As of: 2026-08-17; targeted Reactor reconciliations added 2026-09-07, covering all thirteen original Reactor filings Status: source-first factual spine
Boundary: dates, entities, instruments and legal states first; synthesis belongs in the control-surface map

Object ladder

ObjectDateLegal or administrative stateWhat it can doWhat it cannot do by itself
Science: A New Golden Age2026-07-21OSTP report to the Presidentstate doctrine, diagnose the old model, recommend institutions and horizon systemsappropriate funds, amend statutes, create a blockchain or compel every agency
National Security Science & Technology Strategy2026-08 cover month; exact publication/transmittal clock unresolvednational functional strategy supporting the 2025 NSSselect security missions and CETs; define resilience, acceleration and protection posture; promise OSTP/NSC follow-on plansappropriate funds, assign every agency, prove statutory transmission, operate a platform or advance a named project
NSTM-5 / M-26-162026-07-21joint OSTP–OMB budget memorandumdirect FY2028 budget formulation and require qualifying agencies' implementation plansguarantee Congress funds a proposal or turn speculative report concepts into programs
EO 14363signed 2025-11-24; published 2025-11-28executive ordercharter Genesis Mission and direct DOE to build and operate the American Science and Security Platformoverride appropriations, classification, IP, privacy, export-control or other applicable law
ADVANCE Act section 2052024-07-09enacted statuteamend fusion-machine and fusion-produced byproduct-material definitions and amend the existing NEIMA framework provisionsfinalize the rule or decide any project application
FY2026 Fusion Energy Sciences appropriation2026-01-23enacted appropriation and incorporated explanatory tablefund the FES account, including research and U.S. ITER constructionfund every facility or milestone named in the later roadmap
Type One / Bull Run initial application2026-01-29company-reported initial Tennessee byproduct-material applicationbegin a named project licensing record under an Agreement State frameworkestablish completeness, issuance, inspection, operation or power generation
NRC fusion-machine proposed rule2026-02-26proposed federal rule and draft guidanceopen a technology-neutral federal licensing framework for commentcreate a final effective rule or issue a particular license
Finalized Fusion Science and Technology Roadmap2026-06-09final DOE strategy; no specific funding commitmentcoordinate science, AI/HPC, facilities, public-private programs, workforce, regulation and mid-2030s targetsappropriate funds, issue awards or prove a pilot plant operates
DOE Energy Without Limits thread2026-08-15official communications eventamplify the finalized roadmap and commercialization agendaestablish a new experiment, award, facility, license or electricity result
EO 143322025-08-07executive ordertighten political and annual review of discretionary grants; direct termination and drawdown controlsreplace the statutes authorizing each award or collapse student aid into R&D grants
EO 143182025-07-23executive ordercreate federal support and permitting lanes for qualifying data-center and component projectsapprove every site or erase land, environmental, water, tribal or grid requirements
EO 141562025-01-20national-emergency declarationdirect use of lawful emergency processes for energy supply and infrastructuremake every private data center an emergency facility or supply a missing project authority
DPA section 303 grid determination2026-04-20presidential determinationauthorize purchases, commitments and financial instruments to expand named grid capabilitiesblanket-preempt siting, environmental review, utility jurisdiction or tribal consent

Reactor reconciliation — seven filings reviewed September 7, 2026

Scope: the four May 2025 nuclear orders, the initial DOE pilot selection, the worker-safety comment reopening and NRC Part 53. This addition joins those original Tech questions to selected saved implementation evidence. It does not refresh every nuclear program, the remaining Reactor filings or the original August 17 science chronology.

The original question was how a nuclear revival would move through institutions, testing, fuel, sites and industrial capacity. Those are complementary investigations: an executive direction, a selected pilot, a construction permit and criticality answer different parts of it. The table corrects compressed descriptions while retaining the original dated filings and their thesis lens.

Instrument / primary sourceSource clocksVerified meaning
EO 14300 — NRC reformSigned 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22587–22590.NRC reform direction: decision deadlines and hourly-fee recovery caps require implementation. The approximately 100-to-400 GW aspiration for 2050 is in section 2(c).
EO 14301 — DOE testingSigned 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22591–22593.DOE laboratory testing and the separate outside-laboratory pilot have different processes. The latter requires sufficient DOE control, not DOE ownership of the land; its research jurisdiction excludes commercial electric-power production.
EO 14299 — national-security powerSigned 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22581–22586.Separate Defense and DOE assignments connect national-security missions, sites and fuel. The Defense operating target is September 30, 2028; the DOE first-site goal is thirty months after signing.
EO 14302 — industrial baseSigned 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22595–22599.Fuel-cycle, workforce, financing and voluntary-agreement directions. Section 4(a) targets five GW of uprates and ten large reactors with complete designs under construction by 2030; the 2050 capacity aspiration belongs to EO 14300.
DOE Reactor Pilot selectionsOfficial announcement 2025-08-12; no time established. Criticality target 2026-07-04 is prospective in that source.Eleven projects across ten companies were initially selected; companies bear project costs. Selection and the July 4, 2026 criticality goal do not themselves establish authorization or achievement.
DOE worker-safety comment reopeningOriginal NOPR published 2026-01-21; extension request dated 2026-02-04; reopening signed 2026-02-24; filed 2026-02-25 08:45; published 2026-02-26, 91 FR 9498–9499; comments through 2026-03-23.Reopened comments on the January 21 proposed Part 851 rule through March 23. The AFL-CIO request cited review time and affiliate coordination; it is not itself evidence of substantive opposition or a final rule.
NRC Part 53 final ruleRule dated 2026-03-25; filed 2026-03-27 08:45; published 2026-03-30, 91 FR 15696; effective 2026-04-29. Correction dated 2026-04-09; filed 2026-04-10 08:45; published 2026-04-13; effective 2026-04-29.Optional commercial fission licensing alongside Parts 50 and 52, including light-water designs. Effective April 29; the April 13 correction retained that date. Fusion has a separate rulemaking; this is distinct from the broader EO 14300 overhaul.

For Part 53, see also the April 13 technical correction. For the safety reopening, the January 21 underlying proposal supplies the proposed changes. This reconciliation read the four orders and two short notices in full; Part 53 and the underlying safety proposal received targeted scope, authority and clock checks, not a complete technical review or later-rule census.

Later evidence: a test milestone, construction permissions and fuel production

DOE's August 6 Groves release reports that Oklo's Groves Isotope Test Reactor reached criticality the previous night in Lockhart, Texas. August 5 is inferred from that relative wording; the exact physical time is unstated. DOE calls it the fifth DOE-authorized advanced reactor to reach criticality that summer. This is an attributed program milestone, not an independently reconstructed census. The release describes a future commercial isotope-producing variant still in development; continuous operation, commercial NRC approval, isotope production and delivery are separate findings.

The saved finding belongs to the Chronicle's August 8 Federal Government Weekly Delta — Full Merge, section 2, “Oklo Groves reached criticality.” That inquiry was a bounded whole-government delta through August 8, not a reactor census; its vault landing controls over the workbench wave. The exact DOE release was reread for this reconciliation.

The August 18 energy, manufacturing and materials map asks which companies can turn federal position into accepted output. Its row/source registry preserves three relevant, distinct returns:

Those company findings retain the map's August 18 cutoff. The three selected edges and their source objects were reconciled here; the full registry was not recertified. They do not establish that these projects were authorized under the DOE pilot or caused by the four orders. Fusion's scientific, capital and licensing sequence remains with the existing commercialization bridge and project registry, under their own saved cutoffs.

Reactor licensing paths, hearings, fees and ownership

Reviewed September 7, 2026: the six remaining original Reactor filings. Their questions complement the earlier orders and pilot: which designs can enter a path, what safety evidence carries over, how a decision can be contested, what review costs, and who may own a licensee. Keeping these questions together makes the nuclear-revival thesis testable against particular legal changes and eventual project results.

Filing / original primary sourceDistinct clocksWhat the source establishes
Part 57 microreactor proposalDated 2026-04-29; filed 2026-04-30 08:45; published 2026-05-01, 91 FR 23628–23766. Comments due 2026-06-15 at 23:59 Eastern. Correction filed 2026-05-14 08:45 and published 2026-05-15, 91 FR 27870–27871.Proposed optional microreactor path for qualifying designs, with conditional construction permission and separate operating approval. The May 15 correction does not finalize the framework.
Prior DOE/Defense design evidenceDated 2026-03-31; filed 2026-04-01 08:45; published 2026-04-02, 91 FR 16584–16588. Comments due 2026-05-04.Proposed reuse of tested DOE/Defense safety evidence in NRC review, with a mapping to NRC requirements and changed conditions. Authorization alone does not convert into a commercial license.
Contested adjudications proposalDated 2026-02-27; filed 2026-03-02 08:45; published 2026-03-03, 91 FR 10450. Comments due 2026-04-02.Proposed changes to merits submissions, discovery and contested proceedings. Filing windows vary; appeals sit outside the fixed EO timeline.
Fusion-machine framework proposalDated 2026-02-23; filed 2026-02-25 at 08:45 (timezone not specified in filing line); published 2026-02-26, 91 FR 9476–9498. Comments due 2026-05-27. NRC selected the Part 30 approach on 2023-04-13. NEIMA enacted 2019-01-14 already set 2027-12-31; ADVANCE enacted 2024-07-09 retained that date and separately required a section 205(c) report within one year (2025-07-09). No final-rule effective date established by this proposal.Proposed Part 30 byproduct-material framework, following NRC’s 2023 policy choice and ADVANCE’s substantive definitions. The pre-existing NEIMA deadline and state/project licensing clocks remain separate.
FY2026 fee final ruleDated 2026-06-05; filed 2026-06-15 08:45; published 2026-06-16, 91 FR 36470–36509. General effectiveness 2026-08-17; fixed caps start 2026-10-01. Hourly rates begin with the first full pay period after general effectiveness.Final fee rule generally effective August 17; fixed caps begin October 1. Hourly billing remains. Caps cover requested activities involving a final safety evaluation; decision deadlines are deferred.
Foreign ownership exceptionsProposal and direct final dated 2026-04-06; filed 2026-04-22 08:45; published 2026-04-23. Confirmation dated 2026-06-03; filed 2026-06-04 08:45; published 2026-06-05. Direct final effective 2026-07-07.The companion April 23 direct final rule was confirmed June 5 as effective July 7. Exceptions concern listed eligible foreign interests in utilization facilities, subject to NRC’s non-inimicality determination; production-facility restrictions remain.

The ownership entry has a confirmed later state: the April 23 direct final rule and June 5 confirmation establish July 7 effectiveness. The 37 listed jurisdictions comprise 36 eligible OECD members plus India; the July 9, 2024 statutory sanctions screen excludes Turkey. Eligibility is not evidence of a completed investment or an approved ownership structure. The May 15 Part 57 correction corrects the proposal’s presentation, without establishing adoption.

The fusion proposal connects to the existing February 26 chronology below and the commercialization bridge. NRC had selected its byproduct-material approach in 2023. ADVANCE amended the statutory definitions in 2024; the December 31, 2027 optional-framework deadline originated in NEIMA in 2019. A proposed federal framework, an Agreement State’s effective rules and a particular research machine’s license remain parallel evidence, rather than a single nationwide start date for commercial fusion.

The later Groves, construction and fuel findings in the preceding reconciliation answer different questions from these legal mechanisms. A demonstrated test can inform a review; it does not settle the commercial application. A more predictable cost or ownership route can enable a project; it does not measure construction, financing close or electricity delivery. The existing company and fusion project studies retain their saved implementation cutoffs.

Reading scope: the short prior-design proposal, ownership instruments and confirmation were read substantively; the long Part 57, adjudication, fusion and fee rules received selected scope, authority, clock and operative-clause checks. This is a review of the six original filings and their identified correction/confirmation chain, not a full technical review or a later-finality census of every proposal.

Pre-2025 statutory hinge

September 7 legal attribution correction: the 2027 framework deadline originated in NEIMA section 103(a)(4), 132 Stat. 5572. ADVANCE section 205, 138 Stat. 1460–1462 amended definitions and related provisions and required a separate report; it did not originate that deadline. The source chronology and forward clock below now use that attribution. This targeted correction does not advance other evidence cutoffs.

2024-07-09 — ADVANCE Act supplies fusion definitions within the existing NEIMA framework

Entity: Congress; President; Nuclear Regulatory Commission Clock: statute / federal rulemaking State after: Atomic Energy Act definitions amended; existing NEIMA December 31, 2027 framework deadline retained

Section 205 of Public Law 118-67 added the term fusion machine to the Atomic Energy Act and brought radioactive material produced by a fusion machine into the byproduct-material definition. The December 31, 2027 optional-framework deadline already existed in NEIMA section 103(a)(4), enacted in 2019; ADVANCE section 205(b) amended the related provisions and terminology. Section 205(c) separately required a mass-manufactured-fusion licensing report within one year. These provisions do not themselves create a final rule or project license.

Sources: Public Law 118-67 · NRC — Fusion and the ADVANCE Act · NRC fusion FAQ

2025

2025-01-20 — national energy emergency declared

Entity: President; executive departments and agencies
Clock: emergency / energy infrastructure
State after: active national-emergency framework

Executive Order 14156 identifies inadequate energy production, transportation and infrastructure as an unusual and extraordinary threat. It directs agencies to use lawful emergency permitting and other authorities to facilitate energy supply. The order repeatedly limits action to what existing law permits.

Source: White House — Declaring a National Energy Emergency

2025-04-23 — accreditation and institutional-value clock separated from research funding

Entity: President; Department of Education; recognized accreditors
Clock: accreditation / Title IV institutional eligibility
State after: policy direction toward student-oriented quality and value

Executive Order 14279 directs the Education Department to realign recognition of accreditors toward high-quality, high-value programs and new educational models. This is an institutional-eligibility and student-aid lane. It is adjacent to, but legally distinct from, agency R&D awards.

Source: White House — Executive Order 14279 PDF

2025-07-23 — qualifying data-center infrastructure receives an acceleration lane

Entity: President; Commerce; Energy; Interior; Defense; EPA; CEQ; Permitting Council
Clock: siting / finance / permitting
State after: federal priority and support pathway

Executive Order 14318 defines qualifying projects using alternative thresholds: at least $500 million in committed capital expenditure, more than 100 MW of incremental electric load, protection of national security, or designation by a named Secretary. It directs an initiative that may use loans, guarantees, grants, tax incentives and offtake agreements, plus federal permitting and land actions.

The order covers associated power and technology components. It does not identify every qualifying project or approve any particular parcel.

Source: White House — Accelerating Federal Permitting of Data Center Infrastructure

2025-08-07 — discretionary grant oversight shifts toward priority and progress review

Entity: President; OMB; grantmaking agencies
Clock: award design / annual review / termination
State after: senior-appointee review and stronger progress controls directed

Executive Order 14332 directs pre-issuance senior-appointee review of funding opportunities and discretionary awards, annual review for consistency with agency priorities and substantial progress, and revised terms permitting termination when an award no longer advances agency priorities or the national interest. It also directs tighter drawdown authorization and limits on facilities-and-administration costs.

Source: White House — Improving Oversight of Federal Grantmaking

2025-11-24 — Genesis Mission chartered

Entity: President; DOE; OSTP; OMB; NSTC; participating agencies
Clock: platform / mission / interagency integration
State after: operative executive direction

Executive Order 14363 establishes the Genesis Mission and directs DOE to establish the American Science and Security Platform. The platform is to integrate:

The order also directs metadata and provenance work; coordinated funding opportunities and prizes; fellowships, internships and apprenticeships; standard partnership, data-use and model-sharing agreements; and policies for ownership, licensing, trade secrets and commercialization of AI-directed experimental results.

Every major command is bounded by applicable law, security requirements and available appropriations.

Source: Federal Register — EO 14363

2026

2026-01-20 — DOE frames Tribes as data-center counterparties

Entity: DOE Office of Indian Energy; Tribal Nations and enterprises
Clock: tribal market development
State after: federal opportunity framing

DOE identifies possible tribal roles beyond land leasing: power sales, long-term operations and infrastructure ownership. It also identifies water, community impacts, transmission, interconnection and fiber as constraints. No Tribe is committed by this publication.

Source: DOE — Data Centers: Exploring the Opportunity for Tribes

2026-01-23 — Fusion Energy Sciences receives enacted FY2026 account funding

Entity: Congress; President; DOE Office of Science; Fusion Energy Sciences Clock: appropriation / account allocation State after: enacted FY2026 funding; program and project states remain separate

Public Law 119-74 enacted the FY2026 Energy and Water division. The final explanatory table allocates $805.657 million to Fusion Energy Sciences: $634.973 million for research and $170.684 million for U.S. ITER construction. The account total demonstrates appropriated public research capital. It does not fund every facility, public-private program or 2030s milestone later mapped by DOE.

Sources: Public Law 119-74 · FY2026 Energy and Water explanatory statement

2026-01-29 — initial Bull Run fusion-license application reported submitted

Entity: Type One Energy; Tennessee Valley Authority; Tennessee Department of Environment and Conservation Clock: project licensing / initial application State after: company-reported initial byproduct-material application submitted

Type One Energy reports that it and TVA made an initial submission in preparation for licensing the Bull Run project under Tennessee's Agreement State authority. The announcement says the application lays groundwork for subsequent submissions. The source does not establish completeness acceptance, a completed review, an issued license, inspection, operating authorization or electricity production.

This project clock is parallel to NRC's federal rulemaking clock; NRC states that commercial fusion development is already occurring in and regulated by Agreement States.

Sources: Type One — initial Bull Run licensing application · NRC fusion FAQ

2026-02-26 — NRC opens the proposed federal fusion-machine framework

Entity: Nuclear Regulatory Commission Clock: proposed rule / federal licensing framework State after: proposed rule and draft consolidated guidance published

NRC published a proposed technology-neutral framework for fusion machines and draft consolidated materials-licensing guidance. The 90-day comment period closed May 27. Proposal, final rule, effective date, license application, issued license and operating authorization remain separate states. Federal rulemaking, Agreement State frameworks and individual project applications are parallel clocks, not one mandatory sequence.

Source: NRC — fusion-machine rulemaking status

2026-03-17 — Genesis RFA defines the fusion DCP work program

Entity: DOE; Office of Science; Genesis Mission Clock: funding opportunity / application process State after: cross-domain RFA opened; no recipient award or platform access

DOE announced an anticipated $293.76 million across all Genesis subjects, not fusion alone. The RFA describes Phase I awards of $500,000–$750,000 for nine months and Phase II awards of $6–$15 million over three years. It makes the fusion DCP concrete through materials datasets, digital twins, real-time control, tritium/accountancy models, blanket databases, whole-plant repositories and remote-maintenance tools. Laboratory work may use Field Work Proposals and non-laboratory awards may use Other Transaction Authority, so one federal award database cannot by itself prove complete execution.

Sources: DOE RFA announcement · full RFA

2026-04-20 — grid equipment enters the DPA Title III capacity lane

Entity: President; Secretary of Energy
Clock: industrial capacity / grid
State after: DPA section 303 mobilization authority activated for the named capacity field

The presidential determination finds transformers, transmission lines, conductors, substations, high-voltage circuit breakers, power electronics and related inputs essential to national defense. It authorizes purchases, commitments and financial instruments to expand domestic capability.

The object is grid infrastructure and its supply chain—not every project that consumes electricity.

Source: White House — DPA grid-infrastructure determination

2026-04-28 — CFS enters the PJM interconnection process

Entity: Commonwealth Fusion Systems; PJM Interconnection Clock: project grid application State after: company application publicly announced; fusion independently confirmed among Cycle 1 applicants

CFS says it submitted the proposed ARC/Fall Line plant to PJM's Cycle 1 interconnection process. PJM independently confirmed that fusion was among the more than 800 Cycle 1 project applications. Application, queue validation, studies, executed agreement, upgrades, synchronization and export remain separate. This is the strongest current U.S. fusion grid-development atom, not evidence that ARC is connected or operating.

Sources: CFS application announcement · PJM confirmation

2026-05-14 — NSF announces X-Labs

Entity: National Science Foundation
Clock: institutional model / award opportunity
State after: announced funding initiative

NSF announces up to $1.5 billion over a decade for independent, milestone-driven research teams outside traditional institutions. The first topics concern scientific instrumentation and quantum interconnects. This is direct evidence that federal science funding is opening a lane beyond the conventional university principal-investigator laboratory.

Source: NSF — X-Labs initiative

2026-06-04 — U.S.–Japan Genesis partnership includes fusion

Entity: DOE; Japan MEXT; Japan METI; participating laboratories and institutions Clock: international partnership plan / future appropriations State after: planned five-year collaboration announced

DOE and the Japanese ministries announced a planned combined $1 billion over five years, split equally and subject to future appropriations. Eleven joint teams are intended to connect twelve DOE national laboratories, one Office of Science user facility and twelve Japanese institutions across fusion, quantum, biotechnology, advanced materials, particle physics and autonomous laboratories. The announcement is an institutional and funding plan, not proof of a fusion facility, experiment or payment under a specific joint project.

Source: DOE — U.S.–Japan Genesis partnership

2026-06-09 — DOE finalizes the fusion roadmap

Entity: DOE Office of Fusion; Fusion Energy Sciences; industry; national laboratories; universities Clock: strategy / metrics / implementation coordination State after: final Build-Innovate-Grow roadmap published

DOE's 122-page Fusion Science and Technology Roadmap combines public infrastructure, foundational research, high-performance computing, AI, digital twins, public-private programs, supply chains, workforce, standards and commercialization. It maps six technical challenge areas and near-, mid- and long-term milestones toward private pilot plants and grid delivery in the mid-2030s.

The roadmap expressly commits no specific funding. Support remains contingent on future public-private partnerships and congressional appropriations. Its facility map also distinguishes existing, enhanced, under-construction, planned and gap-identified capabilities.

On the same date, Tennessee's technology-neutral Agreement State fusion-machine rules became effective. Type One had already reported an initial project application on January 29; the effective framework, application, review and license disposition remain separate states.

Sources: DOE — finalized roadmap release · DOE — full roadmap · Tennessee — fusion regulations

2026-06-18 — FERC opens the six-grid-operator speed-to-power proceeding

Entity: FERC; six jurisdictional regional grid operators; transmission owners
Clock: tariff / interconnection / ratepayer protection
State after: show-cause and tariff-reform proceedings opened

FERC directs all six regional operators to justify or reform large-load tariffs. The stated categories include application and study processes, cost shifting, co-location, flexible-load service and study of generation serving nearby or co-located load. This is a tariff process, not an automatic interconnection approval.

Source: FERC — large-load integration orders

2026-06-19 — WHAM directly converts plasma kinetic energy to electricity

Entity: Realta Fusion; University of Wisconsin–Madison; WHAM Clock: physical experiment / power-conversion rung State after: several-hundred-watt-scale direct-energy conversion demonstrated

A converter installed on WHAM drew multiple amps at about 100 volts during plasma operation. Realta says this could illuminate a few lightbulbs, but also states that most converted energy was supplied plasma-heating input and that the experiment was neither net-electricity production nor large-scale conversion of fusion-born power. This is a physical intermediate rung between plasma operation and future power conversion, below engineering gain and grid delivery. The experiment time is not public; the technical release was published June 30 at 7:00 a.m. ET.

Sources: Realta technical account · exact publication clock

2026-06-20 — NIF records its eleventh ignition

Entity: Lawrence Livermore National Laboratory; National Ignition Facility Clock: experimental result / target-gain measurement State after: repeated laboratory ignition record extended

LLNL reports a 7.9 MJ yield with ±0.4 MJ measurement uncertainty and approximately 3.8 target gain. Target gain compares fusion yield with laser energy delivered to the target. It does not count the facility's total energy use and is not engineering breakeven, electricity or grid delivery.

Source: LLNL — achieving fusion ignition

2026-07-21 — Science: A New Golden Age transmitted

Entity: OSTP Director Michael Kratsios; President
Clock: doctrine / recommendation
State after: official White House design map

The report calls for:

Its horizon section imagines blockchain contribution records, DAOs, distributed ledgers, smart-contract milestone payments, agent microtransactions and cloud laboratories. The report expressly says the combined system does not yet exist in mature form.

Source: White House — Science: A New Golden Age

2026-07-21 — FY2028 memorandum converts doctrine into agency instructions

Entity: OSTP; OMB; executive departments and agencies
Clock: budget formulation / program implementation
State after: operative administrative guidance

NSTM-5 / M-26-16 directs agencies to reflect the priorities in FY2028 budget submissions. It identifies Genesis support as a central R&D priority and directs attention to scientific foundation models, dataset curation, industrial-scale data capture, open instrument interfaces, standardized data formats, advanced compute and autonomous closed-loop laboratories.

The memorandum also instructs agencies to consider portable direct funding, cross-sector placements, milestone reviews, fast grants, prizes, advanced market commitments, regranting, quadratic funding and eigenfunding. These mechanisms remain bounded by agency authority, conflict rules, scientific rigor and appropriations.

Source: White House — NSTM-5 / M-26-16

2026-07-22 — Genesis selects 278 projects for negotiations

Entity: DOE; Genesis Mission; selected laboratories, universities and companies Clock: selection / award negotiation State after: named cross-domain portfolio selected; executed awards and operating access unproven

The list includes fusion-design orchestration, control twins, materials, REBCO/magnet manufacturing, a D-T process-loop replica, a multimodal multi-device foundation model, plant lifecycle engineering, Realta neutral-beam optimization, gyrotrons, target manufacturing, diagnostic edge AI, lithium-isotope separation, blanket/neutronics work and alloy scale-up. DOE's disclaimer controls: all 278 are selections for negotiation. The list supplies neither a phase nor an amount for each project, and prospective platform access is not proof of an executed OTA/FWP, logged workflow or physical result.

Sources: DOE announcement · project list

2026-08-15 — DOE activates Energy Without Limits

Entity: Department of Energy Clock: communications / agenda amplification State after: finalized fusion roadmap reactivated in official public messaging

At 1:34:04.501 p.m. EDT, DOE published a three-post, five-card X thread describing fusion, the theoretical energy-density comparison with fission, national-lab research and the June 9 roadmap. The three-post sequence spans 2.765 seconds. Its official payloads provide no geotag, place or coordinates. The thread contains no outbound source link and announces no new experimental, funding, regulatory, facility or electricity object. It is an atomic narrative event attached to the June 9 policy anchor.

Sources: DOE X — main post · continuation · final card · date/time/place ledger

2026-08 — National Security Science & Technology Strategy becomes public

Entity: President; White House Office of Science and Technology Policy Clock: strategy / doctrine; cover month only; public availability verified 2026-08-17 State after: national-security mission, resilience, acceleration and protection layer added to federal S&T doctrine

The 24-page strategy supports the 2025 National Security Strategy, says it satisfies 42 U.S.C. § 19221 and complements NSTM-5 FY2028 R&D priorities. It organizes national-security S&T around four qualities—focused, resilient, agile and secure—and five means: workforce, R&D infrastructure, federal R&D funding, non-Federal partnerships and allies or partners.

The strategy prioritizes battlefield and homeland missions, a national resilience architecture, acquisition and regulatory acceleration, research security, inbound and outbound investment control, export and sensitive-data protection, development-stage funding logic and later OSTP/NSC CET-specific plans. Appendix A updates the 14-family CET list; Appendix B maps those families to battlefield, homeland and transformative needs.

The strategy contains no appropriation, agency-by-agency owner matrix, implementation deadline, metric or reporting cadence. The cover says only August 2026. PDF creation metadata dated August 14 is not an authoritative publication, signature or transmittal clock and must not be point-charted.

Sources: official PDF · full-reading delta · preserved source record

Forward clocks created by the source instruments

Unresolved — § 19221 findings report and Congressional transmittal

Congress records transmission of the 2025 National Security Strategy on 2025-12-04. The 90-day calendar date was 2026-03-04. The public August NSSTS does not include a signed transmittal, receipt record or the separate findings report contemplated by 42 U.S.C. § 19221. An earlier or nonpublic submission may exist; do not convert public non-detection into a final noncompliance ruling.

2026-08-21 — Genesis initial-operating-capability target

EO 14363 directs DOE, within 270 days of November 24, 2025 and subject to available appropriations, to seek an initial operating capability of the American Science and Security Platform for at least one national challenge. The August 15 fusion thread does not identify the challenge, platform assets, users, access rules, completed test or operating result and therefore does not satisfy this clock by itself.

2026-10-19 — qualifying agency action plans due

The memorandum requires the head of each agency with at least $3 billion in FY2026 R&D budget authority to submit an action plan within 90 days. Each plan must identify specific actions, implementation timelines and responsible offices for the four R&D priority-practice groups. October 19 is the calendar date 90 days after July 21; verify any OMB interpretation or extension before treating a later filing as delinquent.

FY2028 budget process — program requests become appropriations asks

Agency submissions should show proposed shifts in portfolio composition, Genesis contributions, infrastructure investment, talent programs, funding pilots, cost shares and regional co-location. A budget request is not an appropriation, award or operating capability.

2026-11-24 — first Genesis annual report due under EO 14363

EO 14363 requires DOE to report within one year of the order and annually thereafter on platform status, integration, user engagement, measurable outcomes, partnerships and authority needs. Public availability is not guaranteed by the order.

2027-12-31 — existing NEIMA technology-inclusive framework deadline

NEIMA section 103(a)(4), enacted in 2019 and subsequently amended by ADVANCE, sets this optional technology-inclusive framework deadline. ADVANCE section 205 did not create the date; its mass-manufactured-fusion report is a separate duty. A final rule, its effective date, Agreement State implementation and individual project dispositions must still be recorded separately.

Clock rule

The companion

`FEDERAL_FUSION_DATE_TIME_PLACE_LEDGER_2020-2035.md`

preserves each source clock, timezone, locus, precision defect and later D.C. chart convention without calculating or interpreting a chart.

The object-level states, eight-company field map and award-accounting chain live in

`FEDERAL_FUSION_PROJECT_CAPITAL_REGULATORY_REGISTRY_2022-2035.md`.

Never compress these into one “launch” date:

report -> memorandum -> agency plan -> budget request -> appropriation -> funding opportunity -> award or contract -> platform integration -> test -> operating capability -> verified result -> payment or commercialization

For fusion, preserve interacting but parallel clocks:

Those lanes converge at a named project's licensed, interconnected and measured commercial operation; none is evidence that the others have completed.

Sources

Full saved reading

View cited sources (59)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.