{"id":"nuclear-infrastructure-buildout","title":"The nuclear infrastructure buildout","evidence_through":"2026-11-19","question":"Which nuclear projects can supply usable electricity or industrial heat, when, at what cost, and under whose authority and financial responsibility?","answer":"Nuclear capacity is advancing through existing-plant support, restarts, uprates, new reactors and fuel facilities. The Library records real permits, financing and manufacturing steps; delivery dates, qualified fuel, customer costs and operating results still have to be traced project by project.","human_url":"/library/studies/nuclear-infrastructure-buildout/index.html","research_id":"nuclear-infrastructure-buildout","reading_scope":"Readings admitted in the November 23 bounded publication. This is not an exhaustive reconstruction of private package contents.","recommended_readings":[{"id":"fff34c3f8c3caa4fe25c","title":"Advanced nuclear projects move through different construction and customer decisions","human_url":"/library/readings/fff34c3f8c3caa4fe25c.html","record_url":"/library/bot/readings/fff34c3f8c3caa4fe25c/index.json"},{"id":"6c441d35cbd23bc072b9","title":"Fusion research selections and electricity milestones","human_url":"/library/readings/6c441d35cbd23bc072b9.html","record_url":"/library/bot/readings/6c441d35cbd23bc072b9/index.json"},{"id":"cb1fa04c5004b8799012","title":"Nuclear computing and the Prometheus deployment programme","human_url":"/library/readings/cb1fa04c5004b8799012.html","record_url":"/library/bot/readings/cb1fa04c5004b8799012/index.json"},{"id":"b1770bbe674989e4d5dd","title":"Existing nuclear capacity financing and licensing changes","human_url":"/library/readings/b1770bbe674989e4d5dd.html","record_url":"/library/bot/readings/b1770bbe674989e4d5dd/index.json"},{"id":"012737962a630f16c33e","title":"Nuclear fuel capacity contracts and construction quality","human_url":"/library/readings/012737962a630f16c33e.html","record_url":"/library/bot/readings/012737962a630f16c33e/index.json"},{"id":"ecef0091a311f725a415","title":"Nuclear operating requirements and lifecycle obligations","human_url":"/library/readings/ecef0091a311f725a415.html","record_url":"/library/bot/readings/ecef0091a311f725a415/index.json"},{"id":"08c49e7ac3fac66f4a7f","title":"Palisades restart work and fuel recovery","human_url":"/library/readings/08c49e7ac3fac66f4a7f.html","record_url":"/library/bot/readings/08c49e7ac3fac66f4a7f/index.json"},{"id":"d360ec4036083caab995","title":"Construction cost example","human_url":"/library/readings/d360ec4036083caab995.html","record_url":"/library/bot/readings/d360ec4036083caab995/index.json"},{"id":"525143541ec150fa850f","title":"Nuclear construction costs and carrying costs through production","human_url":"/library/readings/525143541ec150fa850f.html","record_url":"/library/bot/readings/525143541ec150fa850f/index.json"},{"id":"7c2f259157d822b50750","title":"Large reactor supply chain finance and overlapping frameworks","human_url":"/library/readings/7c2f259157d822b50750.html","record_url":"/library/bot/readings/7c2f259157d822b50750/index.json"},{"id":"a75837866e61214403c7","title":"Nuclear customers finance and electricity costs","human_url":"/library/readings/a75837866e61214403c7.html","record_url":"/library/bot/readings/a75837866e61214403c7/index.json"}],"relations":{"parent_id":null,"rolled_into_id":null,"supersedes_ids":[],"related_ids":["ai-infrastructure-buildout","federal-science-operating-system","federal-fusion-commercialization","genesis-mission","nssts-technology-company-map","us-inbound-investment-industrial-capex","data-center-federal-legal-spine","ai-turbine-asset-management-power-buildout","fortress-america-installation-energy-independence"]},"rule":"Catalog relations are navigation, not proof of a factual connection. Each reading retains its own dates and source limits.","relevance_summary":"/library/bot/summaries/nuclear-infrastructure-buildout.json","human_relevance_summary":"/library/summaries/nuclear-infrastructure-buildout.html"}