer-qualified tonnes;
- evidence of overbuild, consolidation or state-supported idle capacity;
- heavy-rare-earth-free grade adoption and iron-nitride/ferrite displacement by application;
- whether price floors remain necessary after production scales.
Falsifiable branch logic
| Branch | Confirming evidence | Falsifier |
|---|---|---|
| Domestic scale succeeds | multiple plants report repeat qualified shipments, rising yield and diversified customers | recurrent first-article announcements with no period tonnes |
| National-champion consolidation | federal support and OEM contracts concentrate in one or two platforms | comparable final finance and customer share across four or more producers |
| Overbuild appears | nameplate rises faster than qualified demand/feedstock; closures or delayed ramps | long-term offtake absorbs output at market prices without support |
| China control weakens structurally | non-China separation/metallization/magnet shares rise and licensing becomes non-material | continued license delays plus dependence on Chinese equipment/intermediates |
| Substitution breaks the choke point | customer-qualified rare-earth-free or HREE-free designs reach material volumes | pilot properties fail cost, heat, manufacturability or scale tests |
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.