Skip to content

Research sweep source records · 365

31,545 research records. 15 records referring to separate-lane material are withheld from this public copy. The full original is preserved privately. Record dates and qualifications are unchanged; this is not a new factual review.

$21.4 million invested in fourteen projects

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-2026",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "$21.4 million invested in fourteen projects",
  "step_type": "official_institute_selection",
  "date": "2026-05-06",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Selected technical projects are not validated production or federal procurement.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-triplebar-006(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/news/biomade-announces-214-million-invested-in-14-projects"
}

Cell-free biomanufacturing at 100-liter pilot scale

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-cellfree",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "Cell-free biomanufacturing at 100-liter pilot scale",
  "step_type": "official_project_record",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Project scope targets pilot-scale validation, not commercial production.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-exozymes-005(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/cell-free-biomanufacturing"
}

$26 million invested in seventeen projects

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-2024",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "$26 million invested in seventeen projects",
  "step_type": "official_institute_selection",
  "date": "2024-04-02",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Selection and cost share do not prove cGMP or regulator acceptance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-tega-007(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/news/biomade-announces-26-million-invested-in-17-projects"
}

$7.5 million BioMaP project agreement

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-capra",
  "record_type": "action",
  "body": "Capra Biosciences, Inc.",
  "parent_body": "",
  "what": "$7.5 million BioMaP project agreement",
  "step_type": "company_award_record",
  "date": "2024-07-19",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Company announcement identifies the agreement; accepted API results and federal procurement remain open.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-capra-008(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.caprabiosciences.com/press/biomap-7-5m-award.html"
}

Methane-to-biopolymer integrated pilot project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-mango",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "Methane-to-biopolymer integrated pilot project",
  "step_type": "official_project_record",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "The project targets an integrated pilot, not certified commercial output.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-mango-009(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/cost-reduction-biomanufacturing-methane"
}

Bio-based carbon-fiber precursor project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-carbon",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "Bio-based carbon-fiber precursor project",
  "step_type": "official_project_record",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Lab samples and a demonstration plan do not establish defense qualification.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-industrialmicrobes-010(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/bio-based-carbon-fiber"
}

Squitex performance-fabric project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-biomade-textile",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "Squitex performance-fabric project",
  "step_type": "official_project_record",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Fermentation batches and evaluation material do not prove scaled textile qualification.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-tandem-011(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/squitex-performance-fabric"
}

Final DBIMP planning awards

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-dbimp",
  "record_type": "action",
  "body": "U.S. Department of War",
  "parent_body": "",
  "what": "Final DBIMP planning awards",
  "step_type": "official_planning_award",
  "date": "2024-11-14",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Every named award is planning unless a later build instrument is separately located.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-industrialmicrobes-010(supporting,CONFIRMED), w3-bio-checkerspot-012(supporting,CONFIRMED), w3-bio-lygos-013(supporting,STRONG INFERENCE)",
  "written_up_in": "",
  "source_url": "https://www.war.gov/News/Releases/Release/Article/3965368/dod-releases-final-nine-awards-for-distributed-bioindustrial-manufacturing-prog/"
}

BioMADE and Lygos pilot-facility agreement

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-lygos",
  "record_type": "action",
  "body": "BioMADE",
  "parent_body": "",
  "what": "BioMADE and Lygos pilot-facility agreement",
  "step_type": "official_facility_agreement",
  "date": "2025-06-10",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Agreement and investment plan do not establish commissioning; first PPN opening is planned for 2027.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-lygos-013(supporting,STRONG INFERENCE)",
  "written_up_in": "",
  "source_url": "https://www.biomade.org/news/biomade-and-lygos-to-fast-track-pilot-biomanufacturing-facility-in-california"
}

Industrial-base expansion contract portfolio

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-aspr-portfolio",
  "record_type": "action",
  "body": "Administration for Strategic Preparedness and Response",
  "parent_body": "",
  "what": "Industrial-base expansion contract portfolio",
  "step_type": "official_contract_portfolio",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Portfolio naming establishes active federal position; cGMP validation and accepted lots remain separate.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-capra-008(supporting,CONFIRMED), w3-bio-manus-014(supporting,CONFIRMED), w3-bio-antheia-015(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://aspr.hhs.gov/MCM/IBx/portfolio"
}

Expanded BioMaP agreement for domestic pharmaceutical ingredients

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-antheia",
  "record_type": "action",
  "body": "Antheia, Inc.",
  "parent_body": "",
  "what": "Expanded BioMaP agreement for domestic pharmaceutical ingredients",
  "step_type": "company_award_record",
  "date": "2026-03-04",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Agreement and earlier overseas commercial delivery do not prove validated U.S. federal production.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-bio-antheia-015(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://antheia.bio/antheia-secures-additional-9-million-in-expanded-biomap-consortium-project-agreement-to-onshore-pharmaceutical-supply-chains/"
}

US2QC final verification and validation phase

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-us2qc",
  "record_type": "action",
  "body": "DARPA",
  "parent_body": "",
  "what": "US2QC final verification and validation phase",
  "step_type": "official_program_selection",
  "date": "2025-03-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Final-phase participation is not a passed utility-scale benchmark.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-ms-016(supporting,CONFIRMED), w3-q-psi-017(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.darpa.mil/news/2025/quantum-computing-approaches"
}

Quantum Benchmarking Initiative Stage B selections

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-qbi-b",
  "record_type": "action",
  "body": "DARPA",
  "parent_body": "",
  "what": "Quantum Benchmarking Initiative Stage B selections",
  "step_type": "official_program_selection",
  "date": "2026-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Stage B is risk-reduction evaluation, not validated utility-scale computing.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-atom-018(supporting,CONFIRMED), w3-q-ibm-019(supporting,STRONG INFERENCE), w3-q-quantinuum-020(supporting,CONFIRMED), w3-q-ionq-021(supporting,CONFIRMED), w3-q-quera-022(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.darpa.mil/research/programs/quantum-benchmarking-initiative/stage-b-selection"
}

Quantum CHIPS letters of intent

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-quantum-chips",
  "record_type": "action",
  "body": "National Institute of Standards and Technology",
  "parent_body": "",
  "what": "Quantum CHIPS letters of intent",
  "step_type": "official_letter_of_intent",
  "date": "2026-05-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Planned incentives are not definitive agreements, construction or qualified output.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-psi-017(supporting,CONFIRMED), w3-q-atom-018(supporting,CONFIRMED), w3-q-ibm-019(supporting,STRONG INFERENCE), w3-q-quantinuum-020(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.nist.gov/news-events/news/2026/05/department-commerce-announces-letters-intent-9-companies-2-billion"
}

It's About Time optical-clock manufacturing contract

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-ionq-time",
  "record_type": "action",
  "body": "DARPA",
  "parent_body": "",
  "what": "It's About Time optical-clock manufacturing contract",
  "step_type": "official_contract_award",
  "date": "2026-08-06",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Contract establishes a manufacturing bridge; facility opening and qualified units remain future.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-ionq-021(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.darpa.mil/news/2026/its-about-time"
}

OASIC quantum testbed Phase 2

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-oasic",
  "record_type": "action",
  "body": "DARPA",
  "parent_body": "",
  "what": "OASIC quantum testbed Phase 2",
  "step_type": "official_program_award",
  "date": "2025-09-23",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Testbed participation does not validate a utility-scale computer or fielded sensor.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-quera-022(supporting,CONFIRMED), w3-q-vector-023(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.darpa.mil/news/2025/small-business-accelerates-transition-quantum-tech-lab-market"
}

Quantum inertial sensor delivered for X-37B

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-x37-quantum",
  "record_type": "action",
  "body": "Defense Innovation Unit",
  "parent_body": "",
  "what": "Quantum inertial sensor delivered for X-37B",
  "step_type": "official_delivery_record",
  "date": "2025-08-18",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Delivery and integration are confirmed; public quantitative on-orbit acceptance is not.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-vector-023(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.diu.mil/latest/advancing-quantum-sensing-for-the-dod-from-lab-to-orbit-within-months"
}

Active OTSB and small-business contracts portfolio

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-afrl-contracts",
  "record_type": "action",
  "body": "Air Force Research Laboratory",
  "parent_body": "",
  "what": "Active OTSB and small-business contracts portfolio",
  "step_type": "official_contract_portfolio",
  "date": "2025-09-22",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "The portfolio is a dated snapshot and does not prove completion or acceptance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-icarus-024(supporting,CONFIRMED), w3-q-astra-027(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.afrl.af.mil/Portals/90/Documents/SB/AFRL_Active_OTSB-SB_Contracts.pdf"
}

Transition of Quantum Sensing field-testing performers

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-tqs",
  "record_type": "action",
  "body": "Defense Innovation Unit",
  "parent_body": "",
  "what": "Transition of Quantum Sensing field-testing performers",
  "step_type": "official_prototype_roster",
  "date": "2026-02-12",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "OT performer status does not identify which company passed which field event.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-fei-025(supporting,STRONG INFERENCE)",
  "written_up_in": "",
  "source_url": "https://www.diu.mil/latest/dius-transition-of-quantum-sensing-tqs-field-testing-to-begin-across-five"
}

Real-time magnetic-navigation demonstration

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-magnav",
  "record_type": "action",
  "body": "Air Force Test Center",
  "parent_body": "",
  "what": "Real-time magnetic-navigation demonstration",
  "step_type": "official_test_record",
  "date": "2023-05-26",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Government demonstration does not establish company-product field acceptance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-sandbox-026(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.aftc.af.mil/News/Article/3411610/magnav-project-successfully-demonstrates-real-time-magnetic-navigation/"
}

MAVRC Phase 1 receiver awards

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-mavrc",
  "record_type": "action",
  "body": "Space Systems Command",
  "parent_body": "",
  "what": "MAVRC Phase 1 receiver awards",
  "step_type": "official_prototype_award",
  "date": "2026-07-29",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Requirements and risk reduction precede downselect, prototype and security certification.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-bae-028(supporting,CONFIRMED), w3-q-trimble-029(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article/4553786/aflcmc-partners-with-space-systems-command-to-award-next-gen-mavrc-gps-receiver"
}

GPS III completion and successor transition

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-gps",
  "record_type": "action",
  "body": "Space Systems Command",
  "parent_body": "",
  "what": "GPS III completion and successor transition",
  "step_type": "official_operating_record",
  "date": "2026-04-21",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Launch and production heritage do not automatically establish GPS IIIF on-orbit acceptance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-q-lockheed-030(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4467234/space-systems-command-looks-ahead-to-new-era-of-gps-success"
}

NSSL Phase 3 Lane 2 requirements contracts

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-nssl",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "NSSL Phase 3 Lane 2 requirements contracts",
  "step_type": "official_requirements_contract",
  "date": "2025-04-04",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Vehicle ceilings and selections are not mission execution.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-spacex-031(supporting,CONFIRMED), w3-space-ula-032(supporting,CONFIRMED), w3-space-blue-033(supporting,STRONG INFERENCE)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Contracts/Contract/Article/4146543/"
}

Task orders to launch missile-tracking spacecraft

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-sda-launch",
  "record_type": "action",
  "body": "Space Systems Command",
  "parent_body": "",
  "what": "Task orders to launch missile-tracking spacecraft",
  "step_type": "official_task_order",
  "date": "2026-04-03",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Launch orders require successful mission execution and payload acceptance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-spacex-031(supporting,CONFIRMED), w3-space-rocketlab-034(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article/4449626/space-systems-command-awards-task-orders-to-launch-missile-tracking-space-vehic"
}

Third Tranche 1 launch

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-york",
  "record_type": "action",
  "body": "Space Development Agency",
  "parent_body": "",
  "what": "Third Tranche 1 launch",
  "step_type": "official_launch_record",
  "date": "2026-07-16",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Launch is not checkout, mesh acceptance or initial warfighting capability.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-york-035(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.sda.mil/space-development-agency-successfully-completes-third-launch-of-tranche-1-satellites/"
}

Accelerated missile-defense tracking Tranche 3 awards

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-amdt3",
  "record_type": "action",
  "body": "Space Development Agency",
  "parent_body": "",
  "what": "Accelerated missile-defense tracking Tranche 3 awards",
  "step_type": "official_prototype_award",
  "date": "2026-07-30",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Prototype awards do not establish launch or operational missile custody.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-l3harris-036(supporting,CONFIRMED), w3-space-sierra-037(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.sda.mil/space-development-agency-issues-awards-to-build-36-accelerated-missile-defense-tracking-layer-satellites-for-tranche-3-in-support-of-golden-dome-for-america/"
}

FOO Fighter satellite award

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-foo",
  "record_type": "action",
  "body": "Space Development Agency",
  "parent_body": "",
  "what": "FOO Fighter satellite award",
  "step_type": "official_prototype_award",
  "date": "2024-04-30",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Build award does not establish fire-control-quality tracking.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-millennium-038(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.sda.mil/space-development-agency-makes-award-to-build-eight-satellites-for-foo-fighter-program/"
}

Second HALO Europa award

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-capella",
  "record_type": "action",
  "body": "Space Development Agency",
  "parent_body": "",
  "what": "Second HALO Europa award",
  "step_type": "official_prototype_award",
  "date": "2026-06-26",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Demo award does not prove successful secure waveform operation.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-capella-039(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.sda.mil/sda-makes-second-halo-europa-award/"
}

Blue Ghost lunar landing

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-firefly",
  "record_type": "action",
  "body": "NASA",
  "parent_body": "",
  "what": "Blue Ghost lunar landing",
  "step_type": "official_mission_record",
  "date": "2025-03-02",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Successful landing is mission-specific and does not guarantee repeatability.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-firefly-040(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.nasa.gov/news-release/touchdown-carrying-nasa-science-fireflys-blue-ghost-lands-on-moon/"
}

Additional lunar-delivery awards

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-clps-2026",
  "record_type": "action",
  "body": "NASA",
  "parent_body": "",
  "what": "Additional lunar-delivery awards",
  "step_type": "official_task_order",
  "date": "2026-07-28",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "New awards do not erase prior mission failures or prove future delivery.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-firefly-040(supporting,CONFIRMED), w3-space-astrobotic-042(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.nasa.gov/news-release/nasa-awards-more-moon-base-science-previews-new-opportunities/"
}

Intuitive Machines IM-2 mission outcome

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-im2",
  "record_type": "action",
  "body": "NASA",
  "parent_body": "",
  "what": "Intuitive Machines IM-2 mission outcome",
  "step_type": "official_mission_record",
  "date": "2025-03-07",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Landing and limited data do not constitute full payload success.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-intuitive-041(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.nasa.gov/news-release/nasa-receives-some-data-before-intuitive-machines-ends-lunar-mission/"
}

Peregrine mission conclusion

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-peregrine",
  "record_type": "action",
  "body": "NASA",
  "parent_body": "",
  "what": "Peregrine mission conclusion",
  "step_type": "official_mission_record",
  "date": "2024-01-19",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Mission ended without lunar landing; later awards remain separate.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-astrobotic-042(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.nasa.gov/news-release/nasa-science-astrobotic-peregrine-mission-one-concludes/"
}

Astroscale U.S. servicing award

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-astroscale",
  "record_type": "action",
  "body": "Space Systems Command",
  "parent_body": "",
  "what": "Astroscale U.S. servicing award",
  "step_type": "official_prototype_award",
  "date": "2024-01-30",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Award and planned delivery do not prove launch, rendezvous or refueling.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-astroscale-043(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.ssc.spaceforce.mil/LinkClick.aspx?fileticket=K-_cYTj2lS8%3D&portalid=3"
}

Army and Navy hypersonic missile test

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-hypersonic-test",
  "record_type": "action",
  "body": "U.S. Department of War",
  "parent_body": "",
  "what": "Army and Navy hypersonic missile test",
  "step_type": "official_test_record",
  "date": "2026-04-02",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "A test event does not establish production qualification or fielding.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-lockheed-044(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.war.gov/serve-from-netstorage/News/Releases/Release/Article/4450358/army-and-navy-continue-tests-of-hypersonic-missile/index.html"
}

Glide Phase Interceptor design options

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-gpi",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "Glide Phase Interceptor design options",
  "step_type": "official_prototype_award",
  "date": "2024-09-25",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Design options do not prove hardware, qualification or intercept.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-lockheed-044(supporting,CONFIRMED), w3-space-northrop-045(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Contracts/Contract/Article/3964063/"
}

Common hypersonic glide-body production contract

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-dynetics",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "Common hypersonic glide-body production contract",
  "step_type": "official_contract_award",
  "date": "2024-10-30",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Contract does not prove lot acceptance or fielded rounds.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-dynetics-046(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Contracts/Contract/Article/3974996/"
}

Reusable hypersonic test-vehicle demonstrations

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-mach",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "Reusable hypersonic test-vehicle demonstrations",
  "step_type": "official_test_record",
  "date": "2025-04-30",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Two recoverable flights do not establish sustained cadence.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-leidos-047(supporting,CONFIRMED), w3-space-stratolaunch-048(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Releases/Release/Article/4174167/department-of-defense-demonstrates-reusability-of-hypersonic-test-vehicle/"
}

SM-6 production option

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-raytheon",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "SM-6 production option",
  "step_type": "official_production_award",
  "date": "2025-04-04",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Production option requires accepted lots and performance.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-raytheon-049(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Contracts/Contract/Article/4146543/"
}

Dual Band Decoy production modification

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
  "record_id": "w3-src-bae-decoy",
  "record_type": "action",
  "body": "U.S. Department of Defense",
  "parent_body": "",
  "what": "Dual Band Decoy production modification",
  "step_type": "official_production_award",
  "date": "2025-06-13",
  "date_kind": "source date (as listed)",
  "other_dates": "",
  "stage_or_status": "Production award does not prove delivered and accepted assemblies.",
  "codex_grade": "",
  "codex_reason": "cited by edges: w3-space-bae-050(supporting,CONFIRMED)",
  "written_up_in": "",
  "source_url": "https://www.defense.gov/News/Contracts/Contract/Article/4228977/"
}

screened synthetic-DNA provider — federal nucleic-acid screening framework and benchmark program — anticipated instrument: procurement eligibility rule and self-attested compliance

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-twist-001",
  "record_type": "body",
  "body": "Twist Bioscience Corporation",
  "parent_body": "HHS / OSTP / NIST",
  "what": "screened synthetic-DNA provider — federal nucleic-acid screening framework and benchmark program — anticipated instrument: procurement eligibility rule and self-attested compliance",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "procurement_gate_incumbent",
  "codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=B; fit_grade=4; path_grade=4; visual_band=acquisition_near",
  "codex_reason": "missing_gate: Published benchmark result and October 2026 50-nucleotide transition controls. | boundary: The rule applies and the company reports compliance; no public independent NIST pass or federal award is established.",
  "written_up_in": "",
  "source_url": ""
}

screened synthetic-DNA provider — federal nucleic-acid screening framework — anticipated instrument: procurement eligibility and company attestation

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-idt-002",
  "record_type": "body",
  "body": "Integrated DNA Technologies, Inc.",
  "parent_body": "HHS / OSTP / NIST",
  "what": "screened synthetic-DNA provider — federal nucleic-acid screening framework — anticipated instrument: procurement eligibility and company attestation",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "procurement_gate_incumbent",
  "codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=B; fit_grade=4; path_grade=4; visual_band=acquisition_near",
  "codex_reason": "missing_gate: Published validation and cross-order identity controls. | boundary: Company screening posture is strong but independent federal benchmark passage is not public.",
  "written_up_in": "",
  "source_url": ""
}

cell-free protein manufacturing performer — Reimagining Protein Manufacturing — anticipated instrument: named program performer

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-ginkgo-rpm-003",
  "record_type": "body",
  "body": "Ginkgo Bioworks, Inc.",
  "parent_body": "DARPA",
  "what": "cell-free protein manufacturing performer — Reimagining Protein Manufacturing — anticipated instrument: named program performer",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "named_darpa_performer",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Published IV&V results and an operational customer. | boundary: Performer status and ambitious metrics are confirmed; independent metric passage and transition are not.",
  "written_up_in": "",
  "source_url": ""
}

pathogen-surveillance network integrator — Traveler-based Genomic Surveillance and future diagnostic networks — anticipated instrument: historical operating partnership and future recompetition path

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-ginkgo-surv-004",
  "record_type": "body",
  "body": "Ginkgo Bioworks, Inc.",
  "parent_body": "CDC / BARDA",
  "what": "pathogen-surveillance network integrator — Traveler-based Genomic Surveillance and future diagnostic networks — anticipated instrument: historical operating partnership and future recompetition path",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "validated_historical_deployment",
  "codex_grade": "forecast_label=SUPPORTED INFERENCE; evidence_grade=A; fit_grade=4; path_grade=2; visual_band=installed_stack",
  "codex_reason": "missing_gate: Current CDC, BARDA or DxR2 contract and funding. | boundary: Large deployed performance is documented through 2024; a current FY2026 award is not.",
  "written_up_in": "",
  "source_url": ""
}

cell-free biomanufacturing pilot performer — cell-free isobutanol pilot project — anticipated instrument: selected cost-shared pilot project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-exozymes-005",
  "record_type": "body",
  "body": "eXoZymes Inc.",
  "parent_body": "Department of War / BioMADE",
  "what": "cell-free biomanufacturing pilot performer — cell-free isobutanol pilot project — anticipated instrument: selected cost-shared pilot project",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "selected_100l_pilot_project",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Independent yield, productivity, COGS and qualification results. | boundary: The project is confirmed; repeated 100-liter performance, economics and offtake are not.",
  "written_up_in": "",
  "source_url": ""
}

AI protein and strain-design platform — 2026 genomic language-model project — anticipated instrument: selected technical project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-triplebar-006",
  "record_type": "body",
  "body": "Triplebar Bio, Inc.",
  "parent_body": "Department of War / BioMADE",
  "what": "AI protein and strain-design platform — 2026 genomic language-model project — anticipated instrument: selected technical project",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "selected_biomade_project",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=B; fit_grade=4; path_grade=2; visual_band=confirmed",
  "codex_reason": "missing_gate: External cross-strain validation and production result. | boundary: Selection is confirmed; held-out validation, scale-up and customer transition are not.",
  "written_up_in": "",
  "source_url": ""
}

recombinant heparin developer — recombinant glycosaminoglycan scale-up — anticipated instrument: selected project and prior SBIR path

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-tega-007",
  "record_type": "body",
  "body": "TEGA Therapeutics, Inc.",
  "parent_body": "BioMADE / NIH / ARMI",
  "what": "recombinant heparin developer — recombinant glycosaminoglycan scale-up — anticipated instrument: selected project and prior SBIR path",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "federal_scaleup_and_regulatory_project",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Validated lots and regulator-accepted pathway. | boundary: Federal scale-up position is confirmed; cGMP consistency and FDA acceptance are not.",
  "written_up_in": "",
  "source_url": ""
}

continuous-biomanufacturing API performer — DPA Title III API project — anticipated instrument: $7.5 million project agreement

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-capra-008",
  "record_type": "body",
  "body": "Capra Biosciences, Inc.",
  "parent_body": "ASPR / BioMaP",
  "what": "continuous-biomanufacturing API performer — DPA Title III API project — anticipated instrument: $7.5 million project agreement",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "active_biomap_project_agreement",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
  "codex_reason": "missing_gate: BioMaP-X validation, DMFs and accepted API lots. | boundary: The federal project is confirmed; public three-API validation, cGMP records and procurement are not.",
  "written_up_in": "",
  "source_url": ""
}

methane-to-biopolymer pilot operator — methane-to-PHA project — anticipated instrument: selected integrated pilot project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-mango-009",
  "record_type": "body",
  "body": "Mango Materials, Inc.",
  "parent_body": "Department of War / BioMADE",
  "what": "methane-to-biopolymer pilot operator — methane-to-PHA project — anticipated instrument: selected integrated pilot project",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "selected_integrated_pilot",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Certified lots, repeatability and customer test. | boundary: Project and field site are confirmed; repeat runs, specifications and commercial output are not.",
  "written_up_in": "",
  "source_url": ""
}

bio-based polymer and precursor developer — bio-based carbon-fiber project and DBIMP planning — anticipated instrument: selected project plus planning award

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-industrialmicrobes-010",
  "record_type": "body",
  "body": "Industrial Microbes, Inc.",
  "parent_body": "Department of War / BioMADE",
  "what": "bio-based polymer and precursor developer — bio-based carbon-fiber project and DBIMP planning — anticipated instrument: selected project plus planning award",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "project_and_dbimp_planning_award",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Demonstration lot and tensile, thermal and process acceptance. | boundary: Scale evidence and planning are real; a build award and qualified fiber are not.",
  "written_up_in": "",
  "source_url": ""
}

protein-fiber and textile developer — Squitex and spent-yeast fiber projects — anticipated instrument: completed scale project plus active qualification project

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
  "record_id": "w3-bio-tandem-011",
  "record_type": "body",
  "body": "Tandem Repeat Technologies, Inc.",
  "parent_body": "Department of War / BioMADE",
  "what": "protein-fiber and textile developer — Squitex and spent-yeast fiber projects — anticipated instrument: completed scale project plus active qualification project",
  "step_type": "Biotechnology and biomanufacturing",
  "date": "",
  "date_kind": "",
  "other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
  "stage_or_status": "scaled_batches_and_active_qualification",
  "codex_grade": "forecast_label=CONFIRMED; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=confirmed",
  "codex_reason": "missing_gate: Large campaign, standards pass and production line. | boundary: Thousand-liter batches and evaluation material are confirmed; 500-kilogram production and standards passage are not.",
  "written_up_in": "",
  "source_url": ""
}