What the remaining WRC-27 proposals reveal about America's communications buildout
Full saved reading
View cited sources (19)
These are the sources cited by this reading. Each source keeps its own date and scope.
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
- FCC original DOCX
Current story: The complete linked proposal set shows a selective effort to make existing communications institutions accommodate new equipment, new users and new locations. Some proposals expand permissions; others preserve incumbents or close study mandates without expansion. The most concrete mechanisms are revised antenna conditions, international coordination, record and software requirements, satellite relay eligibility, lunar operating limits and different kinds of scientific protection.
Most consequential refinements: the 15 GHz mobile proposal is no change, while 4 GHz and 7–8 GHz boundaries remain unresolved for later CITEL discussion. The lunar text proposes actual allocations and operating conditions, beyond merely requesting studies. The space-weather proposal adds primary allocations and a route into the international frequency register while expressly limiting claims against incumbents. Item 1.18 A proposes mandatory Earth-observation limits; 1.18 B insists on nonmandatory astronomy coordination thresholds. Those are materially different choices.
Thesis reading, explicitly interpretation: This is a useful proposed example of the Operational Refounding thesis: institutions remain while their procedures determine which capabilities can operate, who must supply evidence, whose existing position is protected and how disputes are handled. The texts establish U.S. proposals and their mechanisms. They do not prove an accomplished refounding, a common operating network, measured legitimacy recovery or a uniformly beneficial outcome.
Reading scope and source boundary
This completes substantive reading of the remaining 19 attachments, following the earlier complete 1.5/1.6/1.13 reading. Together they cover all 22 DOCX files linked in the November 18 FCC announcement: 19 agenda items, with three 1.7 documents and two 1.18 documents.
Main text, proposed modifications, insertions/deletions, footnotes, annexes and affected tables were read. Exact repeated passages were compared once with repeat pointers; reprinted baseline table entries were distinguished from proposed changes. Eight table/figure-heavy sources were rendered for targeted visual checks. Formula images and orbital figures in 1.11 and the lunar network figure in 1.15 were inspected. This is a substantive document reading, not an independent rerun of interference simulations, a numerical audit of every reference-link combination or a census of later CITEL versions.
The source inventory controls exact publisher links, local versions and hashes. Original files remain in Downloads; reading extracts and renders are temporary. References D01–D22 below use that inventory's stable document numbers. The three previously read sources are D05, D06 and D15.
Dates printed inside a source, its filename, the November 18 announcement and our November 19 reading are separate clocks. In particular, the 4 GHz file has a November 16 filename but a September 14 internal cover date; 7–8 GHz has a November 16 filename and November 13 internal cover date. The 1.4 linked file is a March contribution. No assumption that every file is the latest CITEL secretariat version is made. IAP/DIAP labels and listed or bracketed supporters within a proposed contribution are not treated as an independently verified final meeting disposition.
All remaining attachments
Every action below is proposed, not an adopted WRC-27 result. NOC means no change; SUP means suppress the named text; MOD/ADD propose modifications/additions. Suppressing a study resolution can accompany either a new framework or a decision to retain existing rules; it does not have one policy meaning across all items.
| Document / agenda item | Operative proposal and detail that stands out | Exact passage entrance |
|---|---|---|
| D01 / 1.1 | NOC Articles/Appendices; SUP Resolution 176. Cites incomplete studies and missing operator deployment, duty-cycle and tracking characteristics, not merely an abstract interference concern. | USA/4818A1/1–3; Background |
| D02 / 1.2 | Modify 5.502/5.503 and Appendix 4; SUP Resolution 129. Removes specified 1.2 m GSO and 4.5 m non-GSO minimum antenna sizes, while retaining interference conditions and extending the relevant filing commitment beyond geostationary systems. | USA/4661A2/1–5, including deleted text |
| D03 / 1.3 | Extend 51.4–52.4 GHz uplinks to non-GSO gateways, without a new non-GSO minimum antenna size. Apply coordination, single-system/aggregate GSO protection and passive-service unwanted-emission requirements. | USA/4771A3/1–14; Resolutions 750/769/770 |
| D04 / 1.4 | Add Region 3 FSS downlinks at 17.3–17.7 GHz and extend coordination/protection tables. New receiving earth stations may not claim protection from, or restrict the location of, existing BSS feeder-link earth stations. | USA/AI 1.4/1–13; proposed 5.515C |
| D07 / 1.7, 4 GHz | Seek a portion of 4.4–4.8 GHz, but explicitly retain bracketed/TBD boundaries until CITEL meeting #49. IMT identification creates neither exclusive use nor priority; aircraft telemetry and radio-altimeter coexistence remain explicit. | Background; 5.IMT; Resolution 223 amendments |
| D08 / 1.7, 7–8 GHz | Seek 7.125 GHz to an upper limit still TBD; retain brackets through meeting #49. IMT must not claim protection from specified space-research/Earth-observation uplinks. Satellite receiving sites require site-specific coordination/separation. | USA/4845A7/1–6; proposed 5.A17-2C/3C |
| D09 / 1.7, 15 GHz | NOC for 14.8–15.35 GHz; source cites studies requiring separation up to 450 km. SUP Resolution 256 is proposed as work completion. | USA/4712A7/1–4 |
| D10 / 1.8 | New primary radiolocation allocation at 252–275 GHz, narrower than the agenda envelope. Identify 275–296, 306–313 and 356–439 GHz applications without priority over other services; interim vehicular-radar unwanted-emission value included. | USA/4816A8/1–4; proposed 5.18A |
| D11 / 1.9 | Allow contiguous/noncontiguous HF channel aggregation for off-route aviation, with emission and power conditions, without changing the allotment plan. A U.S. editorial note retracts one proposed 26/3.5 modification. | DIAP/1.9/1 and /10; USA/1.9/2–9; footnotes |
| D12 / 1.10 | Add concrete angle-dependent satellite power-flux-density masks and earth-station coordination parameters for E-band sharing. Numerical table rows are specified, unlike 1.13's many TBD values. | USA/4814A10/1–4; Table 21-4; Appendix 7 Table 7c |
| D13 / 1.11 | Recognize lower-altitude satellites as users of existing higher-altitude MSS networks, with geometry, registered-network envelopes, new filing data and Bureau examination. Not a universal satellite mesh or laser-link proposal. | USA/4344A11/1–14; proposed SAT-TO-SAT resolution and annexes |
| D14 / 1.12 | NOC Articles/Appendices; SUP Resolution 252. Questions the undefined low-data-rate service case and cites band-specific conflict with passive science, safety and terrestrial users; redirects appropriate phone-connectivity treatment to 1.13. | USA/4817A12/1–3 |
| D16 / 1.14 | NOC; SUP Resolution 254. In particular, rejects changing the Region 2 arrangement toward co-primary MSS in heavily used mobile bands; appropriate secondary phone-connectivity conditions can be handled under 1.13. | USA/1.14/1–2 |
| D17 / 1.15 | Proposes lunar SRS allocations and a new operating resolution, with separate relay, short-link, beacon and PNT uses, lunar-distance conditions and shielded-zone treatment. Some support indications remain bracketed. | IAP/1.15/1–18; proposed 5.A115/5.B115 and Resolution A115 |
| D18 / 1.16 | NOC Volumes 1/2; SUP Resolution 681. Favors national/site arrangements and nonmandatory ITU-R guidance instead of new treaty-level quiet-zone rules. Cites U.S. NSF/operator arrangements as its preferred example. | USA/1.16/1–2; Background |
| D19 / 1.17 | Add six primary ground-based receive-only space-weather allocations, constrained by incumbent-protection footnotes; add Article 11 notification and Appendix 4 fields for the MIFR. | USA/4526A17/1–22; proposed 11.12bis and 11.31.3 |
| D20 / 1.18 A | Mandatory unwanted-emission limits for specified studied Earth-observation compatibility cases; further work where parameters were unavailable. Retains no Bureau Article 9/11 examination or finding under Resolution 750. | USA/4812A18/1–8; Resolution 750 resolves 1–3/Table 1 |
| D21 / 1.18 B | Keep astronomy measures nonmandatory; add GSO PFD and non-GSO received-power thresholds to trigger consultation. Explicitly prefers NOC over making the resolution mandatory or adding the rejected EPFD approach. | USA/4813A18/1–3; Resolution 739 resolves/Annex |
| D22 / 1.19 | NOC; SUP Resolution 674. Says sea-surface sensing cannot obtain the protection it needs under the no-new-constraints premise. Acknowledges existing secondary authorization in 4.2–4.4 GHz while reporting no deployed EESS sensors there. | USA/1.19/1–2; Background |
What stands out in the actual mechanisms
Smaller terminals: remove a hardware floor, retain a performance obligation
Under 1.2, the deleted text includes the 1.2 m GSO and 4.5 m non-GSO minima. The remaining 5.502 conditions include −115 dB(W/(m² · 10 MHz)), exceeded no more than 1% of the time, measured at the specified coastal or border geometry. The Appendix 4 filing commitment is extended beyond geostationary systems for the relevant smaller-than-4.5 m case. This is a concrete change from prescribing equipment size toward constraining its interference effects. It is not permission for arbitrary emissions, and the source does not establish a new universal minimum antenna diameter. [D02]
The same proposal deletes specified legacy 13.77–13.78 GHz power-density provisions while retaining the stated status of earlier space-research stations. That is more specific than “smaller dishes with existing science protection unchanged.” The proposed protection package must be read as a whole. No device price, authorized terminal or measured coexistence result is established.
Item 1.3 makes a related but distinct move. Proposed 5.A13 permits non-GSO gateway use, not user terminals generally, at 51.4–52.4 GHz; the existing 2.4 m GSO gateway condition remains in 5.555C. It extends the band into Article 22's reference-link protection and the Resolutions 769/770 procedures. Passive sensing at 52.6–54.25 GHz receives specified unwanted-emission conditions: for non-GSO gateways, −45 dBW in any 100 MHz without uplink power control; with control, the zenith value may increase by up to 7 dB under the specified path-loss/elevation conditions. [D03]
Coordination can allocate the cost of coexistence
The extended Resolution 769 text in 1.3 requires administrations to share an aggregate interference allowance through consultation. Not participating does not remove a system or its obligations. If agreement fails, the text provides for proportional reductions in individual interference allowances. A convener communicates results and records to the Bureau, which publishes specified information. Relevant provisions and many technical parameters are inherited rules being extended to a new band, not all newly invented by this proposal. [D03]
Its reproduced Annex 2 gives implementation evidence a role: manufacturing/procurement and launch agreements, or guaranteed financing arrangements, help determine which systems count in the aggregate process. Visibility and participation provisions are broader than the eligibility conditions for those calculations. Interpretation: this is a point where paper filings, demonstrated project commitment, technical capacity and the sharing of a finite interference allowance meet.
Resolution 770 also distinguishes a favourable finding from a qualified favourable finding when the Bureau lacks validation software and the administration supplies the required information and commitment. The text anticipates later examination once software is available. That is an evidence and verification distinction—not permission to treat a commitment as a completed technical test.
For 1.4, proposed 5.515C makes the incumbent priority concrete: new Region 3 receiving terminals cannot demand restrictions on the location of existing broadcasting feeder-link earth stations. Harmonization therefore expands an opportunity with an expressly asymmetric coexistence condition. [D04]
6G: a qualified spectrum choice, not all three bands opened
The 4 GHz and 7–8 GHz texts expressly keep frequency boundaries open for CITEL #49. The 4 GHz text identifies AI and digitalization as motivations, but this is policy reasoning, not an operating AI deployment. Its proposed IMT identification states that other allocated applications remain possible and IMT gains no regulatory priority merely from identification. The 7–8 GHz proposal expressly denies protection claims against specified Earth-to-space science uplinks and calls for site-specific treatment of satellite receivers. [D07], [D08]
The 15 GHz component takes the opposite disposition: NOC, citing the separation distances in the studies. [D09] Accordingly, the first announcement reading's broad description of a 6G push must be narrowed by these three different texts. It is not accurate to say that the U.S. supports opening every range considered under 1.7.
This joins our Upper C-band rights and transition case and the December 2025 6G directive discussion. Identification, domestic reallocation, relocation costs, licensing and operating use remain different steps. These international proposals do not update the separately dated domestic auction or aircraft-retrofit record.
Space networks: an existing satellite system gains a new kind of user
Item 1.11 is a particularly direct institutional adaptation. It describes small/lower-altitude satellites with intermittent ground access using higher-altitude MSS satellites to relay data. Proposed operations must stay within specified frequency directions, altitude/beam geometry and the host network's recorded characteristics. Some bands are limited to non-GSO-to-GSO links; the proposal does not approve every band in the broader study envelope. [D13]
The user station must identify its associated recorded provider network in advance-publication information. The notifying country for the user need not be the provider network's notifying country. The provider's notifying administration is assigned responsibility for eliminating unacceptable interference, and the Bureau returns information if it cannot identify the required provider assignments. New Appendix 4 data describe an exclusion angle and an emissions mask. The Annex supplies geometry and an examination path ending in favourable or unfavourable findings.
Interpretation: space infrastructure grows by admitting a new user class into an established service and its records. That is stronger evidence of procedural adaptation than a general slogan about commercial space, while still being a proposal. It does not establish an accepted relay service, a global mesh, a particular provider's gain or an orbital AI data center.
Our NASA relay-award record makes a useful functional comparison: NASA is procuring concept/risk-reduction work toward later relays. Those Ka-band awards and this lower-frequency MSS proposal are not the same band, procurement or operating network. The same NASA note records a servicing demonstrator lost after communications failure, reminding us why delivered connectivity has its own evidence clock.
The Moon: more than a study request
The 1.15 text explicitly connects its intended framework to planned government/private lunar missions and Artemis objectives. It proposes new or modified SRS allocations in specified portions of 390–450 MHz, 2.4–2.69 GHz, 3.5–3.8 GHz, 5 GHz ranges and 27.5–28.35 GHz, with different conditions by use. It chooses NOC for other listed ranges, including 25.25–27.5 GHz where it says no sharing studies were performed. [D17]
The new A115 resolution distinguishes:
- surface-to-orbit relay links in specified lower-frequency bands;
- 406–406.1 MHz beacon data from the surface toward lunar orbit;
- short links below 20 km in specified bands; and
- 2483.5–2500 MHz positioning, navigation and timing data from lunar orbit.
The stated vicinity condition is within 100,000 km of the Moon's center. Some lower-frequency uses are excluded from the shielded zone of the Moon. Other relevant uses rely on the existing agreement provisions for protecting passive observations there, with publication of received impact/agreement information. The source includes a network illustration linking astronauts, rovers, landers, habitats, base stations and orbiting relays. It depicts an envisioned architecture, not installed equipment.
This materially deepens the initial description “study lunar communications.” It connects to our CLPS missions and awards, where actual lunar data and delivery outcomes differ sharply by mission. It also sits alongside the Artemis institutional comparison: political coordination, spectrum permission, a mission contract and a delivered scientific result do different work. No lunar title, sovereign land claim or transfer of treaty authority is established by this radio proposal.
Science: four different protection bargains
The documents do not support one generic claim that the United States is either abandoning scientific protection or expanding it across the board.
1.16 favors national and voluntary arrangements. It proposes NOC and suppression of Resolution 681, allowing work through nonmandatory ITU-R outputs. The Background invokes NSF/operator agreements, and claims some arrangements increased bandwidth by up to 25% while enhancing astronomy protection. That is a claim in the U.S. proposal, not an independently audited measurement in this reading. Its rejection of new treaty-level quiet-zone rules remains distinct from whether existing protections suffice under aggregate constellation interference. [D18]
1.17 formalizes a receiving activity without promising incumbent priority. It proposes primary MetAids (space-weather) allocations at 27.5–28.0, 29.7–30.2, 32.2–32.6, 37.5–38.325, 73–74.6 and 608–614 MHz, limited to ground-based receive-only sensors. Detailed regional footnotes restrict claims of protection against specified existing services and their future development. The source also says that using the resulting forecasts for public safety does not make the cited safety-service provisions applicable. [D19]
The especially concrete change is proposed 11.12bis: an administration could notify a receive-only station if it wants the data in the Master International Frequency Register. Examination would be under 11.31 only, rather than all the coordination/interference findings listed in 11.32–11.34. Appendix 4 adds a notice category and data such as receiving bandwidth, beam elevation/azimuth, gain and beamwidth, alongside station location and responsible-administration fields. Interpretation: the authoritative register gains coverage of an activity it could not previously record through this route; the register itself does not move to another owner. Recognition, recording, priority and observed signal quality remain separate.
1.18 A adds specified mandatory emission obligations. It proposes new Resolution 750 Table 1 limits for studied adjacent-band cases, including satellite uplinks near 86–92 GHz passive observations, railway radio and airport-debris radar, and fixed links near 114.25–116 and 164–167 GHz. Examples include −54 dBW/100 MHz for the specified railway application and −42 dBW/100 MHz for the debris-radar application. Unstudied scenarios are directed toward further work where adequate system parameters are available. The retained text says the Bureau makes no Article 9/11 examination or finding under this resolution. A mandatory operator/administration obligation and a centralized international preclearance test are different things. [D20]
1.18 B keeps thresholds and consultation nonmandatory. The U.S. explicitly opposes making Resolution 739 mandatory and the EPFD approach it rejects, preferring NOC if those are the alternatives. It adds GSO power-flux-density and non-GSO received-power thresholds, with telescope-specific consideration and pre-/post-launch consultation. The reproduced procedure contains timing conditions: the relevant astronomy station must have been notified before the satellite system's API date, and satellite application dates are linked to the applicable Final Acts. The Bureau is again instructed not to examine or make a finding under Articles 9/11 for this resolution. [D21]
The distinction between mandatory limits, limited rights, notification, consultation and nonbinding best efforts is therefore part of the substance. None proves improved observed sensing or a resolved interference dispute.
Other findings worth keeping
HF is a resilience path too. Item 1.9 explicitly treats HF as a beyond-line-of-sight alternative during disasters and national emergencies. Its technical change aggregates existing channels under emission, power and compatibility rules while preventing aggregation from becoming a backdoor change to the allotment plan. Modernizing an old radio layer can be part of future resilience. The proposal's availability assertions are not a deployment or performance audit. [D11]
High-frequency sensing is narrower than the study headline. Item 1.8 selects 252–275 GHz for a new primary allocation, not the entire 231.5–275 GHz study range. Identifications above 275 GHz do not confer priority over other applications; the source includes an interim vehicular-radar unwanted-emission value pending an appropriate recommendation. This belongs beside industrial automation/transport communications, without asserting a deployed scanner, surveillance system or autonomous vehicle. [D10]
E-band sharing has concrete numbers. Item 1.10 proposes specified GSO and non-GSO angle-dependent masks and coordination parameters. At low arrival angles the new 71–76 GHz table rows begin at −125 dB(W/m²) per MHz; the rest of the mask depends on geometry and orbit class, so that number alone is not a universal limit. Its Background calls the non-GSO mask a compromise between studied options. It is a useful contrast to the unfinished numerical fields in 1.13. [D12]
Rejected satellite allocations protect different incumbents. Items 1.1, 1.12 and 1.14 are not one blanket anti-satellite position. They invoke different missing inputs or sharing conflicts, including the distress/safety role of 1645.5–1646.5 MHz, terrestrial mobile service and passive observations. Some of the separation distances cited in 1.12 are hundreds of kilometers; these are reported study scenarios, not measured interference footprints assigned to an actual operating network. [D01], [D14], [D16]
The ocean-sensing text is more nuanced than “no allocation.” Item 1.19 acknowledges that passive sensing may already be authorized on a secondary basis at 4.2–4.4 GHz, while saying no EESS sensors are deployed there. Its proposed rejection concerns new primary allocations that cannot obtain protection from existing active services under the study's conditions. Existing aircraft altimeters, avionics links, mobile/fixed systems and science downlinks are among the relevant uses. The study's constraint and the result of its sharing analysis must both be preserved. [D22]
Reading the larger thesis without making the evidence do too much
Katie's North Star thesis asks how public authority and private capability are recombined through ordinary institutional machinery. These proposals make six such mechanisms visible:
| Thesis question | What the texts actually show | Where the test remains open |
|---|---|---|
| Can an old rule admit a new capability? | Smaller-antenna conditions, satellite user classes, channel aggregation and lunar SRS allocations are proposed within existing regulatory forms. | Adoption, domestic authorization, equipment and operating results. |
| Who holds the authoritative record? | Existing ITU notification/register machinery would gain sensor classes and relay data; some changes require commitments or identified provider records. | Accepted entries, usable validation software and accurate operational parameters. No record-owner migration is established. |
| Who bears limits and correction duties? | Different provisions place obligations on notifying administrations, providers and consultation groups; nonparticipation need not remove aggregate obligations. | Actual corrective action, dispute resolution, service continuity and costs. |
| How are public and private roles joined? | Governments negotiate and authorize; private operators supply system characteristics, technology and service; NASA procurement is a separate connected route. | Executed permissions/contracts and accepted delivery, not a single merged organization. |
| Does procedural flexibility widen participation? | The U.S. advocates flexibility and new service access while defending existing filing and incumbent positions. | Entry costs, later-entrant outcomes, scientific access and distribution of burdens. |
| Does more activity restore legitimacy? | Proposals describe expected benefits and preferred safeguards. | Measured reliability, performance, transparency, correction and remedy; these sources do not measure public legitimacy. |
Supports the thesis as an interpretation: the proposed changes are granular, institutional and operational; no wholesale replacement of ITU is needed for potentially consequential changes in who can use networks and which activities appear in the record. Satellite connectivity, sensing and lunar activity are being negotiated through existing authorities.
Complicates a simple progress story: the same machinery can preserve incumbents, limit a newly recognized sensor's rights, tolerate unfinished conditions, or leave remedies to negotiation. More access for one service can impose costs or reduce options for another. Several proposals request no expansion. Suppression of a completed study mandate is often ordinary conference housekeeping, not evidence by itself of a legitimacy crisis or institutional dismantling.
Competing explanation: ordinary periodic technical modernization also produces amended tables, new user classes and completed-study suppression. The documents support the proposed procedural mechanism much more directly than they establish a legitimacy crisis as its cause. A larger refounding claim needs evidence that these changes materially alter default users, operational control, responsibilities or results.
Not established: a single centrally coordinated technological network; a transfer of ITU's authoritative record; U.S. withdrawal; an adopted new global regime; a completed buildout; a causal link to the Observatory's entire thesis; or that the proposed changes are already more productive, fair or correctable. This package is evidence of proposed procedural adaptation, with the policy intention and the outcome test kept apart.
What to follow next
Use the existing WRC research return, not a new automation:
1. CITEL #48/#49 support, reservations, revisions and exact accepted versions, especially the 4 GHz/7–8 GHz boundaries and lunar bracketed support.
2. Adopted rule text versus retained study work, and each provision's entry-into-force conditions.
3. Actual notification fields, registered new sensor/relay users, Bureau software/verification status and provider commitments.
4. Specific coordination agreements, aggregate allowance changes, interference correction and telescope/sensor results.
5. Separately, NASA/other mission procurement and accepted relay/lunar delivery; these radio proposals do not close those questions.
The earlier 1.5/1.6/1.13 return remains necessary for national permission, filing access and unresolved phone-connectivity clauses. The larger dataset now lets us compare those open terms with documents that already specify different verification and remedy paths.
Reading receipt and delivery state
All remaining 19 source documents received a substantive reading on November 19, completing the 22-file linked set together with the prior three-document reading. This records source coverage, not agreement with every technical assertion or exhaustive recertification of every cited study or older regulation.
The full current-text narrative and material deletions were reviewed. Body tables, footnotes and annexes were included; the large reprinted 1.17 notification matrix was read in a row-wise representation distinguishing the new sensor column/fields from inherited service templates. Temporary renders cover D03, D04, D12, D13, D17, D19, D20 and D21; selected material rows/figures/formulas were visually checked. Some legacy equation objects are best read in the original rather than flattened extraction. No simulations, link budgets or allocation database were independently recalculated.
The prior announcement and priority-three notes remain available with explicit coverage-successor pointers. This file controls the new full-set refinements and the separately labeled thesis assessment. The broad Sovereign Communications evidence cutoff remains July 15. Catalog, Registry, Brief, package doorway, source coverage and the existing WRC thread/crosswalk receive the dated extension. No independent new chronology or operating event is invented. Generated private pages, installed app and public release retain their separate delivery states.
Original proposal sources
- D01 / 1.1 — FCC original DOCX; exact local version and hash are in the source inventory.
- D02 / 1.2 — FCC original DOCX; exact local version and hash are in the source inventory.
- D03 / 1.3 — FCC original DOCX; exact local version and hash are in the source inventory.
- D04 / 1.4 — FCC original DOCX; exact local version and hash are in the source inventory.
- D07 / 1.7 4 GHz — FCC original DOCX; exact local version and hash are in the source inventory.
- D08 / 1.7 7–8 GHz — FCC original DOCX; exact local version and hash are in the source inventory.
- D09 / 1.7 15 GHz — FCC original DOCX; exact local version and hash are in the source inventory.
- D10 / 1.8 — FCC original DOCX; exact local version and hash are in the source inventory.
- D11 / 1.9 — FCC original DOCX; exact local version and hash are in the source inventory.
- D12 / 1.10 — FCC original DOCX; exact local version and hash are in the source inventory.
- D13 / 1.11 — FCC original DOCX; exact local version and hash are in the source inventory.
- D14 / 1.12 — FCC original DOCX; exact local version and hash are in the source inventory.
- D16 / 1.14 — FCC original DOCX; exact local version and hash are in the source inventory.
- D17 / 1.15 — FCC original DOCX; exact local version and hash are in the source inventory.
- D18 / 1.16 — FCC original DOCX; exact local version and hash are in the source inventory.
- D19 / 1.17 — FCC original DOCX; exact local version and hash are in the source inventory.
- D20 / 1.18 Issue A — FCC original DOCX; exact local version and hash are in the source inventory.
- D21 / 1.18 Issue B — FCC original DOCX; exact local version and hash are in the source inventory.
- D22 / 1.19 — FCC original DOCX; exact local version and hash are in the source inventory.
[D04]: https://www.fcc.gov/sites/default/files/CCPII-2026-47-6452_i.docx
[D07]: https://www.fcc.gov/sites/default/files/Draft%20US%20PP%201.7%204GHz%2011%2016%2026%20i.docx
[D22]: https://www.fcc.gov/sites/default/files/CCPII-2026-47-6456_i.docx
Sources
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: "What the remaining WRC-27 proposals reveal about America's communications buildout"
status: current
artifact_role: factual_spine
research_id: sovereign-communications
evidence_cutoff: 2026-11-19
timezone: America/New_York
source_event_date: 2026-11-18
---