31,545 research records. 15 records referring to separate-lane material are withheld from this public copy. The full original is preserved privately. Record dates and qualifications are unchanged; this is not a new factual review.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#sources",
"record_id": "w2-src-qtime",
"record_type": "action",
"body": "America Makes / NCDMM",
"parent_body": "",
"what": "QTIME additive-manufacturing inspection winners",
"step_type": "official_institute_selection",
"date": "2026-02-10",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Award lead status does not establish completed NDI qualification.",
"codex_grade": "",
"codex_reason": "cited by edges: w2-mfg-honeywell-042(supporting,CONFIRMED), w2-mfg-northrop-043(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/"
}
SMART USA funding opportunity terminated
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#sources",
"record_id": "w2-src-smart-closed",
"record_type": "action",
"body": "National Institute of Standards and Technology",
"parent_body": "",
"what": "SMART USA funding opportunity terminated",
"step_type": "official_termination_notice",
"date": "2026-08-18",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "The institute's prior solicitation and roster are historical, not a live acquisition path.",
"codex_grade": "",
"codex_reason": "",
"written_up_in": "",
"source_url": "https://www.nist.gov/chips/r%2526d-funding-opportunities/notice-funding-opportunity-chips-manufacturing-usa-institute"
}
transformer and voltage-regulation manufacturer — 48C manufacturing allocation and FITT transformer program — anticipated instrument: tax-credit allocation plus selected field demonstration
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-eaton-001",
"record_type": "body",
"body": "Eaton Corporation",
"parent_body": "DOE Office of Electricity / Treasury",
"what": "transformer and voltage-regulation manufacturer — 48C manufacturing allocation and FITT transformer program — anticipated instrument: tax-credit allocation plus selected field demonstration",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_factory_and_selected_field_project",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Public utility field acceptance and named federal or AI-site customer. | boundary: Production and first shipment are confirmed; no named federal-campus delivery or accepted FITT deployment is public.",
"written_up_in": "",
"source_url": ""
}
grid-control equipment developer — MAKE IT, GRIP and installation demonstration lanes — anticipated instrument: prize award, selected GRIP project and planned DoD demonstration
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-switched-005",
"record_type": "body",
"body": "Switched Source, LLC",
"parent_body": "DOE / DoD",
"what": "grid-control equipment developer — MAKE IT, GRIP and installation demonstration lanes — anticipated instrument: prize award, selected GRIP project and planned DoD demonstration",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "prize_winner_and_selected_field_path",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Executed GRIP award and commissioned DoD or utility deployment. | boundary: Multiple federal paths are confirmed, but GRIP remains selected and field acceptance is open.",
"written_up_in": "",
"source_url": ""
}
HVDC project owner and developer — Transmission Facilitation Program — anticipated instrument: selected capacity-contract project
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-southernspirit-006",
"record_type": "body",
"body": "Southern Spirit Transmission, LLC",
"parent_body": "DOE Office of Electricity",
"what": "HVDC project owner and developer — Transmission Facilitation Program — anticipated instrument: selected capacity-contract project",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "selected_capacity_contract",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=3; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Executed capacity contract, permits, finance and named converter/cable suppliers. | boundary: Project-owner selection is confirmed; construction and suppliers are not.",
"written_up_in": "",
"source_url": ""
}
advanced-reactor developer and integrator — Advanced Reactor Demonstration Program and Natrium licensing — anticipated instrument: cost-share agreement plus issued construction permit
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-terrapower-007",
"record_type": "body",
"body": "TerraPower, LLC",
"parent_body": "DOE Office of Clean Energy Demonstrations / NRC",
"what": "advanced-reactor developer and integrator — Advanced Reactor Demonstration Program and Natrium licensing — anticipated instrument: cost-share agreement plus issued construction permit",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "construction_permit_issued",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Operating license, HALEU fuel, commissioning and synchronization. | boundary: Construction authorization is confirmed; operation, fuel and generation are not.",
"written_up_in": "",
"source_url": ""
}
reactor developer and fuel-platform integrator — ARDP and 48C TX-1 project — anticipated instrument: cost-share award and manufacturing tax-credit allocation
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-xenergy-008",
"record_type": "body",
"body": "X Energy, LLC",
"parent_body": "DOE / NRC",
"what": "reactor developer and fuel-platform integrator — ARDP and 48C TX-1 project — anticipated instrument: cost-share award and manufacturing tax-credit allocation",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_ardp_and_fuel_factory_build",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: TX-1 regulatory approval, qualified output and Seadrift permit. | boundary: Federal support and construction activity are confirmed; licensed commercial fuel and reactor permits are not.",
"written_up_in": "",
"source_url": ""
}
test-reactor developer and operator — advanced-reactor support and non-power reactor licensing — anticipated instrument: federal support plus issued construction permits
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-kairos-009",
"record_type": "body",
"body": "Kairos Power LLC",
"parent_body": "DOE / NRC",
"what": "test-reactor developer and operator — advanced-reactor support and non-power reactor licensing — anticipated instrument: federal support plus issued construction permits",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "test_reactors_under_construction",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Operating license and initial fuel/criticality. | boundary: Construction is confirmed; operating authorization, fuel loading and criticality are not.",
"written_up_in": "",
"source_url": ""
}
SMR deployment lead — Gen III+ SMR Tier 1 selection — anticipated instrument: selected cost-shared deployment project
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-holtec-010",
"record_type": "body",
"body": "Holtec Government Services, LLC",
"parent_body": "DOE Office of Nuclear Energy",
"what": "SMR deployment lead — Gen III+ SMR Tier 1 selection — anticipated instrument: selected cost-shared deployment project",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "selected_for_smr_funding",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Executed award, NRC authorization and financing. | boundary: Selection for up to $400 million is confirmed; award execution, permit and construction are not.",
"written_up_in": "",
"source_url": ""
}
SMR design-platform supplier — Gen III+ TVA selection and Clinch River review — anticipated instrument: selected demonstration program plus docketed license review
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-gehitachi-011",
"record_type": "body",
"body": "GE-Hitachi Nuclear Energy Americas LLC",
"parent_body": "DOE / TVA / NRC",
"what": "SMR design-platform supplier — Gen III+ TVA selection and Clinch River review — anticipated instrument: selected demonstration program plus docketed license review",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "design_selected_and_license_review_open",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Construction permit and TVA equipment orders. | boundary: Platform position and license review are confirmed; permit, procurement and construction are not.",
"written_up_in": "",
"source_url": ""
}
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-bwxt-012",
"record_type": "body",
"body": "BWXT Nuclear Energy, Inc.",
"parent_body": "DOE Office of Nuclear Energy",
"what": "nuclear-component manufacturer — Gen III+ supply-chain Tier 2 — anticipated instrument: selected cost-shared equipment procurement",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "selected_supply_chain_project",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Installed qualified line and named SMR order. | boundary: Selection is confirmed; installed equipment, nuclear QA qualification and customer order are not.",
"written_up_in": "",
"source_url": ""
}
fusion-facility owner and research performer — ST40 tripartite partnership — anticipated instrument: named five-year public-private partnership
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-tokamak-013",
"record_type": "body",
"body": "Tokamak Energy Ltd.",
"parent_body": "DOE Office of Science / UK DESNZ",
"what": "fusion-facility owner and research performer — ST40 tripartite partnership — anticipated instrument: named five-year public-private partnership",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "named_fusion_facility_partnership",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Operational upgrade and validated research outputs. | boundary: The partnership and existing ST40 facility are confirmed; upgrade completion and later outputs are not.",
"written_up_in": "",
"source_url": ""
}
stellarator and HTS-magnet developer — Milestone-Based Fusion Development Program — anticipated instrument: executed milestone agreement with verified early result
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-energy-thea-014",
"record_type": "body",
"body": "Thea Energy Inc.",
"parent_body": "DOE Office of Fusion Energy Sciences",
"what": "stellarator and HTS-magnet developer — Milestone-Based Fusion Development Program — anticipated instrument: executed milestone agreement with verified early result",
"step_type": "Energy systems, grid and nuclear infrastructure",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "milestone_program_verified_result",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Integrated Eos experiment and next verified milestone. | boundary: DOE-verified progress is real; an integrated fusion experiment or power plant is not.",
"written_up_in": "",
"source_url": ""
}
integrated rare-earth and magnet platform — MP public-private partnership and 10X support — anticipated instrument: loan, equity, price support and demand commitment
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-mp-015",
"record_type": "body",
"body": "MP Materials Corp.",
"parent_body": "Department of War / OSC",
"what": "integrated rare-earth and magnet platform — MP public-private partnership and 10X support — anticipated instrument: loan, equity, price support and demand commitment",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_upstream_and_magnet_startup",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Customer qualification, recurring shipment and 10X construction milestones. | boundary: Federal platform support and early manufacture are confirmed; full commercial magnet output and 10X commissioning are not.",
"written_up_in": "",
"source_url": ""
}
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-noveon-016",
"record_type": "body",
"body": "Noveon Magnetics, Inc.",
"parent_body": "Department of War / DLA",
"what": "commercial magnet manufacturer — five-year magnet-block contract — anticipated instrument: firm-fixed-price delivery order",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "direct_dla_delivery_order",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Delivery acceptance, option exercise and verified run rate. | boundary: The direct order and prior commercial shipments are confirmed; sustained annual output is not.",
"written_up_in": "",
"source_url": ""
}
commercial magnet manufacturer — DPA manufacturing award and sole-source delivery order — anticipated instrument: award plus firm-fixed-price delivery order
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-evac-017",
"record_type": "body",
"body": "eVAC Magnetics LLC",
"parent_body": "Department of War / DLA",
"what": "commercial magnet manufacturer — DPA manufacturing award and sole-source delivery order — anticipated instrument: award plus firm-fixed-price delivery order",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "direct_dla_delivery_order",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Order completion, recurring orders and sustained output. | boundary: First shipment and DLA order are confirmed; claimed 2,000-tonne run rate is not independently established.",
"written_up_in": "",
"source_url": ""
}
integrated rare-earth platform developer — definitive USA Rare Earth agreement — anticipated instrument: final incentives agreement and senior loan commitment
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-usar-018",
"record_type": "body",
"body": "USA Rare Earth, Inc.",
"parent_body": "Commerce CHIPS Program",
"what": "integrated rare-earth platform developer — definitive USA Rare Earth agreement — anticipated instrument: final incentives agreement and senior loan commitment",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "final_federal_agreement_and_commissioning",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Named customer shipment and verified run rate, then site construction. | boundary: Final agreement and Stillwater commissioning are confirmed; run rate, Blacksburg and Round Top production are not.",
"written_up_in": "",
"source_url": ""
}
rare-earth oxide producer and HREE plant developer — conditional finance and operating White Mesa platform — anticipated instrument: conditional loan plus company-funded construction
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-energyfuels-019",
"record_type": "body",
"body": "Energy Fuels Inc.",
"parent_body": "Department of War / OSC",
"what": "rare-earth oxide producer and HREE plant developer — conditional finance and operating White Mesa platform — anticipated instrument: conditional loan plus company-funded construction",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_ndpr_and_hree_construction",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=B; fit_grade=4; path_grade=3; visual_band=acquisition_near",
"codex_reason": "missing_gate: Commissioning, saleable HREE shipment and named domestic customer. | boundary: Live NdPr capability and HREE construction are real; commercial Dy/Tb and downstream metal/magnet conversion are not.",
"written_up_in": "",
"source_url": ""
}
chromatographic refining and recycling platform — Industrial Base Fund expansion investment — anticipated instrument: direct federal investment
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-reelement-020",
"record_type": "body",
"body": "ReElement Technologies Corp.",
"parent_body": "Department of War Economic Defense Unit",
"what": "chromatographic refining and recycling platform — Industrial Base Fund expansion investment — anticipated instrument: direct federal investment",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "federal_capacity_expansion_investment",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Equipment installation and customer-qualified shipments. | boundary: The expansion investment is confirmed; installed capacity, economics and qualified output are not.",
"written_up_in": "",
"source_url": ""
}
active-anode-material facility operator — Vidalia direct loan — anticipated instrument: closed federal loan
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-syrah-021",
"record_type": "body",
"body": "Syrah Technologies LLC",
"parent_body": "DOE Energy Dominance Financing",
"what": "active-anode-material facility operator — Vidalia direct loan — anticipated instrument: closed federal loan",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_federally_financed_facility",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Customer acceptance and recurring commercial volumes. | boundary: The facility and loan are confirmed; recurring customer-qualified sales and U.S.-mined feed are not.",
"written_up_in": "",
"source_url": ""
}
lithium project owner and plant developer — Thacker Pass ATVM loan — anticipated instrument: closed federal loan and major construction
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-thacker-022",
"record_type": "body",
"body": "Lithium Nevada Corp.",
"parent_body": "DOE Energy Dominance Financing",
"what": "lithium project owner and plant developer — Thacker Pass ATVM loan — anticipated instrument: closed federal loan and major construction",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "closed_loan_and_major_construction",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Mechanical completion, commissioning and customer qualification. | boundary: Finance and construction are confirmed; production and battery-grade qualification are not.",
"written_up_in": "",
"source_url": ""
}
germanium refiner — germanium capacity-expansion award — anticipated instrument: direct investment agreement
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-5n-023",
"record_type": "body",
"body": "5N Plus Inc.",
"parent_body": "Department of War / DPA Title III",
"what": "germanium refiner — germanium capacity-expansion award — anticipated instrument: direct investment agreement",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "dpa_capacity_expansion_award",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Equipment commissioning and qualified shipments. | boundary: The expansion award and incumbent capability are confirmed; sevenfold commissioned capacity is not.",
"written_up_in": "",
"source_url": ""
}
crystal and IR-optics manufacturer — optics production expansion — anticipated instrument: direct investment agreement
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-lattice-024",
"record_type": "body",
"body": "Lattice Materials LLC",
"parent_body": "Department of War / DPA Title III",
"what": "crystal and IR-optics manufacturer — optics production expansion — anticipated instrument: direct investment agreement",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "dpa_component_expansion_award",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Commissioned equipment and accepted components. | boundary: The award and incumbent component capability are confirmed; new qualified output is not.",
"written_up_in": "",
"source_url": ""
}
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-elementus-025",
"record_type": "body",
"body": "ElementUS Minerals, LLC",
"parent_body": "Department of War / DPA Title III",
"what": "gallium demonstration-plant developer — domestic gallium demonstration project — anticipated instrument: demonstration award",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "federal_demonstration_award",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Commissioned demo, verified yield/purity and named buyer. | boundary: The demonstration award is confirmed; commercial-scale gallium production is not.",
"written_up_in": "",
"source_url": ""
}
integrated critical-mineral refiner — Project Crucible — anticipated instrument: final direct-funding award
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-crucible-026",
"record_type": "body",
"body": "Crucible Metals, LLC",
"parent_body": "Commerce CHIPS Program",
"what": "integrated critical-mineral refiner — Project Crucible — anticipated instrument: final direct-funding award",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "final_chips_award_future_platform",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Construction mobilization and phased line commissioning. | boundary: Final funding is confirmed; the multi-billion-dollar facility is not built or commissioned.",
"written_up_in": "",
"source_url": ""
}
antimony refiner and emerging domestic-feed producer — milestone expansion award and sales contracts — anticipated instrument: milestone award plus direct sales contracts
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-antimony-027",
"record_type": "body",
"body": "United States Antimony Corporation",
"parent_body": "Department of War / DPA Title III / DLA",
"what": "antimony refiner and emerging domestic-feed producer — milestone expansion award and sales contracts — anticipated instrument: milestone award plus direct sales contracts",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_refinery_and_dpa_expansion",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Verified domestic concentrate throughput and DLA deliveries. | boundary: Existing refining and the expansion award are confirmed; sustained domestic-mine feed is not.",
"written_up_in": "",
"source_url": ""
}
HALEU enrichment operator — HALEU Availability Program — anticipated instrument: IDIQ task order and definitive expansion contract
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-centrus-028",
"record_type": "body",
"body": "American Centrifuge Operating, LLC",
"parent_body": "DOE Office of Nuclear Energy",
"what": "HALEU enrichment operator — HALEU Availability Program — anticipated instrument: IDIQ task order and definitive expansion contract",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "operating_demo_and_expansion_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: New cascade installation, NRC authorization and commercial delivery. | boundary: Demonstration production and federal expansion contract are confirmed; commercial scale is not.",
"written_up_in": "",
"source_url": ""
}
future HALEU enrichment developer — HALEU Availability Program — anticipated instrument: large federal task order and site lease
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mat-generalmatter-029",
"record_type": "body",
"body": "General Matter, Inc.",
"parent_body": "DOE Office of Nuclear Energy",
"what": "future HALEU enrichment developer — HALEU Availability Program — anticipated instrument: large federal task order and site lease",
"step_type": "Critical materials and component supply chains",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "federal_task_order_prelicense",
"codex_grade": "forecast_label=STRONG INFERENCE; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=acquisition_near",
"codex_reason": "missing_gate: Accepted NRC application, EPC and first cascade installation. | boundary: The federal path and site preparation are confirmed; license, plant and production do not exist yet.",
"written_up_in": "",
"source_url": ""
}
qualification prime and aerospace integrator — GOTHAAM project call — anticipated instrument: selected $5.5 million project
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-gaasi-030",
"record_type": "body",
"body": "General Atomics Aeronautical Systems, Inc.",
"parent_body": "OSW ManTech / America Makes",
"what": "qualification prime and aerospace integrator — GOTHAAM project call — anticipated instrument: selected $5.5 million project",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "official_project_winner",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Project abstract, allowables, qualification plan and accepted output. | boundary: GA-ASI's winner role is confirmed; named partner workshare and qualified production are not.",
"written_up_in": "",
"source_url": ""
}
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-divergent-033",
"record_type": "body",
"body": "Divergent Technologies, Inc.",
"parent_body": "OSW ManTech / America Makes",
"what": "integrated additive-factory performer — JAQS-SQ — anticipated instrument: official selected project",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "official_qualification_project_winner",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted controls and production transition. | boundary: Selection is confirmed; workshare and government supplier approval are not.",
"written_up_in": "",
"source_url": ""
}
airframe additive-manufacturing performer — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB017
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-gkn-034",
"record_type": "body",
"body": "GKN Aerospace GTC, LLC",
"parent_body": "Air Force Research Laboratory",
"what": "airframe additive-manufacturing performer — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB017",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted contract milestones and airframe transition. | boundary: The $8.39 million contract is confirmed in a dated portfolio; delivered qualified structures are not.",
"written_up_in": "",
"source_url": ""
}
robotic inspection and correction integrator — canopy inspection contract and ARM 25-01 selection — anticipated instrument: direct contract plus selected institute team
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-graymatter-035",
"record_type": "body",
"body": "GrayMatter Robotics Inc.",
"parent_body": "Air Force Research Laboratory / ARM Institute",
"what": "robotic inspection and correction integrator — canopy inspection contract and ARM 25-01 selection — anticipated instrument: direct contract plus selected institute team",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_contract_and_selected_team",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted inspection performance and transition user. | boundary: The AFRL contract and selected ARM team are confirmed; final ARM workshare and production adoption are not.",
"written_up_in": "",
"source_url": ""
}
factory-automation and process-planning performer — Agile Factory Floor and autonomous planning efforts — anticipated instrument: active direct R&D contracts
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-titan-036",
"record_type": "body",
"body": "Titan Robotics, Inc.",
"parent_body": "Air Force Research Laboratory",
"what": "factory-automation and process-planning performer — Agile Factory Floor and autonomous planning efforts — anticipated instrument: active direct R&D contracts",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_contracts",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Completion evidence and transition to an operating factory. | boundary: Active contracts are confirmed from the portfolio; accepted deployment is not.",
"written_up_in": "",
"source_url": ""
}
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-sedaro-037",
"record_type": "body",
"body": "Sedaro Corp.",
"parent_body": "Air Force Test Center / AFRL",
"what": "cloud-native propulsion digital-twin platform — Rocket Propulsion digital-twin IDIQ — anticipated instrument: competitive IDIQ FA9300-25-D-6000",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_idiq_vehicle",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Task orders, obligations and accepted operational use. | boundary: The $20 million ceiling vehicle is confirmed; ceiling value is not revenue and task-order scale is open.",
"written_up_in": "",
"source_url": ""
}
composite-process sensing and simulation specialist — AFRL cure-management contract and HiCAM consortium — anticipated instrument: direct R&D contract plus transition consortium
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-convergent-038",
"record_type": "body",
"body": "Convergent Manufacturing Technologies US Inc.",
"parent_body": "Air Force Research Laboratory / NASA",
"what": "composite-process sensing and simulation specialist — AFRL cure-management contract and HiCAM consortium — anticipated instrument: direct R&D contract plus transition consortium",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_contract_and_transition_ecosystem",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted cure-control result and qualified manufacturing process. | boundary: The contract and consortium position are confirmed; airworthiness acceptance and production adoption are not.",
"written_up_in": "",
"source_url": ""
}
composite-aerostructure manufacturer — bonded-unitized-composites contract and HiCAM — anticipated instrument: direct R&D contract plus transition consortium
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-spirit-039",
"record_type": "body",
"body": "Spirit AeroSystems, Inc.",
"parent_body": "Air Force Research Laboratory / NASA",
"what": "composite-aerostructure manufacturer — bonded-unitized-composites contract and HiCAM — anticipated instrument: direct R&D contract plus transition consortium",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_contract_and_hicam_member",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted structural demonstration and production decision. | boundary: The $23.81 million contract and HiCAM position are confirmed; qualified production adoption is not.",
"written_up_in": "",
"source_url": ""
}
NDE and structural-integrity specialist — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB032
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-hill-040",
"record_type": "body",
"body": "Hill Engineering, LLC",
"parent_body": "Air Force Research Laboratory",
"what": "NDE and structural-integrity specialist — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB032",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Validated method and transition into maintenance or production. | boundary: The contract is confirmed; accepted inspection method and fleet adoption are not.",
"written_up_in": "",
"source_url": ""
}
materials-characterization software specialist — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB033
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-bluequartz-041",
"record_type": "body",
"body": "BlueQuartz Software, LLC",
"parent_body": "Air Force Research Laboratory",
"what": "materials-characterization software specialist — Materials and Manufacturing Directorate contract — anticipated instrument: direct R&D contract FA239425CB033",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "active_afrl_contract",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=3; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Validated reliability and program use. | boundary: The contract is confirmed; certification authority acceptance and broader deployment are not.",
"written_up_in": "",
"source_url": ""
}
additive NDI project lead — QTIME project call — anticipated instrument: official award-lead selection
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-honeywell-042",
"record_type": "body",
"body": "Honeywell International Inc.",
"parent_body": "OSW ManTech / America Makes",
"what": "additive NDI project lead — QTIME project call — anticipated instrument: official award-lead selection",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "official_qtime_award_lead",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted inspection system and transition to DoD, FAA or NASA use. | boundary: Award-lead status is confirmed; completed rapid NDI qualification is not.",
"written_up_in": "",
"source_url": ""
}
additive NDI project lead and end-user integrator — QTIME project call — anticipated instrument: official award-lead selection
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json#edges",
"record_id": "w2-mfg-northrop-043",
"record_type": "body",
"body": "Northrop Grumman Systems Corporation",
"parent_body": "OSW ManTech / America Makes",
"what": "additive NDI project lead and end-user integrator — QTIME project call — anticipated instrument: official award-lead selection",
"step_type": "Advanced manufacturing and industrial qualification",
"date": "",
"date_kind": "",
"other_dates": "as_of=2026-08-18; next_recheck=2026-10-31; expiry=2027-02-18",
"stage_or_status": "official_qtime_award_lead",
"codex_grade": "forecast_label=CONFIRMED; evidence_grade=A; fit_grade=4; path_grade=4; visual_band=confirmed",
"codex_reason": "missing_gate: Accepted inspection system and program transition. | boundary: Award-lead status is confirmed; completed rapid NDI qualification is not.",
"written_up_in": "",
"source_url": ""
}
HHS grants and procurement policy incorporating nucleic-acid screening
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
"record_id": "w3-src-hhs-screen",
"record_type": "action",
"body": "U.S. Department of Health and Human Services",
"parent_body": "",
"what": "HHS grants and procurement policy incorporating nucleic-acid screening",
"step_type": "official_procurement_rule",
"date": "2025-04-26",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "The rule creates an eligibility gate; it does not independently certify each provider or award a contract.",
"codex_grade": "",
"codex_reason": "cited by edges: w3-bio-twist-001(supporting,STRONG INFERENCE), w3-bio-idt-002(supporting,STRONG INFERENCE)",
"written_up_in": "",
"source_url": "https://www.hhs.gov/grants-contracts/grants/grants-policies-regulations/grants-policy-statement/index.html"
}
Biosecurity for synthetic nucleic-acid sequences
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
"record_id": "w3-src-nist-biosecurity",
"record_type": "action",
"body": "National Institute of Standards and Technology",
"parent_body": "",
"what": "Biosecurity for synthetic nucleic-acid sequences",
"step_type": "official_benchmark_program",
"date": "2026-05-22",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Benchmark work and framework transition do not establish a published company pass.",
"codex_grade": "",
"codex_reason": "cited by edges: w3-bio-twist-001(supporting,STRONG INFERENCE), w3-bio-idt-002(supporting,STRONG INFERENCE)",
"written_up_in": "",
"source_url": "https://www.nist.gov/programs-projects/biosecurity-synthetic-nucleic-acid-sequences"
}
Reimagining Protein Manufacturing performers
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
"record_id": "w3-src-darpa-rpm",
"record_type": "action",
"body": "DARPA",
"parent_body": "",
"what": "Reimagining Protein Manufacturing performers",
"step_type": "official_program_award",
"date": "2023-02-15",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Named performer status does not prove independent metric passage or transition.",
"codex_grade": "",
"codex_reason": "cited by edges: w3-bio-ginkgo-rpm-003(supporting,CONFIRMED)",
"written_up_in": "",
"source_url": "https://www.darpa.mil/news/2023/protein-based-therapeutics"
}
Traveler-based genomic surveillance performance record
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_3_BIOTECH_QUANTUM_SPACE_REGISTRY_2026-08-18.json#sources",
"record_id": "w3-src-cdc-tgs",
"record_type": "action",
"body": "Centers for Disease Control and Prevention",
"parent_body": "",
"what": "Traveler-based genomic surveillance performance record",
"step_type": "official_operating_evaluation",
"date": "2025-07-01",
"date_kind": "source date (as listed)",
"other_dates": "",
"stage_or_status": "Historical deployed network and performance do not establish a current FY2026 contract.",
"codex_grade": "",
"codex_reason": "cited by edges: w3-bio-ginkgo-surv-004(supporting,SUPPORTED INFERENCE)",
"written_up_in": "",
"source_url": "https://wwwnc.cdc.gov/eid/article/31/13/24-1407_article"
}