Satellite control, filing priority and phones: the actual U.S. WRC-27 proposals
Full saved reading
View cited sources (5)
These are the sources cited by this reading. Each source keeps its own date and scope.
Later November 19 completion: The remaining 19 attachments have now been substantively read, completing all 22 linked files. That reading controls full-set refinements: no change at 15 GHz; unresolved 4 GHz/7–8 GHz boundaries; actual lunar allocation/operating proposals; space-weather registration with restricted incumbent-protection claims; and the different force of 1.18 A/B protections. Earlier statements below about the remaining attachments being unread describe the prior pass, not current coverage.
Current story: The actual U.S. texts sharpen the November 18 announcement. In 1.5 the United States proposes keeping existing licensing rules and suppressing the study resolution rather than adding mandatory geofencing, remote disabling or territory-exclusion measures. In 1.6 it proposes keeping the coordination/notification procedure and suppressing the equitable-access study resolution rather than introducing advance allotment planning. In 1.13 it proposes new secondary satellite-to-phone allocations and an associated regulatory resolution, but leaves many numerical limits, some bands, scientific protections and the verification methodology unfinished.
What moved since the first reading: All 22 DOCX files linked inside the FCC release are now locally available and their ZIP/XML structure has been verified. The direct command-line downloader still received 403 responses despite sufficient disk space. Safari successfully retrieved the missing files. Katie had already downloaded several, including the exact 1.5 filename linked in the release. This follow-up reads 1.5, 1.6 and 1.13 in full; availability/extraction of the other 19 attachments is not a claim of substantive review.
Source version boundary: These are the files linked by the November 18 FCC announcement, accessed November 19. That establishes the public linked versions; it does not independently reconcile each one with a later CITEL secretariat acceptance log. A filename containing DRAFT or FINAL is not a final international decision. The 1.13 filename says November 16, while its internal title sheet says November 12, 2026. Both dates are preserved rather than silently choosing one.
The source inventory records all 22 publisher URLs, local Downloads paths, byte sizes and SHA-256 hashes. Originals remain in Downloads; no second set was copied into the Workbench. Publisher links are the durable research source routes. Temporary extraction and rendered pages were used for reading only.
Three originals and their exact document identities
| Item | Actual linked source | Internal identity and date | Proposed disposition |
|---|---|---|---|
| 1.5 | FCC original DOCX | CCP.II-RADIO/doc. 6453/26, March 16, 2026; prepared for PCC.II #47, April 6–10 in Dominica | NOC USA/1.5/1–3; SUP USA/1.5/4 |
| 1.6 | FCC original DOCX | Addendum 6 to Document 4662-E, August 17, 2026 | NOC USA/4662A6/1–2; SUP USA/4662A6/3 |
| 1.13 | FCC original DOCX | Addendum 13 to Document 4914-E, November 12, 2026; filename November 16 | MOD/ADD USA/4914A13/1–20; SUP USA/4914A13/21 |
In the proposal notation, NOC asks for no change, SUP asks to suppress the named text, ADD adds text and MOD modifies it. These are requested conference actions. They have not taken effect merely because the United States submitted them.
Item 1.5: national permission without a new international technical mandate
The operative requests
The four proposal elements are unusually clear:
1. USA/1.5/1: no change to Radio Regulations Volumes 1 and 2 under this item.
2. USA/1.5/2: no change to Resolution 22, concerning unauthorized uplink transmissions.
3. USA/1.5/3: no change to Resolution 25, concerning global satellite systems for personal communications.
4. USA/1.5/4: suppress Resolution 14, the WRC-23 study mandate that created this agenda item.
The U.S. cites Article 18 and Resolutions 22 and 25 as already providing adequate national licensing/authorization obligations. It expressly supports countries' sovereign rights to authorize satellite services in their territories. Suppressing Resolution 14 would end that named study mandate if adopted; it would not suppress Article 18 or Resolutions 22 and 25.
Source: 1.5 original, Background and Proposals USA/1.5/1–4.
What the United States is arguing against
The Background expressly discusses:
- geofencing;
- excluding a territory from a service area;
- NCMC-based control mechanisms (the acronym is used without expansion in this file);
- remote identification and disabling of terminals operating in unauthorized areas; and
- expansion of the Radio Regulations Board's scope or functions, which the U.S. calls outside this agenda item's scope.
The argument is architectural and operational: measures that work for some systems may not work for all global systems, and excluding one territory could harm authorized service elsewhere, including continuous aviation/maritime safety-of-life communications. The U.S. asserts that studies have not produced a practical, technology-neutral, widely implementable basis for new mandatory rules. This reading establishes that assertion; it does not independently prove every technical claim across every constellation.
The text also leaves room for nonmandatory ITU-R recommendations, reports or handbooks, including best-practice guidance on licensing, notification, monitoring and incident response. It says those do not require action by WRC-27 under 1.5.
What this means
Interpretation: the United States wants territorial authorization to remain a legal requirement while resisting an international prescription for how every operator must enforce it technically. This is a dispute about enforcement design and the distribution of responsibility, not rejection of national sovereignty.
The institutional tension remains real. Resolution 14 grew out of reports of unauthorized terminal transmissions and asks how those operations can be limited without harming service elsewhere. The U.S. answer is that the current rules suffice and proposed additional mechanisms fail the implementation test. The proposal does not establish that unauthorized use has disappeared or that affected countries accept this answer.
For the Observatory, this sharpens our Starlink enforcement and access research. Voluntary provider shutdowns in a criminal case, national licensing conditions and a new treaty-level mandate are different sources of control. A company having some remote-control capability does not by itself prove that a particular uniform global obligation is technically workable. Conversely, the U.S. proposal is not evidence that no operator can geofence or disable terminals.
Item 1.6: defend coordination rather than allocate shares in advance
The operative requests
1. USA/4662A6/1: no change to the Articles.
2. USA/4662A6/2: no change to the Appendices.
3. USA/4662A6/3: suppress Resolution 131, the WRC-23 study mandate on equitable access in the specified Q/V bands.
The relevant bands remain 37.5–42.5 GHz downlinks and 42.5–43.5, 47.2–50.2 and 50.4–51.4 GHz uplinks. The proposal defends the Article 9 coordination and Article 11 notification procedures. It is broader than a shorthand about license-processing speed: it opposes new measures that would change coordination or add coordination requirements and implementation barriers for existing, planned or future systems in these bands.
Source: 1.6 original, Background and USA/4662A6/1–3.
The economic and technical case in the text
The U.S. does not reject equitable access as a principle. It quotes Article 44 of the ITU Constitution, including developing-country needs, and argues that the current process already serves it.
Its reasons include:
- rapid changes in flexible payloads, dynamic beamforming and interference mitigation;
- the danger of fixing a plan around today's technology;
- lessons from inflexibility in earlier planned C-/Ku-band arrangements;
- the complexity and reliance interests of already-filed or operating networks; and
- the claimed lack of a viable alternative that meets the study resolution's conditions.
The Background cites a Radiocommunication Bureau report describing nearly 1,000 satellite records at coordination stage and at least 50 at notification stage. Those are filing/record counts attributed by the proposal, not counts of satellites in orbit, service operators or active networks. The underlying Bureau report was not independently recovered in this follow-up, so these figures are not used as a separately verified operating census.
The most revealing argument concerns crowded geostationary locations: the proposal acknowledges that desirable slots can carry a high coordination burden, but characterizes that as efficient and economic use rather than evidence of inequity.
The competing reading
Resolution 131 says first-come arrangements can make future entry difficult and developing countries can lack negotiation resources and expertise. It also acknowledges problems with rigid planning. Thus both sides recognize real constraints; they disagree about what follows from them.
Interpretation: maintaining procedural equality does not necessarily equalize practical access costs. An earlier filer with technical staff and an advanced design may be better positioned than a later entrant. The U.S. argues that a planning remedy could make matters worse by restricting flexibility. The retrieved text proves the policy choice and reasoning, not which framework would produce better measured access or innovation.
There is no proposal here to make existing filings perpetual sovereign property, and suppressing Resolution 131 would not itself erase Article 44's equitable-access principle. Nor has any planning alternative actually been rejected by the conference at this stage.
Item 1.13: add a satellite-to-phone framework while leaving consequential terms open
The proposed service has a narrow purpose
The proposal calls it DC-MSS-IMT: direct connectivity between mobile-satellite space stations and ordinary terrestrial mobile user equipment. New allocations are limited to that purpose. They are not general satellite gateway or fixed-broadband allocations.
Proposed Resolution [B113], under USA/4914A13/20, includes:
- noting b): operations with users in a country's territory require that country's authorization;
- resolves 1: each administration may make the listed bands available on a secondary basis, based on national considerations;
- resolves 2 and 4.1: the new allocation is for links to terrestrial mobile user equipment;
- resolves 3: that equipment must use the same technical parameters for satellite communication as for communication with terrestrial IMT base stations; and
- resolves 5: administrations should cooperate to verify compliance with limits at the border.
The earlier U.S. domestic SCS framework is presented as precedent. That claim does not mean this international text duplicates every domestic license condition, commercial agreement or enforcement procedure. The proposal is not a universal access authorization or a grant to any named operator.
Source: 1.13 original, Background, Article 5 changes and draft Resolution [B113].
What is concrete about the bands
The proposed Article 5 footnotes are more specific than the broad 694/698 MHz–2.69 GHz study envelope. Selected examples, not a complete band schedule, are:
| Proposed footnote | Direction | Examples written in the text | Open qualifications |
|---|---|---|---|
| 5.A113 | Earth-to-space | 807–849 MHz, Region 2 | Region 3 addition is bracketed. |
| 5.C113 | Earth-to-space | 698–716 and 776–798 MHz, Region 2 | 1850–1920 and 2305–2320 MHz additions are bracketed. |
| 5.E113 | Space-to-Earth | 852–894 MHz, Region 2 | Region 3 addition is bracketed. |
| 5.G113 | Space-to-Earth | 716–746 and 746–768 MHz, Region 2 | 1930–2000 and 2345–2360 MHz additions are bracketed. |
| 5.B113 / 5.F113 | Paired directions | Examples include 880–915 MHz uplink and 925–[955 or 960] MHz downlink | The downlink endpoint is unresolved; several higher-band additions are bracketed. |
These are proposed international permissions, not the current U.S. allocation table or a carrier-by-carrier band map. The source expressly says MSS allocations and IMT identifications above 1.9 GHz remain under U.S. consideration, even where some related clauses appear without full enclosing brackets. Absence of a bracket in one paragraph must not be treated as final agreement.
Cross-border limits and agreements are central
Proposed footnotes 5.I113, 5.J113 and 5.K113 introduce agreement under Radio Regulations No. 9.21 where radiation reaching another country's territory exceeds a threshold. That threshold is printed as −XXX dB(W/(m² · 4 kHz)), not a numerical limit. The affected administration may agree to exceedance on its territory.
Draft [B113] resolves 4.2–4.4 would apply power flux-density limits to protect neighboring terrestrial networks. Power flux density here is the received power spread over area and bandwidth. It is not simply the satellite's transmit-power setting.
The text specifies the sum of all visible beams and satellites within each constellation, and allows a different limit or alternative through bilateral/multilateral coordination with the relevant neighboring or nearby administrations. The first table's six columns—738, 880, 1400 and bracketed 1900, 2300 and 2500 MHz—contain TBD, not final values. The angle-dependent formulas for other duplex arrangements contain XXX and unspecified breakpoints. Frequency-division duplex (FDD) separates transmitting and receiving into different bands; time-division duplex (TDD) alternates them in time. Compatibility affects which protection calculation applies.
Interpretation: secondary status sets the priority rule, but these unfinished limits and agreements will determine much of the usable capacity in practice. A cap aggregating one constellation is also different from a single shared cap across all operators' constellations. This source does not demonstrate a measured interference exceedance or settle how the combined field will behave.
Scientific and safety protections are not all settled
Two footnotes contain actual numerical language, but both are presented in bracketed proposed additions:
- 5.L113: a minimum out-of-band attenuation of 43 + 10 log₁₀(P) dB, with P in watts, for 2110–2170 MHz operations to protect space-based receivers in the adjacent 2025–2110 MHz band. It is bracketed; it is not an adopted standard.
- 5.M113: a proposed obligation, absent agreement from the affected administration, not to exceed RA.769-2 Table 1 levels for out-of-band emissions in 1400–1427 and 2690–2700 MHz at registered radio-astronomy stations. A separate sentence encourages practicable steps toward an aggregate −141 dB(W/m²/(5 MHz)) criterion, especially in No. 5.149 bands. The mandatory wording, agreement exception and nonmandatory encouragement have different force even within this unresolved proposal.
An editor's note expressly calls for further discussion of Earth-observation, space-research, space-operation and radio-astronomy protection clauses and footnotes 5.L113/5.M113. Numerous aviation, fixed-service, broadcasting, satellite-receiver and radiolocation limits remain TBD. The proposed Annex describing a unified compliance-calculation/verification methodology is also TBD.
This is a stronger qualification than “technical details to follow.” Both the proposed standards and the method for showing compliance are incomplete in material places. The background also urges modernization of incumbent protection criteria; that is a policy request, not proof that existing criteria have already been revised or are scientifically unnecessary.
Closing the study versus finishing the replacement
USA/4914A13/21 proposes suppressing Resolution 253 as a consequential action. Read it with the proposed new allocations and [B113] resolution: the U.S. is proposing to replace a study mandate with a service framework. This differs from 1.5 and 1.6, where the operative request is to keep current rules and suppress the corresponding study mandate. In all three, suppression is proposed, not accomplished.
What changed in our understanding
| First-pass understanding | Detail established by the originals | Result |
|---|---|---|
| 1.5 resists expansion of ITU control | Four explicit requests; geofencing, remote disabling, service-area exclusion, Board scope and nonmandatory guidance discussed | We can identify the enforcement design the U.S. rejects while retaining its national-licensing position. |
| 1.6 defends first-come filing | NOC Articles/Appendices, SUP Resolution 131; explicit argument against advance planning and added coordination barriers | The allocation/distribution argument is clearer; no permanent property right or demonstrated access outcome is established. |
| 1.13 supports secondary satellite-to-phone use | Band-specific footnotes, national choice, handset-parameter rule, cross-border agreement and per-constellation aggregation | The proposed operating structure is now readable. |
| Details were inaccessible | All 22 originals recovered; the priority three fully read | The download gap is closed. |
| Technical limits might be specified in the attachments | Many are actually TBD/XXX, some additions remain bracketed, and the compliance Annex is unfinished | The remaining uncertainty is in the negotiating text itself, rather than merely in our access. |
Observatory connections and next evidence
The shared question is who can authorize, constrain and verify access to a global communications system. The three proposals allocate those functions differently: national licensing without uniform new shutdown rules, established international filing procedures without advance allotments, and new satellite-to-phone access with national permission and cross-border technical conditions.
The existing communications owner, Starlink access/cooperation reading, Mystic Alerts reading and ITU institutional map remain the connected factual entrances. Satellite-to-phone resilience may support public warning; these texts do not establish Mystic compliance, a separate national internet, a new emergency command power or a specific company's contract gain. Astronomy and space weather remain physical-science research here, separate from the Chronicle's astrology.
At CITEL PCC.II #48 and subsequent releases, compare:
1. Whether the NOC/SUP positions in 1.5 and 1.6 acquire regional support, reservations or alternatives.
2. Any new mandatory terminal-control or territorial-exclusion language, its legal actor and its safety/authorized-service exceptions.
3. Which 1.13 bands and regions lose or retain brackets; whether the above-1.9 GHz reservation changes.
4. The numerical values replacing TBD/XXX, units, altitude/geometry, FDD/TDD distinctions and per-constellation versus combined-system scope.
5. The agreement thresholds, whose consent is needed, and whether a default can be changed only by affected administrations.
6. Scientific/aviation protection wording, the difference between compulsory limits and encouragement, and a completed compliance Annex.
7. Separately, adopted final acts, effective dates, domestic licensing, actual border coordination and operating measurements.
Reading and custody receipt
Evidence checked November 19, 2026, America/New_York. This is a later same-day extension to the first announcement reading. The broad owner cutoff remains July 15.
The three complete main-document XML texts were read. The 1.13 source contains 235 insertion elements and one deletion element; the sole deletion contained whitespace. Insertions were read as proposed additions, not accepted law. Tables, brackets and selected critical passages were checked against a temporary 19-page rendering, including proposed footnotes 5.I113–5.M113, resolves 1–4.2, the TBD power table and the unfinished Annex. The other 19 attachments are inventoried and structurally verified, not declared fully read. No edited DOCX or new PDF is a deliverable of this research.
The source inventory preserves exact versions and acquisition paths. A later moved/deleted Downloads file would not mean the public proposal disappeared; use the publisher link and compare the recorded hash. No originals were deleted or relocated.
Integration: same sovereign-communications factual owner and fcc-wrc27-us-proposals thread; substantive deepening of that existing negotiating step, with no invented new event or standalone chronology. The source-access follow-up is resolved for all 22 linked documents; substantive CITEL and unfinished-clause returns remain open. No app installation, publication or automation change is implied.
Sources
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: "Satellite control, filing priority and phones: the actual U.S. WRC-27 proposals"
status: current
artifact_role: factual_spine
research_id: sovereign-communications
evidence_cutoff: 2026-11-19
timezone: America/New_York
---