How oil, gas, offshore energy and mineral projects are authorized, how the revenue is collected, and how fuel supply is held and released in an emergency

This system covers the federal permissions that let oil, gas, offshore energy and mineral projects go ahead, the money the government collects from them, and the stores and emergency powers it uses when fuel supply is short. The Department of the Interior leases federal land and offshore waters and approves drilling; its Office of Natural Resources Revenue collects royalties, rents and bonuses and pays them out to the Treasury, states, Tribes and funds. The Federal Energy Regulatory Commission, an independent commission, certificates interstate gas pipelines and authorizes LNG terminals; the Department of Energy separately authorizes gas exports and imports, runs the Strategic Petroleum Reserve and the Northeast Home Heating Oil Reserve, and funds projects under the Defense Production Act; the Maritime Administration licenses deepwater ports; the Pipeline and Hazardous Materials Safety Administration sets and enforces pipeline safety rules; and the Environmental Protection Agency can waive fuel rules for up to 20 days at a time in an emergency. Each of these permissions is its own step with its own record, and the files keep a permission apart from what is later built, shipped, delivered or paid.

The structure

Stages and functions

  1. 1Who holds which power
  2. 2Leasing federal land and offshore waters
  3. 3Rules for drilling and permits to drill
  4. 4Collecting and paying out royalties, rents and bonuses
  5. 5Interstate gas pipelines: the FERC certificate
  6. 6LNG terminals and gas exports: two separate federal permissions
  7. 7Deepwater ports: the MARAD licence
  8. 8Cross-border pipelines: the presidential border permit
  9. 9Pipeline safety
  10. 10Stopping or suspending a project, and court review
  11. 11Defense Production Act route for energy projects
  12. 12Emergency fuel waivers
  13. 13Emergency reserves: Strategic Petroleum Reserve and Northeast Home Heating Oil Reserve
  14. 14International coordination of stock releases
  15. 15Shipping-lane risk and payment rules for oil moving by sea
  16. 16How the offshore bureaus are organized
Who holds which power
N
1
Stage
Who holds which power
What happens
No single body runs this system. Each permission sits with a different holder under a different statute, and the files keep them apart: Interior (through BLM, and offshore through BOEM and BSEE, now the Marine Minerals Administration) leases and permits; FERC certificates pipelines and authorizes LNG terminals under the Natural Gas Act; DOE authorizes gas exports and imports and runs the petroleum reserves; MARAD licenses deepwater ports; PHMSA regulates pipeline safety; EPA can waive fuel rules for short periods; the President makes Defense Production Act determinations and decides who holds the Act's energy powers. A national energy emergency, a Defense Production Act determination and other emergency declarations are separate legal acts with separate steps.
Who
Congress; the President; Interior and its bureaus; FERC; DOE; MARAD; PHMSA; EPA.
Under what
As the files cite them: Natural Gas Act sections 3 and 7; Mineral Leasing Act section 35(d) (permit fee); Clean Air Act section 211(c)(4)(C) (fuel waivers); Defense Production Act sections 101 and 303; National Emergencies Act (EO 14156). The files do not set out the Outer Continental Shelf leasing statute or the Deepwater Port Act's steps; EO 14285 names the Outer Continental Shelf Lands Act and EO 14154 names the Deepwater Port Act.
Record left
The statute; the executive order or determination; the agency's own order, certificate, licence or notice.
How long
Not applicable.
Quotes
  • Quote
    `NEA/IEEPA emergency != DPA determination != Stafford declaration != PHS PHE != Tariff Act §318 emergency`
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Website Sweep 2026-07-25/Justice Homeland Wave 5/JUSTICE_HOMELAND_WAVE_5_PRIMARY_OBJECT_LEDGER.md
  • Quote
    FERC is independent; list it in the energy-policy lane without making it a DOE component.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Strategic Plans/Evidence/LANE_2_GAPS.md
  • Quote
    section 101 supports priorities and allocations.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/lanes/EXECUTIVE_JUSTICE_HOMELAND_ACCOUNTABILITY_DELTA_2026-08-01.md
Points to
  • who-may-do-what-the-law-behind-the-money-system (emergency powers)
Order instructions
  • EO 14156 Sec. 1
  • EO 14213 Secs. 2-4
  • EO 14391
  • EO 14427
Leasing federal land and offshore waters
N
2
Stage
Leasing federal land and offshore waters
What happens
Before oil, gas or coal on federal land can be produced, Interior offers it for lease. Onshore, BLM opens a scoping period on a proposed sale, holds the sale, and collects the proceeds (bonuses and rents); offshore, the leasing and planning function moved from BOEM to the Marine Minerals Administration on July 10, 2026, with BOEM staff keeping authority until told otherwise. The files record scoping notices and the proceeds of one large sale, but do not describe how a sale notice is issued, how bids are opened and accepted, or when a lease is issued. The files record no offshore oil and gas lease sale in 2025-2026.
Who
BLM (onshore); BOEM, now the Marine Minerals Administration (offshore); the Secretary of the Interior (orders such as public land orders).
Under what
The files do not cite the onshore or offshore leasing statutes for a lease sale. EO 14153 and EO 14261 direct changes to Alaska and coal leasing (see the order list).
Record left
Scoping notice; lease-sale proceeds in ONRR's disbursement data (rents and bonuses grouped); public land orders.
How long
Wyoming: scoping closed August 5, 2026 for a sale proposed for December 2026. New Mexico and Oklahoma: scoping in August 2026 for a February 2027 sale.
Branches
  • Name
    Land set aside or conveyed for an energy project
    Text
    A public land order can set the legal state of a parcel for a project. PLO 7969 names a Venture Global affiliate at Calcasieu Pass; the direct sale and LNG hub were still proposed.
    Quote
    Quote
    PLO 7969 is C. The official source names a Venture Global affiliate but does not identify CP2; the direct sale and LNG hub remain proposed.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Full Freshness Sweep 2026-08-22/waves/wave_7_physical_science/interior_environment_sublane/README.md
Quotes
  • Quote
    Scoping is not a sale, lease, permit or production.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
  • Quote
    BLM's two Idaho timber-sale offers and New Mexico/Oklahoma February 2027 oil-and-gas lease scoping: offer/scoping, not award, harvest, lease issuance, drilling, delivery, or production.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md
  • Quote
    Interior identified a May 2026 Bureau of Land Management lease sale in New Mexico and Texas that generated more than $4 billion as a contributor to FY2026 revenues.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Refresh 2026-10-30/ONRR_FY2026_ENERGY_MINERAL_REVENUE_DISBURSEMENTS_2026-11-11.md
Order instructions
  • EO 14153 Sec. 3(b)(i)-(vi), (ix)-(xv)
  • EO 14154 Sec. 9(b)
  • EO 14241 Sec. 5(a)
  • EO 14261 Sec. 5
  • EO 14285 Sec. 3(b)(i)
Rules for drilling and permits to drill
N
3
Stage
Rules for drilling and permits to drill
What happens
After a lease, an operator needs Interior's approval to drill. BLM charges a fee for each application for a permit to drill; Congress extended that fee through fiscal year 2037 on October 20, 2026. Interior also writes the operating rules. In 2026 BSEE and BOEM jointly proposed changes to the Arctic offshore exploratory-drilling rule, and BLM proposed a 60-day permit path for production sites in the National Petroleum Reserve in Alaska. Both were proposals with comment periods; the files record no final rule for either.
Who
BLM; BSEE and BOEM (offshore rules); Congress (fee).
Under what
Mineral Leasing Act section 35(d) as amended by Public Law 119-134 (fee); 30 CFR parts 250 and 550 (Arctic proposal, RIN 1082-AA05).
Record left
Federal Register proposed rule; docket; comment deadline; permit-fee receipts to the Permit Processing Improvement Fund.
How long
Arctic proposal: announced August 3, published August 6, comments to October 5, 2026. NPR-A proposal: published September 8, comments to November 9, 2026.
Quotes
  • Quote
    BLM application-for-permit-to-drill fee authority extended through FY2037; FY2027–37 receipts directed to the Permit Processing Improvement Fund
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/U.S._PETROLEUM_AND_PIPELINE_DPA_CONTROL_DELTA_2026-10-25.md
  • Quote
    proposal publication August 6; OMB information-collection comments September 8; rule comments October 5; final rule/effective date unresolved.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md
  • Quote
    A proposal is not a final rule, lease sale, exploration-plan approval, drilling permit, well spud or production.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
  • Quote
    published 2026-09-08 as 2026-18261 (91 FR 57091); comments through **2026-11-09**
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md
Points to
  • how-a-federal-action-moves-from-agenda-to-effect (path b, agency rules)
Order instructions
  • EO 14153 Sec. 3(b)(ix), (xiii)
  • EO 14270 Sec. 4(a)
Collecting and paying out royalties, rents and bonuses
N
4
Stage
Collecting and paying out royalties, rents and bonuses
What happens
Money owed on federal leases (royalties on production, rents, and bonuses bid at sales) is collected and paid out by the Office of Natural Resources Revenue, which stayed outside the new Marine Minerals Administration. For fiscal year 2026 ONRR recorded $21.8 billion in net disbursements, split among the Treasury, states and localities, Tribes and individual Indian mineral owners, the Reclamation Fund, the Land and Water Conservation Fund, the Historic Preservation Fund and other funds. The disbursement file groups rents and bonuses together and does not tie a lease award to a payment.
Who
ONRR (collects and pays); recipients: U.S. Treasury, 34 states, 33 Tribes and about 31,000 individual Indian mineral owners, and named funds.
Under what
The files do not cite the statute that sets the shares.
Record left
ONRR's annual disbursement portal and export (updated October 21, 2026); Interior's release (October 28, 2026).
How long
Payments run across the fiscal year (October 1 to September 30).
Quotes
  • Quote
    The Office of Natural Resources Revenue kept its independent royalty collection and disbursement role.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Website Sweep 2026-07-25/JULY_SWEEP_OFFSHORE_DEFENSE_AND_EXPORT_AUTHORITY_2026-11-11.md
  • Quote
    The annual disbursement file groups rents and bonuses together and provides no link from an individual lease award to a particular payment.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Refresh 2026-10-30/ONRR_FY2026_ENERGY_MINERAL_REVENUE_DISBURSEMENTS_2026-11-11.md
  • Quote
    These records establish payments to recipient categories.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Refresh 2026-10-30/ONRR_FY2026_ENERGY_MINERAL_REVENUE_DISBURSEMENTS_2026-11-11.md
Points to
  • how-federal-money-moves-from-appropriation-to-payment (collections)
Order instructions
  • EO 14261 Sec. 5(b) (coal royalty-rate reduction applications)
Interstate gas pipelines: the FERC certificate
N
5
Stage
Interstate gas pipelines: the FERC certificate
What happens
A company that wants to build or expand an interstate gas pipeline applies to FERC for a certificate under Natural Gas Act section 7. The Commission votes at a public meeting; the order is posted separately; the certificate authorizes construction, and the pipeline is not in service until a later step. FERC can also amend or vacate a certificate. DOE can fund the pre-permit work on a pipeline under the Defense Production Act (stage 11), but the permit itself is still needed.
Who
FERC (decides); the pipeline company (applies, builds); DOE (may fund pre-permit work).
Under what
Natural Gas Act section 7(b) and 7(c) (as the files cite it).
Record left
Meeting summary; Commission order in a CP docket; later in-service order.
How long
The files give vote dates but not how long applications take.
Quotes
  • Quote
    Pipeline certificates authorize construction, not in-service.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md
  • Quote
    Meeting vote ≠ posted order PDF.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md
  • Quote
    NGA §7(b)/(c) **certificates and abandonments** for Gulf South and Texas Gas
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md
  • Quote
    Those orders create project authority; they do not prove construction, in-service status or gas/LNG throughput.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/U.S._PETROLEUM_AND_PIPELINE_DPA_CONTROL_DELTA_2026-10-25.md
Order instructions
  • EO 14154 Sec. 5(e)
  • EO 14156 Sec. 2(a)
LNG terminals and gas exports: two separate federal permissions
N
6
Stage
LNG terminals and gas exports: two separate federal permissions
What happens
An LNG export project needs two separate federal permissions. FERC authorizes the terminal itself under Natural Gas Act section 3 and sets an in-service deadline. DOE authorizes the export of the gas, with a deadline to start exporting; the files name exports to countries without a free-trade agreement ('non-FTA') as their own category (Gulf LNG's non-FTA deadline; Venture Global CP2's non-FTA application, published August 3, 2026). The two deadlines run separately: for Gulf LNG, DOE moved the export-start deadline to July 31, 2031 while FERC's in-service deadline stayed July 16, 2029. A FERC authorization can be transferred to a new holder. On October 15, 2026 FERC proposed a three-tier blanket-authorization program for LNG; it is a proposal.
Who
FERC (terminal); DOE (export authorization); the project company.
Under what
Natural Gas Act section 3 (FERC terminal authorization, as the files cite it). The files do not cite the statute for DOE's export orders or set out the public-interest test for non-free-trade-agreement exports.
Record left
FERC section 3 order; DOE export order (for example Order 4410-B); Federal Register notice of an application.
How long
Gulf LNG: authorization for up to 558.9 Bcf a year through December 31, 2050.
Branches
  • Name
    Border gas imports and exports by pipeline
    Text
    DOE also authorizes cross-border gas imports and exports for a set term with a volume ceiling (Sempra Order 5450, effective August 1, 2026; Lovat Order 5453, from August 4, 2026).
    Quote
    Quote
    An authorization ceiling is not evidence of physical cross-border flow.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
Quotes
  • Quote
    extends Gulf LNG's non-free-trade-agreement export-commencement deadline from July 31, 2026 to July 31, 2031.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
  • Quote
    FERC's separate in-service deadline remains July 16, 2029.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md
  • Quote
    In April 2025, FERC transferred the Natural Gas Act section 3 authorization to 8 Star Alaska LLC.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/ALASKA_LNG_KOREA_PROJECT_SELECTION_GATE_2026-09-30.md
  • Quote
    It does not itself supply equity, debt, Korean approval, an FID or construction.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/ALASKA_LNG_KOREA_PROJECT_SELECTION_GATE_2026-09-30.md
  • Quote
    The NOPR and draft policy statement are proposals.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/U.S._PETROLEUM_AND_PIPELINE_DPA_CONTROL_DELTA_2026-10-25.md
Order instructions
  • EO 14153 Sec. 3(a)(ii)
  • EO 14154 Sec. 8(a)
Deepwater ports: the MARAD licence
N
7
Stage
Deepwater ports: the MARAD licence
What happens
An offshore port that loads crude or LNG onto tankers needs a deepwater port licence. MARAD decides, DOT publishes, the Coast Guard co-reviews, and EPA issues the air permits separately. The steps the files name are: hearing record, application approval, signed record of decision with conditions, issued licence, then the separate permits, financial close, construction and first cargo.
Who
MARAD (decides); DOT (publishes); U.S. Coast Guard (co-reviews); EPA (air permits); the applicant.
Under what
The files do not cite the statute for Blue Marlin; EO 14154 Sec. 8(c) refers to a 'Deepwater Port Act license' for LNG ports.
Record left
MARAD docket (MARAD-2020-0127 for Blue Marlin); DOT release; EPA draft permit notice; later record of decision and licence.
How long
Blue Marlin: the docket number dates from 2020; application approved November 5, 2026.
Quotes
  • Quote
    MARAD is the permission actor, DOT the parent publisher, Coast Guard a co-reviewer and Blue Marlin Offshore Port LLC the applicant outside the federal tree.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/BLUE_MARLIN_DEEPWATER_PORT_PERMISSION_RETURN_2026-11-06.md
  • Quote
    The agency report establishes application approval.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/BLUE_MARLIN_DEEPWATER_PORT_PERMISSION_RETURN_2026-11-06.md
  • Quote
    the signed decision, license conditions and issued license were unrecovered.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/BLUE_MARLIN_DEEPWATER_PORT_PERMISSION_RETURN_2026-11-06.md
Order instructions
  • EO 14154 Sec. 8(b)-(d)
Cross-border pipelines: the presidential border permit
N
8
Stage
Cross-border pipelines: the presidential border permit
What happens
A pipeline crossing the national border runs under a presidential border permit. The permit can be revoked by executive order: EO 13990 section 6(a) revoked the March 29, 2019 Keystone XL permit, and EO 13990 itself was later revoked by EO 14148 and EO 14154. The files do not record any later Keystone XL permit.
Who
The President.
Under what
The permit and the revoking order (the files do not cite a statute).
Record left
Presidential permit; executive order.
How long
Not given.
Quotes
  • Quote
    EO 13990 section 6(a) revokes the March 29, 2019 presidential border permit.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_5_ENERGY.md
Order instructions
  • EO 14154 Sec. 4(a) (revokes EO 13990)
Pipeline safety
N
9
Stage
Pipeline safety
What happens
PHMSA writes and enforces pipeline safety rules. Its statutory advisory committees, with members from government, industry and the public, assess proposed standards, but PHMSA must answer their advice in a binding rule. PHMSA also issues special permits for named pipelines. A court can move safety oversight under a consent decree to PHMSA, as the Central District of California did for the Sable pipeline on August 19, 2026.
Who
PHMSA; its advisory committees; courts and DOJ where a consent decree applies.
Under what
49 U.S.C. 60115 for the committees (as the files cite it); the files do not cite PHMSA's rule-making statute.
Record left
Committee votes; rules; special permit dockets (PHMSA-2026-0464 for Sable); court orders.
How long
Not given.
Quotes
  • Quote
    Pipeline committees advise on privately authored standards, but PHMSA must answer the advice in a binding rule and remains responsible for enforcement.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Institutional Signals and Thesis Test 2025-2026/FULL_SWEEP_CROSS_INSTITUTIONAL_SYNTHESIS_2026-09-28.md
  • Quote
    substitute PHMSA for the California State Fire Marshal and incorporate applicable state-waiver requirements;
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Full Freshness Sweep 2026-08-22/LEGAL_INSTITUTIONAL_RETURN_REFRESH_2026-10-05.md
  • Quote
    PHMSA separately lists a June 25 special permit under docket PHMSA-2026-0464.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Full Freshness Sweep 2026-08-22/LEGAL_INSTITUTIONAL_RETURN_REFRESH_2026-10-05.md
Stopping or suspending a project, and court review
N
10
Stage
Stopping or suspending a project, and court review
What happens
An agency can stop work it has authorized, and courts can let work resume while a challenge runs. BOEM's December 22, 2025 order suspended work on offshore wind projects; preliminary injunctions on January 12, 2026 (District of Columbia) and January 16, 2026 (Eastern District of Virginia) let Revolution Wind and Coastal Virginia Offshore Wind resume. For Sable, the court held that California bodies could not use legal action to stop operation in compliance with the Defense Production Act order; the files do not record that order's issuer or date. EO 14260 directs the Attorney General to act against state laws that burden domestic energy.
Who
BOEM; DOJ; federal district courts; the Ninth Circuit (Sable appeal); the Attorney General (EO 14260).
Under what
Court orders; the files do not cite the statute BOEM used for the suspension.
Record left
Agency order; court docket and orders.
How long
Offshore wind: about three weeks from suspension to injunction.
Quotes
  • Quote
    The December 22, 2025 BOEM suspension and January 12, 2026 D.C. District Court preliminary injunction are separate legal dates.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/AI-Enabled Turbine Asset Management and US Power Buildout 2025-2026/OFFSHORE_WIND_FIRST_POWER_AND_COMMERCIAL_OPERATION_2026-11-10.md
  • Quote
    Sable was ordered to pay a $1.449 million penalty for violating the decree;
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Full Freshness Sweep 2026-08-22/LEGAL_INSTITUTIONAL_RETURN_REFRESH_2026-10-05.md
Points to
  • how-a-federal-action-moves-from-agenda-to-effect (path f, courts)
Order instructions
  • EO 14260 Sec. 2
Defense Production Act route for energy projects
N
11
Stage
Defense Production Act route for energy projects
What happens
The President finds a kind of energy capacity essential to national defense in a determination under section 303 of the Defense Production Act, which opens a funding route; the President separately decides by executive order which secretaries hold the Act's energy powers. After a determination, an agency selects projects, signs an agreement and obligates money; the project still needs its permits, construction and operation. In 2026: Presidential Determination 2026-12 (April 20) on gas pipelines, processing and storage; a DOE commitment of up to $42 million to the Constitution Pipeline for pre-permit work (October 19-21); Presidential Determination 2026-11 (October 22) on petroleum production, refining and logistics, with DOE planning up to $150 million. EO 14427 (September 8) let Interior and Energy each use the energy powers on their own. The files record no executed agreement for any of these.
Who
The President (determinations, delegations); DOE (funding plans and commitments); the Secretary of War (named in Determination 2026-11); Interior (delegate since EO 14427); the National Energy Dominance Council (disputes).
Under what
Defense Production Act sections 101 (priorities and allocations) and 303 (as the files cite them); EO 13603 as amended by EO 14391 and EO 14427.
Record left
Presidential determination; DOE project page or fact sheet; later agreement and obligation records.
How long
The files give dates only.
Branches
  • Name
    Intent to fund only
    Text
    DOE announced intent to use up to $150 million of DPA funding for Alaska's Beluga-Healy transmission line; the files call this intent, not an award.
    Quote
    Quote
    The announcement identifies a project and public/private financing design but provides no award agreement, obligation, draw, construction notice or energized line.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md
Quotes
  • Quote
    `national-defense determination -> DPA project selection -> agreement and obligation -> permit/certificate -> construction -> operation -> measured flow`
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/U.S._PETROLEUM_AND_PIPELINE_DPA_CONTROL_DELTA_2026-10-25.md
  • Quote
    This is real authority and an announced funding ceiling, not an award, obligation, refinery restart or increased output.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Deep Refresh 2026-10-25/WAVE_10_MERGE.md
  • Quote
    Delegation change is not a DPA Title I/III determination, rated order, allocation, plant, or payment.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_1A_LEGAL_EXECUTIVE_OVERSIGHT.md
  • Quote
    no Interior/DOE DPA implementing order found on energy.gov or doi.gov in-window
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-11/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md
Order instructions
  • EO 14156 Sec. 2(a)
  • EO 14241 Sec. 6(b), 6(d)
  • EO 14391
  • EO 14427
Emergency fuel waivers
N
12
Stage
Emergency fuel waivers
What happens
When fuel supply is disrupted, EPA, in consultation with DOE, can waive a fuel rule for a limited time under Clean Air Act section 211(c)(4)(C). In 2026 the files record a national summer volatility waiver (August 20, lapsed September 15), state 'boutique' gasoline waivers renewed September 8 (Texas through October 1; Arizona and California through October 7), and an Arctic diesel sulfur waiver for Alaska north of the Arctic Circle (September 15 to October 4). Each waiver is its own clock; one does not extend another.
Who
EPA Administrator (issues); DOE (consulted); state governors (addressees of the boutique and Arctic letters).
Under what
Clean Air Act section 211(c)(4)(C) (as the files cite it); 40 CFR 1090.215 and 1090.305.
Record left
Signed waiver letter on EPA's fuel waivers page.
How long
20 days at most per waiver, as the files record it.
Quotes
  • Quote
    effective **2026-09-15 through 2026-10-04** (20-day CAA maximum).
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md
  • Quote
    Federal summer RVP / winter-pull-forward from the Aug 20 national waiver **lapsed Sep 15 as scheduled** — this letter does not extend it.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md
  • Quote
    That is not an extension of the nationwide E15/RVP emergency past Sep 15.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md
Order instructions
  • EO 14156 Sec. 2(b)
Emergency reserves: Strategic Petroleum Reserve and Northeast Home Heating Oil Reserve
N
13
Stage
Emergency reserves: Strategic Petroleum Reserve and Northeast Home Heating Oil Reserve
What happens
DOE holds crude oil in the Strategic Petroleum Reserve and heating oil in the Northeast Home Heating Oil Reserve. In 2026 it released oil by exchange: DOE solicits offers, authorizes or awards exchange contracts, transfers title to oil in the tank, the buyer moves it, and later the company returns the borrowed volume plus a premium (in barrels for the petroleum reserve; valued in dollars, paid by Fedwire, for the heating oil reserve). An award is not a delivery, and a contracted return is not a returned barrel. The files record no sale (as opposed to exchange) from the reserve in 2026.
Who
DOE Office of Petroleum Reserves (solicits, authorizes, awards); exchange companies; EIA (reports stock levels).
Under what
The files do not cite the statute for reserve exchanges; the heating oil RFP is DE-RP96-27PO00002.
Record left
Solicitation; DOE announcement; award sheet; EIA weekly stock table; later title-transfer, delivery and return records.
How long
Heating oil: solicitation October 21, offers due October 27, awards as of November 2, delivery target November 6, 2026. Petroleum reserve: returns from early 2027.
Branches
  • Name
    Exchange tied to earlier awards
    Text
    DOE said ExxonMobil's October 10 exchange speeds up deliveries awarded earlier; the files do not identify those earlier awards.
    Quote
    Quote
    On October 10, DOE authorized emergency exchanges of up to four million barrels from the Strategic Petroleum Reserve: up to two million each for ExxonMobil and BP America.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-10-12/waves/WAVE_4_INDUSTRIAL_ENERGY_LOGISTICS.md
Quotes
  • Quote
    Its cover letter expressly makes no award commitment.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/NEHHOR_SOLICITATION_AND_PAYMENT_RETURN_2026-10-28.md
  • Quote
    RFP B.5(b)–(c) and B.7 distinguish the borrowed volume returned in kind from the premium paid in U.S. dollars, with B.5 naming Fedwire.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/NEHHOR_SOLICITATION_AND_PAYMENT_RETURN_2026-10-28.md
  • Quote
    Q&A 1–4 also distinguish an in-tank inventory/title transfer from subsequent physical movement under terminal arrangements.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/NEHHOR_SOLICITATION_AND_PAYMENT_RETURN_2026-10-28.md
  • Quote
    This is a solicitation, not an award, delivered barrel or reserve movement.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Weekly Delta 2026-09-30/waves/WAVE_2_OPERATIONS_DELIVERY.md
  • Quote
    The library holds no record of any barrel being delivered or returned.
    File
    ~/Documents/Obsidian/Freedom 250 Chronicle/00 - Index/Operation Inch by Inch/Stories 2026-11-14/batch 5/spr-releases.md
International coordination of stock releases
N
14
Stage
International coordination of stock releases
What happens
The International Energy Agency's Governing Board can decide a collective release of oil stocks, and each member government then carries out its share. On March 11, 2026 the Board decided a release with 32 member governments; by March 19 contribution plans totaled 426 million barrels. On October 29 DOE described its exchange awards as completing a 172-million-barrel U.S. release that contributes to a 400-million-barrel IEA action. The G7 discussed the release but did not own it.
Who
IEA Governing Board (decides); member governments, for the United States DOE (carry out); G7 presidency (political statement).
Under what
The files do not cite the IEA treaty or the U.S. statute for taking part.
Record left
IEA decision and updates; national release announcements.
How long
Decision March 11; plans by March 19; U.S. awards completed October 29, 2026.
Quotes
  • Quote
    The legally competent IEA Governing Board then made a collective-action decision with 32 member governments.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/G7 and G20 Coordination Architecture 2025-2026/G7_G20_PHYSICAL_POWER_AND_INDUSTRIAL_SYSTEMS_2025-2026.md
  • Quote
    contribution plans totaled 426 million barrels across public stocks, obligated industry stocks and production increases
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/G7 and G20 Coordination Architecture 2025-2026/G7_G20_PHYSICAL_POWER_AND_INDUSTRIAL_SYSTEMS_2025-2026.md
  • Quote
    The IEA/member action is operating; it is not a G7-owned release
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/G7 and G20 Coordination Architecture 2025-2026/G7_G20_PHYSICAL_POWER_AND_INDUSTRIAL_SYSTEMS_2025-2026.md
Shipping-lane risk and payment rules for oil moving by sea
N
15
Stage
Shipping-lane risk and payment rules for oil moving by sea
What happens
Two federal records bear on oil moving through dangerous waters. MARAD issues maritime security advisories with effective and expiry dates; a successor advisory replaces an earlier one. OFAC issues guidance and licences: its updated Strait of Hormuz toll-payments alert (August 24, 2026) is guidance, not a blocking order, and its Venezuelan-oil general licences (for example GL 46D, August 27, 2026) set who may deal in Venezuelan oil and require payments to blocked persons to go to the Foreign Government Deposit Funds or another Treasury-instructed account. Neither an advisory nor a licence shows that a cargo moved.
Who
MARAD (advisories); OFAC (alerts and licences); State and DOE (receive licence reports).
Under what
EO 14373 for the Foreign Government Deposit Funds (as the order map records it); the files do not cite MARAD's authority for advisories.
Record left
Numbered MARAD advisory; OFAC alert, general licence and FAQ.
How long
MARAD 2026-012 and 2026-013 effective September 23, 2026, listed active through March 22, 2027.
Quotes
  • Quote
    They update risk, not realized passage or closure.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/GLOBE_REFRESH_AND_RESEARCH_PLAN_2026-10-30.md
  • Quote
    The updated Hormuz alert is guidance, not a new blocking order.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Iran Financial Pressure and Banking System 2026-08-07/OPERATION_ECONOMIC_OUTCAST_DELTA_2026-08-24.md
  • Quote
    Keep the Foreign Government Deposit Funds instruction on the payment chain; do not treat it as an account credit or Venezuelan fiscal receipt.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Global Oil and Gas Movements 2026/VENEZUELA_OFAC_PERMISSION_MATRIX_2026-09-15.md
Points to
  • how-sanctions-export-controls-and-money-laundering-rules-work
Order instructions
  • EO 14373 Sec. 3(b), 6(a)
How the offshore bureaus are organized
N
16
Stage
How the offshore bureaus are organized
What happens
Interior can rearrange its own bureaus by secretarial order. Interior announced a phased plan on April 3, 2026, and Secretary's Order 3451 created the Marine Minerals Administration on July 10, 2026, holding BOEM's leasing and planning and BSEE's safety and enforcement functions. Existing rules and permits stay in force; BOEM and BSEE staff keep operating authority until told otherwise; the order sets a nine-month organizational deadline and a one-year safety report. ONRR stays separate.
Who
The Secretary of the Interior.
Under what
Secretary's Order 3451 (sections 4 to 10, as the files cite them); not a statute.
Record left
Signed secretarial order; Interior announcement.
How long
Nine months for the organization; one year for the safety report; handoff dates open.
Quotes
  • Quote
    This is an Interior organizational reunification, not a congressional merger or statutory repeal.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md
  • Quote
    The order leaves the completion date of individual handoffs, and any resulting change in leasing or production, open.
    File
    ~/Documents/Freedom 250 Observatory/Research Packages/Federal Government Website Sweep 2026-07-25/JULY_SWEEP_OFFSHORE_DEFENSE_AND_EXPORT_AUTHORITY_2026-11-11.md
Points to
  • how-a-federal-agency-is-created-organized-and-changed
Full diagram description
# Diagram description: how oil, gas, offshore energy and mineral projects are authorized, how the revenue is collected, and how fuel supply is held and released in an emergency This describes the picture; it does not draw it. Read with `how-oil-gas-minerals-and-energy-supply-are-authorized-and-held.md`. Time runs left to right. Legal authority runs top to bottom. Money runs in its own lane at the bottom. Oil and gas themselves are never drawn as moving on this picture: every arrow is a permission, an instruction, a payment or a record. ## Layout Five horizontal bands, top to bottom: 1. **Authority band**: Congress, the President, and the executive orders and determinations. 2. **Permission band**: the agencies that grant permissions (Interior and its bureaus, FERC, DOE, MARAD, PHMSA, EPA). 3. **Project band**: the private applicants, lessees and operators, shown as one row of boxes outside the government frame. 4. **Emergency band**: the reserves, fuel waivers, the Defense Production Act route and the IEA. 5. **Money and record band**: ONRR, the Treasury and the funds; EIA stock tables. Two side columns: on the far right, **Courts** (Central District of California, Ninth Circuit, District of Columbia district court, Eastern District of Virginia); on the far left, **Outside the federal government** (IEA Governing Board and member governments, G7, Alaska Gasline Development Corporation, and the Venezuelan counterparties that OFAC licences reach). ## Boxes Authority band, left to right: - **Congress** (top left). One labelled child box: **License to Drill Act, P.L. 119-134 (Oct 20, 2026)**, label "permit-to-drill fee through FY2037". - **President (office)**, with four small boxes hanging below it: - **EO 14156 national energy emergency** (Jan 20, 2025). - **Policy orders**: EO 14153 (Alaska), EO 14154 (American energy), EO 14241 (minerals), EO 14261 (coal), EO 14285 (seabed minerals), EO 14260 (state laws). Drawn as one stacked box with the label "281 instructions in 19 orders; see list". - **DPA delegations**: EO 14391 (Mar 13, 2026) and EO 14427 (Sep 8, 2026), label "Interior and Energy each hold energy DPA powers". - **DPA determinations**: PD 2026-12 (Apr 20, 2026, gas pipelines) and PD 2026-11 (Oct 22, 2026, petroleum). - **Presidential border permit** (Keystone XL), drawn with a struck-through outline and the label "revoked by EO 13990 sec. 6(a)". - **National Energy Dominance Council** beside the President, label "Interior chairs; first stop for Interior-Energy DPA disputes". Permission band, left to right: - **Department of the Interior** (large frame) containing: **BLM** (onshore leasing, permits to drill, NPR-A, public land orders); **Marine Minerals Administration** (offshore leasing and safety since Jul 10, 2026) with two smaller boxes inside it, **BOEM** and **BSEE**, drawn with dashed outlines and the label "keep operating authority until notified"; and **ONRR**, drawn outside the Marine Minerals Administration but inside Interior, label "royalties, rents, bonuses; stays separate". - **FERC** (separate frame, not inside DOE; label "independent commission"), with two boxes: **NGA section 7 certificate (pipelines)** and **NGA section 3 authorization (LNG terminals)**. - **Department of Energy** (frame) with: **gas export and import orders** (Order 4410-B, Sempra 5450, Lovat 5453); **Office of Petroleum Reserves** (moved down into the emergency band, see below); **DPA funding** (Constitution Pipeline $42 million commitment; $150 million petroleum plan). - **DOT** frame with **MARAD** (deepwater port licence; maritime advisories) and **PHMSA** (pipeline safety; special permits). A small **U.S. Coast Guard** box beside MARAD, label "co-reviews". - **EPA** (frame) with **fuel waivers** (moved down into the emergency band) and **air permits** (PSD and Title V for Blue Marlin). - **Treasury: OFAC** (frame at the right end of the band) with **Venezuelan-oil general licences** and **Hormuz toll-payments alert**. Project band (outside the government frame): - **Lessee / operator** (onshore and offshore). - **Pipeline company** (Columbia Gulf, Gulf South, Texas Gas, Gator Express, Constitution Pipeline). - **LNG project company** (Gulf LNG, Louisiana LNG, 8 Star Alaska LLC, Venture Global CP2). - **Deepwater port applicant** (Blue Marlin Offshore Port LLC). - **Reserve counterparties** (ExxonMobil, BP America, Phillips 66; Global, Sprague, Trafigura, Vitol). - **Offshore wind projects** (Revolution Wind, Coastal Virginia Offshore Wind). Emergency band, left to right: - **DPA route** as a chain of seven small boxes: determination -> project selection -> agreement and obligation -> permit or certificate -> construction -> operation -> measured flow. Shade the first two as "recorded in the notes", the third as "commitment or plan only", and the rest as "not recorded". - **EPA fuel waivers** as three separate clock bars: national summer volatility waiver (Aug 20 to Sep 15, "lapsed"); boutique gasoline (renewed Sep 8; Texas to Oct 1, Arizona and California to Oct 7); Arctic diesel (Sep 15 to Oct 4). Label above: "20 days at most each; one does not extend another". - **Strategic Petroleum Reserve** and **Northeast Home Heating Oil Reserve** (DOE Office of Petroleum Reserves), each with a five-step chain: solicitation -> authorization or award -> title transfer in tank -> physical movement -> return (borrowed volume plus premium). Shade only the first two as recorded. - **IEA Governing Board** box on the far left (outside the federal frame), with an arrow into the Strategic Petroleum Reserve box. Money and record band: - **ONRR** (repeated here as the collector), with arrows out to **U.S. Treasury**, **States and localities (34 states)**, **Tribes and individual Indian mineral owners**, **Reclamation Fund**, **Land and Water Conservation Fund**, **Historic Preservation Fund**, **Other funds**. Label the whole fan "FY2026 net $21.8 billion". - **BLM Permit Processing Improvement Fund**, fed by the permit-to-drill fee. - **EIA weekly stock tables**, connected to the Strategic Petroleum Reserve by a thin line labelled "reports level"; no line to the heating oil reserve, label "excluded from commercial distillate tables". - **Foreign Government Deposit Funds**, fed from the OFAC licence box, label "payments to blocked Venezuelan persons". ## Arrows and what each means - Congress -> agencies: thin lines labelled "statute" (the files cite NGA sections 3 and 7, Mineral Leasing Act section 35(d), Clean Air Act section 211(c)(4)(C), DPA sections 101 and 303). Leave the leasing-statute line dotted, labelled "statute not set out in the files". - President -> DPA delegations -> Interior and DOE: solid arrows, label "may use energy DPA powers"; a dashed arrow from both to the National Energy Dominance Council, label "disputes". - President -> PD 2026-11 -> Department of War: solid arrow, label "purchases, commitments, financial instruments"; a separate solid arrow PD 2026-11 -> DOE DPA funding, label "DOE plan up to $150 million". Put a question mark between the two arrows: the files do not explain how they fit. - Policy orders -> each agency box: dashed arrows labelled "instruction". Draw a small counter on each arrow: found / found in part / not found / not searched (overall 2 / 7 / 165 / 107). - BLM -> lessee: "scoping -> sale -> lease (sale steps not described) -> permit to drill". Lessee -> ONRR: money arrow "royalties, rents, bonuses". - FERC -> pipeline company: "certificate (authorizes construction)"; a second, later arrow "in service" drawn as an empty outline (not recorded for the 2026 certificates). - FERC -> LNG project company and DOE -> LNG project company: two parallel arrows of different colour with their own deadlines (for Gulf LNG: DOE export start by Jul 31, 2031; FERC in service by Jul 16, 2029). They must not merge. - MARAD -> Blue Marlin: "application approved Nov 5, 2026"; then empty outlines for "record of decision", "licence", "EPA final permits", "first cargo". - PHMSA -> pipeline: "rules, special permit"; Courts (Central District of California) -> PHMSA: "substituted for State Fire Marshal in consent decree (Aug 19, 2026)". - BOEM -> offshore wind: "suspension (Dec 22, 2025)"; Courts -> offshore wind: "preliminary injunctions (Jan 12 and Jan 16, 2026)". - DOE reserves -> counterparties: "exchange award"; counterparties -> reserves: return arrow drawn as an empty outline with "early 2027" (petroleum reserve) and "premium in dollars by Fedwire" (heating oil reserve). - IEA -> member governments -> DOE: "collective action decided Mar 11, 2026; U.S. 172 million barrels (DOE, Oct 29)". - OFAC -> project band (shipping and buyers): "licence or guidance"; MARAD advisories -> project band: "risk notice; not traffic". ## Where time and authority flow - Authority flows down from Congress and the President to the agencies, then sideways to private applicants. Courts on the right can stop or restart the sideways arrows. - Time flows left to right inside each chain. Each chain ends where the notes stop; draw the unrecorded steps as empty outlines, never as dashed continuations of recorded steps. - Money flows only in the bottom band, from lessees to ONRR and out to the recipients, and from DPA funding to projects (no obligation recorded). ## Labels to keep exactly "Certificate authorizes construction, not in service." "Application approval is not a licence." "Solicitation is not an award." "Award is not delivery." "Advisory is risk, not traffic." "Guidance is not a blocking order." "Reunification by secretarial order, not by statute."

Stories that rest on this

Graphics and studies