Nuclear operating requirements and lifecycle obligations
Selected operating, cooling and waste obligations; six exploratory MOUs and separate commercial-spent-fuel/WIPP boundaries.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Recent work across the Library, organized by subject. Open an individual reading for its complete text and original sources.
Sorted by each object’s own evidence date. Study, graphic and saved-reading clocks do not recertify one another.
706 readings or research entrances in this view.
Selected operating, cooling and waste obligations; six exploratory MOUs and separate commercial-spent-fuel/WIPP boundaries.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Palisades operator-reported fuel/loading pause, later recovery and switchyard work; no inferred generation or SMR permission.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Selected official election records, FAA oversight request, attributed Microsoft account and regulatory direction; no common-cause or nationwide-fraud finding
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Actual-text 1.5/1.6/1.13 reading; NOC/SUP, territorial control, coordination, secondary phone access and unfinished limits.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
SEC November 18 DRS approval and June 2027 outside date, with Securitize IST exit request and DTC response kept separate from operation.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Dated larger-movement interpretation with supporting/challenging future evidence and review checkpoints.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
Nuclear capacity is advancing through existing-plant support, restarts, uprates, new reactors and fuel facilities. The Library records real permits, financing and manufacturing steps; delivery dates, qualified fuel, customer costs and operating results still have to be traced project by project.
Evidence through: 2026-11-19.
November 19 operator reported structured note lifecycle pilot, historical UBS continuity, settlement and legal record limits, and Observatory connections.
Published or updated here: 2026-11-23. Evidence through: 2026-11-19.
This is the published research feed. The full Library directory includes earlier and undated research. Dates do not recertify linked studies.