31,545 research records. 15 records referring to separate-lane material are withheld from this public copy. The full original is preserved privately. Record dates and qualifications are unchanged; this is not a new factual review.
fermentation-oil platform and future facility developer — Distributed Bioindustrial Manufacturing Program — anticipated instrument: planning award
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-bio-checkerspot-012",
"record_type": "body",
"body": "Checkerspot, Inc.",
"parent_body": "Department of War",
"what": "fermentation-oil platform and future facility developer — Distributed Bioindustrial Manufacturing Program — anticipated instrument: planning award",
"step_type": "Biotechnology and biomanufacturing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "dbimp_planning_award",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Site, follow-on build award and MIL-SPEC testing. | boundary: The $3.19 million planning award is confirmed; it is not a build award or qualified product.",
"written_up_in": "",
"source_url": ""
}
pilot-facility operator and biochemical producer — DBIMP and Pilot Plant Network — anticipated instrument: planning award plus facility-transition agreement
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-bio-lygos-013",
"record_type": "body",
"body": "Lygos, Inc.",
"parent_body": "Department of War / BioMADE",
"what": "pilot-facility operator and biochemical producer — DBIMP and Pilot Plant Network — anticipated instrument: planning award plus facility-transition agreement",
"step_type": "Biotechnology and biomanufacturing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "planning_award_and_facility_agreement",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=acquisition_near",
"codex_reason": "missing_gate: Commissioning, customer runs and separate build award. | boundary: Planning and facility agreement are confirmed; Hayward is not commissioned and first PPN opening is planned for 2027.",
"written_up_in": "",
"source_url": ""
}
pharmaceutical-ingredient manufacturer — industrial-base expansion portfolio — anticipated instrument: active DPA Title III agreements
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-bio-manus-014",
"record_type": "body",
"body": "Manus Bio, Inc.",
"parent_body": "ASPR / BioMaP",
"what": "pharmaceutical-ingredient manufacturer — industrial-base expansion portfolio — anticipated instrument: active DPA Title III agreements",
"step_type": "Biotechnology and biomanufacturing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_aspr_expansion_awards",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Line commissioning, DMFs and federal offtake. | boundary: Federal expansion and an operating ingredient site are real; new accepted cGMP lots and procurement are not.",
"written_up_in": "",
"source_url": ""
}
topological-quantum computing finalist — US2QC final phase — anticipated instrument: final government verification and validation phase
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-ms-016",
"record_type": "body",
"body": "Microsoft Corporation",
"parent_body": "DARPA",
"what": "topological-quantum computing finalist — US2QC final phase — anticipated instrument: final government verification and validation phase",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "final_government_vv_phase",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Government-verified component and system findings. | boundary: Final-phase participation is confirmed; no public passed utility-scale benchmark exists.",
"written_up_in": "",
"source_url": ""
}
photonic-quantum finalist and scale candidate — US2QC and quantum CHIPS — anticipated instrument: final V&V plus letter of intent
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-psi-017",
"record_type": "body",
"body": "PsiQuantum Corp.",
"parent_body": "DARPA / Commerce",
"what": "photonic-quantum finalist and scale candidate — US2QC and quantum CHIPS — anticipated instrument: final V&V plus letter of intent",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "final_vv_and_chips_loi",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: V&V findings, definitive agreement and qualified packaging. | boundary: V&V participation and planned incentives are confirmed; passed benchmark and final CHIPS agreement are not.",
"written_up_in": "",
"source_url": ""
}
neutral-atom computing candidate — QBI Stage B and quantum CHIPS — anticipated instrument: risk-reduction selection plus letter of intent
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-atom-018",
"record_type": "body",
"body": "Atom Computing Inc.",
"parent_body": "DARPA / Commerce",
"what": "neutral-atom computing candidate — QBI Stage B and quantum CHIPS — anticipated instrument: risk-reduction selection plus letter of intent",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "qbi_stage_b_and_chips_loi",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Stage C entry and validated large arrays. | boundary: Stage B and planned incentives are real; Stage C and final agreement are not.",
"written_up_in": "",
"source_url": ""
}
superconducting-compute candidate; foundry sponsor — QBI Stage B and proposed quantum foundry — anticipated instrument: risk-reduction selection plus unresolved-subsidiary LOI
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-ibm-019",
"record_type": "body",
"body": "International Business Machines Corporation",
"parent_body": "DARPA / Commerce",
"what": "superconducting-compute candidate; foundry sponsor — QBI Stage B and proposed quantum foundry — anticipated instrument: risk-reduction selection plus unresolved-subsidiary LOI",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "qbi_stage_b_and_unresolved_foundry_loi",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=acquisition_near",
"codex_reason": "missing_gate: Recipient entity, site, definitive agreement and qualified wafers. | boundary: IBM's Stage B role is confirmed; the planned foundry recipient subsidiary and site are unresolved.",
"written_up_in": "",
"source_url": ""
}
trapped-ion computing and application performer — QBI Stage B, quantum CHIPS LOI and ARPA-E QC3 — anticipated instrument: risk-reduction and funded application paths
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-quantinuum-020",
"record_type": "body",
"body": "Quantinuum LLC",
"parent_body": "DARPA / Commerce / DOE",
"what": "trapped-ion computing and application performer — QBI Stage B, quantum CHIPS LOI and ARPA-E QC3 — anticipated instrument: risk-reduction and funded application paths",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "multi_program_evaluation_path",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Stage C or validated DOE result. | boundary: Multiple funded paths are real; Stage C, final incentive and useful application result are not.",
"written_up_in": "",
"source_url": ""
}
quantum-stack integrator and clock-manufacturing prime — QBI, HARQ and It's About Time — anticipated instrument: active program positions and manufacturing contract
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-ionq-021",
"record_type": "body",
"body": "IonQ, Inc.",
"parent_body": "DARPA",
"what": "quantum-stack integrator and clock-manufacturing prime — QBI, HARQ and It's About Time — anticipated instrument: active program positions and manufacturing contract",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "contracted_multi_lane_integrator",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Facility opening, qualified clocks and Stage C. | boundary: The manufacturing contract is confirmed; the facility and qualified production units do not yet exist.",
"written_up_in": "",
"source_url": ""
}
neutral-atom candidate and testbed performer — QBI Stage B and OASIC Phase 2 — anticipated instrument: risk-reduction selection plus testbed build
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-quera-022",
"record_type": "body",
"body": "QuEra Computing Inc.",
"parent_body": "DARPA",
"what": "neutral-atom candidate and testbed performer — QBI Stage B and OASIC Phase 2 — anticipated instrument: risk-reduction selection plus testbed build",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "qbi_stage_b_and_oasic_testbed",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Stage C or routinized government test access. | boundary: Compute candidacy and testbed role are confirmed; utility-scale validation is not.",
"written_up_in": "",
"source_url": ""
}
quantum inertial and atomic-clock subsystem developer — X-37B OTV-8 and OASIC — anticipated instrument: delivered and flown prototype plus testbed leadership
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-vector-023",
"record_type": "body",
"body": "Vector Atomic, Inc.",
"parent_body": "DIU / Space Force / DARPA",
"what": "quantum inertial and atomic-clock subsystem developer — X-37B OTV-8 and OASIC — anticipated instrument: delivered and flown prototype plus testbed leadership",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "delivered_integrated_and_flown_prototype",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Released performance and platform transition. | boundary: Delivery, integration and launch are confirmed; quantitative on-orbit acceptance is not.",
"written_up_in": "",
"source_url": ""
}
entangled-photon source developer — STTR Phase II — anticipated instrument: active contract FA9451-24-C-X064
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-icarus-024",
"record_type": "body",
"body": "ICARUS QUANTUM INC",
"parent_body": "Air Force Research Laboratory",
"what": "entangled-photon source developer — STTR Phase II — anticipated instrument: active contract FA9451-24-C-X064",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_sttr_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=3; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Packaged-source metrics and link integration. | boundary: The component contract is confirmed; an operating network and Phase III transition are not.",
"written_up_in": "",
"source_url": ""
}
atomic-frequency-standard incumbent — Transition of Quantum Sensing — anticipated instrument: OT performer position with prior space-clock contract heritage
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-fei-025",
"record_type": "body",
"body": "Frequency Electronics, Inc.",
"parent_body": "DIU / AFRL",
"what": "atomic-frequency-standard incumbent — Transition of Quantum Sensing — anticipated instrument: OT performer position with prior space-clock contract heritage",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "tqs_performer_with_clock_heritage",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=acquisition_near",
"codex_reason": "missing_gate: Field result and production task order. | boundary: Current prototype roster and heritage are confirmed; a published TQS result or accepted flight unit is not.",
"written_up_in": "",
"source_url": ""
}
magnetic-navigation sensor and software provider — MagNav and AQNav transition work — anticipated instrument: funded transition partnership and flight demonstration
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-sandbox-026",
"record_type": "body",
"body": "Sandbox AQ, Inc.",
"parent_body": "Air Force / AFWERX",
"what": "magnetic-navigation sensor and software provider — MagNav and AQNav transition work — anticipated instrument: funded transition partnership and flight demonstration",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "flight_demonstrated_transition_partner",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: Quantified repeat accuracy, procurement and program integration. | boundary: Government MagNav success and company participation are real; AQNav field acceptance is not.",
"written_up_in": "",
"source_url": ""
}
small-platform magnetic-navigation developer — active magnetic-navigation contract — anticipated instrument: direct small-business contract
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-q-astra-027",
"record_type": "body",
"body": "ASTRA NAVIGATION INC",
"parent_body": "Air Force Research Laboratory",
"what": "small-platform magnetic-navigation developer — active magnetic-navigation contract — anticipated instrument: direct small-business contract",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=3; visual_band=confirmed",
"codex_reason": "missing_gate: End-of-contract test results and Phase III. | boundary: The contract is confirmed; completed testing and operational acceptance are not.",
"written_up_in": "",
"source_url": ""
}
in-space servicing prime — Space Mobility and Logistics — anticipated instrument: prototype OTA
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-astroscale-043",
"record_type": "body",
"body": "Astroscale U.S. Inc.",
"parent_body": "Space Systems Command",
"what": "in-space servicing prime — Space Mobility and Logistics — anticipated instrument: prototype OTA",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "funded_refueling_prototype",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Launch, rendezvous and two safe transfers. | boundary: Award and planned two-refueling demo are confirmed; launch and transfers were not government-confirmed by cutoff.",
"written_up_in": "",
"source_url": ""
}
hypersonic and missile-defense system integrator — LRHW/CPS and Next Generation Interceptor — anticipated instrument: prime development and integration contracts
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-lockheed-044",
"record_type": "body",
"body": "Lockheed Martin Corporation",
"parent_body": "Army / Navy / Missile Defense Agency",
"what": "hypersonic and missile-defense system integrator — LRHW/CPS and Next Generation Interceptor — anticipated instrument: prime development and integration contracts",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "multi_program_prime",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Repeat all-up-round tests and successful intercept. | boundary: Prime positions are confirmed but represent separate clocks; qualified rounds and intercepts are not.",
"written_up_in": "",
"source_url": ""
}
common-glide-body and thermal-protection manufacturer — LRHW/CPS common glide body — anticipated instrument: $670.5 million production contract
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-dynetics-046",
"record_type": "body",
"body": "Dynetics Inc.",
"parent_body": "Army / Navy",
"what": "common-glide-body and thermal-protection manufacturer — LRHW/CPS common glide body — anticipated instrument: $670.5 million production contract",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_glide_body_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Lot acceptance and production cadence. | boundary: The contract is confirmed; qualified production cadence and fielded rounds are not.",
"written_up_in": "",
"source_url": ""
}
hypersonic test-rail prime — MACH-TB and Mayhem — anticipated instrument: test-rail prime plus IDIQ
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-leidos-047",
"record_type": "body",
"body": "Leidos Inc.",
"parent_body": "TRMC / Air Force",
"what": "hypersonic test-rail prime — MACH-TB and Mayhem — anticipated instrument: test-rail prime plus IDIQ",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "mach_tb_prime_and_mayhem_idiq",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Repeatable turnaround and task-order flow. | boundary: Prime and vehicle positions are confirmed; sustained weeks-scale cadence is not.",
"written_up_in": "",
"source_url": ""
}
reusable hypersonic flight-vehicle operator — MACH-TB and direct MDA OTA — anticipated instrument: subcontract performance plus direct prototype award
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-stratolaunch-048",
"record_type": "body",
"body": "Stratolaunch LLC",
"parent_body": "TRMC / Missile Defense Agency",
"what": "reusable hypersonic flight-vehicle operator — MACH-TB and direct MDA OTA — anticipated instrument: subcontract performance plus direct prototype award",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "recoverable_flights_and_direct_ota",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Repeated government missions and accepted data. | boundary: Two recoverable flights are confirmed; recurring customer cadence and separate MDA campaign completion are not.",
"written_up_in": "",
"source_url": ""
}
missile-interceptor production incumbent — SM-6 and SM-3 production — anticipated instrument: active production awards
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-raytheon-049",
"record_type": "body",
"body": "Raytheon Co.",
"parent_body": "Navy / Missile Defense Agency",
"what": "missile-interceptor production incumbent — SM-6 and SM-3 production — anticipated instrument: active production awards",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_interceptor_production",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Lot acceptance and delivery. | boundary: Production position is confirmed; accepted lots at required cadence remain the operating metric.",
"written_up_in": "",
"source_url": ""
}
signature-management countermeasure producer — Dual Band Decoy — anticipated instrument: production modification for 200 assemblies
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#edges",
"record_id": "w3-space-bae-050",
"record_type": "body",
"body": "BAE Systems Information and Electronic Systems Integration Inc.",
"parent_body": "U.S. Navy",
"what": "signature-management countermeasure producer — Dual Band Decoy — anticipated instrument: production modification for 200 assemblies",
"step_type": "Space, hypersonics and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_decoy_production_award",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Delivery, reliability and platform acceptance. | boundary: The production modification is confirmed; delivered and platform-accepted assemblies are not.",
"written_up_in": "",
"source_url": ""
}
U.S. Space Force advances Space Data Network backbone for global warfighter connectivity
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-sdn",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "U.S. Space Force advances Space Data Network backbone for global warfighter connectivity",
"step_type": "official_award_release",
"date": "2026-05-26",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names a $2.29 billion firm-fixed-price prototype delivery order to SpaceX and a planned end-2027 operational prototype; it does not establish operational acceptance or service availability.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-spacex-001(supporting,CONFIRMED), w4-comm-spacex-001(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4501527/us-space-force-advances-space-data-network-backbone-for-global-warfighter-conne"
}
NASA's push toward commercial space communications gains momentum
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-nasa-relay",
"record_type": "action",
"body": "NASA",
"parent_body": "",
"what": "NASA's push toward commercial space communications gains momentum",
"step_type": "official_program_status",
"date": "2025-12-17",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Reports demonstrations by SpaceX, Viasat, SES and Telesat planning; demonstrations and validation are not equivalent to NASA purchase or acceptance of an operational service.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-spacex-001(supporting,CONFIRMED), w4-comm-viasat-002(supporting,CONFIRMED), w4-comm-viasat-002(contrary,CONFIRMED), w4-comm-telesat-007(supporting,CONFIRMED), w4-comm-telesat-007(contrary,CONFIRMED), w4-comm-ses-008(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.nasa.gov/technology/space-comms/nasas-push-toward-commercial-space-communications-gains-momentum/"
}
Contracts for April 4, 2025
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-spacex-entity",
"record_type": "action",
"body": "U.S. Department of Defense",
"parent_body": "",
"what": "Contracts for April 4, 2025",
"step_type": "official_contract_release",
"date": "2025-04-04",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Corroborates the exact legal entity Space Exploration Technologies Corp. in a separate launch award; it is not the Space Data Network instrument.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-spacex-001(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.defense.gov/News/Contracts/Contract/Article/4146543/"
}
U.S. Space Force advances satellite communications modernization, awards contracts
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-ptsg-production",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "U.S. Space Force advances satellite communications modernization, awards contracts",
"step_type": "official_award_release",
"date": "2026-06-09",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names firm-fixed-price Swarm 1 production contracts to Viasat Inc. and Intelsat General Communications LLC; manufacture, integration, launch and checkout remain ahead, so the release does not establish fielded operation.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-viasat-002(supporting,CONFIRMED), w4-comm-viasat-002(contrary,CONFIRMED), w4-comm-intelsat-003(supporting,CONFIRMED), w4-comm-intelsat-003(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4512873/us-space-force-advances-satellite-communications-modernization-awards-contracts"
}
NASA selects four commercial companies to support Near Space Network
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-nsn",
"record_type": "action",
"body": "NASA",
"parent_body": "",
"what": "NASA selects four commercial companies to support Near Space Network",
"step_type": "official_task_order_release",
"date": "2024-12-20",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names Viasat for a direct-to-Earth task-order subcategory; the release does not document completed service acceptance or performance.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-viasat-002(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.nasa.gov/news-release/nasa-selects-four-commercial-companies-to-support-near-space-network/"
}
SES subsidiary list
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-ses-entities",
"record_type": "action",
"body": "U.S. Securities and Exchange Commission",
"parent_body": "",
"what": "SES subsidiary list",
"step_type": "sec_filing",
"date": "",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Corroborates the legal entities Intelsat General Communications LLC and SES Space & Defense, Inc.; it is not an acquisition or technical-performance record.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-intelsat-003(supporting,CONFIRMED), w4-comm-ses-008(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.sec.gov/Archives/edgar/data/1347408/000119312526138166/d33769dex81.htm"
}
Space Systems Command awards Enhanced Protected Tactical SATCOM-Prototype contract
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-ptsp",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "Space Systems Command awards Enhanced Protected Tactical SATCOM-Prototype contract",
"step_type": "official_award_release",
"date": "2026-05-15",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names a $398 million Enhanced PTS-P development and build contract to Northrop Grumman with launch no earlier than FY2030; no launched satellite or operational acceptance is established.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-northrop-004(supporting,CONFIRMED), w4-comm-northrop-004(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/DesktopModules/ArticleCS/Print.aspx?Article=4493753&ModuleId=560&PortalId=3"
}
Space Systems Command continues to transform acquisition of SATCOM capabilities
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-ptsg-design",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "Space Systems Command continues to transform acquisition of SATCOM capabilities",
"step_type": "official_delivery_order_release",
"date": "2025-07-29",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names PTS-G design delivery orders to Viasat, Northrop Grumman Systems Corporation, Astranis, Intelsat General and Boeing; a design order is not a production selection, and only Viasat and Intelsat later received Swarm 1 production awards.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-intelsat-003(supporting,CONFIRMED), w4-comm-northrop-004(supporting,CONFIRMED), w4-comm-northrop-004(contrary,CONFIRMED), w4-comm-boeing-005(supporting,CONFIRMED), w4-comm-boeing-005(contrary,CONFIRMED), w4-comm-astranis-006(supporting,CONFIRMED), w4-comm-astranis-006(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4259032/space-systems-command-continues-to-transform-acquisition-of-satcom-capabilities"
}
Space Systems Command awards $2.8B contract to deliver the first two satellites for Evolved Strategic SATCOM
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-ess-boeing",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "Space Systems Command awards $2.8B contract to deliver the first two satellites for Evolved Strategic SATCOM",
"step_type": "official_award_release",
"date": "2025-07-03",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names The Boeing Company for two ESS satellites and options; the satellites have not yet been delivered or accepted.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-boeing-005(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article/4235257/space-systems-command-awards-28b-contract-to-deliver-the-first-two-satellites-f"
}
Space Force extends MUOS constellation to support worldwide tactical communications
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-muos-boeing",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "Space Force extends MUOS constellation to support worldwide tactical communications",
"step_type": "official_award_release",
"date": "2026-06-24",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Names a $2.0 billion award to The Boeing Company for MUOS SV-6 and SV-7 with launch no earlier than 2031 and 2032; it is procurement, not deployment.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-boeing-005(supporting,CONFIRMED), w4-comm-boeing-005(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4525473/space-force-extends-muos-constellation-to-support-worldwide-tactical-communicat"
}
Astranis STRATFI announcement
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_4_COMMUNICATIONS_DIRECTED_ENERGY_CYBER_REGISTRY_2026-08-18.json#sources",
"record_id": "w4-src-comm-astranis-stratfi",
"record_type": "action",
"body": "U.S. Space Force, Space Systems Command",
"parent_body": "",
"what": "Astranis STRATFI announcement",
"step_type": "official_award_release",
"date": "2024-09-19",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Supports military Ka-band and Protected Tactical Waveform-compatible hardware development and ground demonstration; it does not establish a deployed or operational satellite.",
"codex_grade": "",
"codex_reason": "cited by edges: w4-comm-astranis-006(supporting,CONFIRMED), w4-comm-astranis-006(contrary,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.ssc.spaceforce.mil/Portals/3/Astranis%20STRATFI%20SSC%20FINAL.pdf"
}