National security technology WAVE 2 ENERGY MANUFACTURING CRITICAL MATERIALS REGISTRY 2026-08-18
{
"registry_id": "nssts-company-map-wave-2-2026-08-18",
"title": "NSSTS Technology-to-Company Map — Wave 2",
"as_of": "2026-08-18",
"status": "active_workbench_research",
"scope": [
"energy systems, grid hardware, advanced fission and fusion",
"critical-mineral processing, qualified materials and component supply chains",
"advanced manufacturing, industrial digital twins, robotics, metrology and qualification"
],
"governance": {
"separate_from_federal_group": true,
"vault_or_observatory_promotion_authorized": false,
"technical_fit_and_acquisition_path_are_independent": true,
"investment_recommendation": false
},
"visual_bands": [
{
"id": "confirmed",
"label": "Confirmed performers and federal anchors"
},
{
"id": "acquisition_near",
"label": "Acquisition-near and strongly positioned"
},
{
"id": "installed_stack",
"label": "Installed-stack and bottleneck suppliers"
},
{
"id": "blocked",
"label": "Expired, blocked or contradicted paths"
}
],
"sources": [
{
"id": "w2-src-48c",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "Applicant self-disclosed 48C projects",
"url": "https://www.energy.gov/cmei/manufacturing/applicant-self-disclosed-48c-projects",
"source_type": "official_tax_credit_project_list",
"limit": "Allocation or self-disclosure is not factory completion, qualification or delivery."
},
{
"id": "w2-src-fitt",
"date": "2026-06-18",
"issuer": "U.S. Department of Energy",
"title": "Transformer resilience and reliability project selections",
"url": "https://www.energy.gov/oe/articles/energy-department-advances-us-electric-grid-resilience-and-reliability-new-transformer",
"source_type": "official_project_selection",
"limit": "Selection establishes a funded development path, not field acceptance."
},
{
"id": "w2-src-eaton",
"date": "2025-10-14",
"issuer": "Eaton",
"title": "Eaton begins production at expanded Texas manufacturing facility",
"url": "https://www.eaton.com/us/en-us/company/news-insights/news-releases/2025/eaton-begins-production-at-newly-expanded-texas-manufacturing-facility.html",
"source_type": "company_operating_record",
"limit": "Company-reported production and first shipment; not a federal-site delivery."
},
{
"id": "w2-src-prolec",
"date": "2026-03-04",
"issuer": "Prolec GE",
"title": "Shreveport facility expansion completion",
"url": "https://www.prolec.energy/news/prolec-ge-celebrates-completion-of-shreveport-facility-expansion-in-support-of-u-s-energy-transition-goals/",
"source_type": "company_operating_record",
"limit": "Company-reported line start and added capacity; no named federal end customer."
},
{
"id": "w2-src-makeit",
"date": "2026-01-22",
"issuer": "U.S. Department of Energy",
"title": "MAKE IT Prize winners",
"url": "https://www.energy.gov/technologycommercialization/articles/doe-awards-15-million-prize-winners-domestic-clean-energy",
"source_type": "official_prize_award",
"limit": "Prize award does not prove full-rate manufacturing or field acceptance."
},
{
"id": "w2-src-grip",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "GRIP program projects and status table",
"url": "https://www.energy.gov/oe/grid-resilience-and-innovation-partnerships-grip-program-projects",
"source_type": "official_status_table",
"limit": "Selected and awarded states must remain distinct."
},
{
"id": "w2-src-tfp",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "Transmission Facilitation Program selections",
"url": "https://www.energy.gov/oe/transmission-facilitation-program-selections",
"source_type": "official_project_selection",
"limit": "Capacity-contract selection does not establish execution, financing or construction."
},
{
"id": "w2-src-terrapower",
"date": "2026-03-09",
"issuer": "U.S. Department of Energy",
"title": "NRC construction permit for TerraPower Natrium",
"url": "https://www.energy.gov/ne/articles/nrc-issues-construction-permit-terrapowers-natrium-advanced-reactor",
"source_type": "official_licensing_record",
"limit": "Construction authorization is not an operating license, fuel availability or generation."
},
{
"id": "w2-src-xenergy",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "X-energy and TRISO-X ARDP relationship",
"url": "https://www.energy.gov/ne/articles/x-energys-triso-x-fuel-fabrication-facility-produce-fuel-advanced-nuclear-reactors",
"source_type": "official_program_record",
"limit": "Award relationship and construction activity do not prove licensed commercial fuel output."
},
{
"id": "w2-src-kairos",
"date": "2026-08-18",
"issuer": "U.S. Nuclear Regulatory Commission",
"title": "Kairos Hermes licensing record",
"url": "https://www.nrc.gov/reactors/non-power/new-facility-licensing/hermes-kairos",
"source_type": "official_licensing_record",
"limit": "Construction permits do not establish operating authorization or criticality."
},
{
"id": "w2-src-smr-select",
"date": "2025-12-02",
"issuer": "U.S. Department of Energy",
"title": "TVA and Holtec Gen III+ SMR selections",
"url": "https://www.energy.gov/articles/energy-department-selects-tva-and-holtec-advance-deployment-us-small-modular-reactors",
"source_type": "official_project_selection",
"limit": "Selection for funding is not construction, licensing or operation."
},
{
"id": "w2-src-tva",
"date": "2026-05-12",
"issuer": "U.S. Department of Energy",
"title": "NRC dockets TVA BWRX-300 construction-permit application",
"url": "https://www.energy.gov/ne/articles/nrc-dockets-construction-permit-application-tva-small-modular-reactor",
"source_type": "official_licensing_record",
"limit": "Docketing begins review; it is not a permit or equipment order."
},
{
"id": "w2-src-gen3",
"date": "2026-05-29",
"issuer": "U.S. Department of Energy",
"title": "Gen III+ nuclear supply-chain selections",
"url": "https://www.energy.gov/articles/energy-department-awards-94-million-american-companies-help-expedite-deployments-small",
"source_type": "official_project_selection",
"limit": "Selection and cost share do not prove installed or qualified capacity."
},
{
"id": "w2-src-st40",
"date": "2026-06-24",
"issuer": "U.S. Department of Energy",
"title": "DOE-DESNZ-Tokamak Energy ST40 partnership",
"url": "https://www.energy.gov/science/articles/doe-partners-uks-desnz-and-tokamak-energy-ltd-accelerate-fusion-energy-development",
"source_type": "official_partnership",
"limit": "The facility exists; the upgrade and later outputs remain future milestones."
},
{
"id": "w2-src-fusion-progress",
"date": "2026-07-22",
"issuer": "U.S. Department of Energy",
"title": "Fusion Milestone Program progress and FIRE selections",
"url": "https://www.energy.gov/articles/us-department-energy-announces-selectees-107-million-fusion-innovation-research-engine",
"source_type": "official_program_status",
"limit": "Program participation and selected projects do not establish pilot-plant operation."
},
{
"id": "w2-src-mp",
"date": "2026-08-06",
"issuer": "MP Materials Corp.",
"title": "MP Materials Q2 2026 production and qualification state",
"url": "https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results",
"source_type": "company_operating_record",
"limit": "Startup manufacture and customer qualification are not sustained commercial magnet output."
},
{
"id": "w2-src-mp-dow",
"date": "2025-07-10",
"issuer": "U.S. Department of War",
"title": "OSC loan agreement with MP Materials",
"url": "https://www.war.gov/News/Releases/Release/Article/4270722/office-of-strategic-capital-announces-first-loan-through-dod-agreement-with-mp/",
"source_type": "official_finance_instrument",
"limit": "Loan and public-private support do not prove 10X construction or production."
},
{
"id": "w2-src-dla-magnets",
"date": "2026-05-26",
"issuer": "U.S. Department of War",
"title": "DLA rare-earth magnet block delivery orders",
"url": "https://www.war.gov/News/Contracts/Contract/Article/4500905/contracts-for-may-26-2026/",
"source_type": "official_contract_award",
"limit": "Orders establish acquisition; completion, acceptance and recurring options remain separate."
},
{
"id": "w2-src-usar",
"date": "2026-06-03",
"issuer": "National Institute of Standards and Technology",
"title": "Definitive CHIPS agreement with USA Rare Earth",
"url": "https://www.nist.gov/news-events/news/2026/06/department-commerces-chips-program-finalizes-definitive-agreement-usa-rare",
"source_type": "official_final_agreement",
"limit": "Final agreement does not collapse commissioned, planned and producing sites."
},
{
"id": "w2-src-energyfuels",
"date": "2026-07-29",
"issuer": "Energy Fuels Inc.",
"title": "Commercial-scale heavy rare-earth plant under construction",
"url": "https://investors.energyfuels.com/2026-07-29-Commercial-Scale-Heavy-Rare-Earth-Plant-Now-Under-Construction-in-Utah",
"source_type": "company_construction_record",
"limit": "Construction and current NdPr capability do not prove commercial Dy/Tb shipments."
},
{
"id": "w2-src-reelement",
"date": "2026-07-13",
"issuer": "U.S. Department of War",
"title": "$25 million investment in ReElement Technologies",
"url": "https://www.war.gov/News/Releases/Release/Article/4541423/department-of-war-announces-25-million-investment-with-reelement-technologies-t/",
"source_type": "official_investment",
"limit": "Investment funds expansion; installed capacity and qualified output remain future gates."
},
{
"id": "w2-src-syrah",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "Syrah Vidalia active-anode-material loan",
"url": "https://www.energy.gov/edf/syrah-vidalia",
"source_type": "official_closed_loan",
"limit": "Operating facility and federal capital do not prove customer-accepted recurring volumes."
},
{
"id": "w2-src-thacker",
"date": "2026-08-18",
"issuer": "U.S. Department of Energy",
"title": "Thacker Pass loan and borrower record",
"url": "https://www.energy.gov/edf/thacker-pass",
"source_type": "official_closed_loan",
"limit": "Construction-stage finance does not establish battery-grade production."
},
{
"id": "w2-src-5n",
"date": "2026-01-29",
"issuer": "U.S. Department of War",
"title": "Germanium refining-capacity investment in 5N Plus",
"url": "https://www.war.gov/News/Releases/Release/Article/4393075/department-of-war-invests-181m-to-increase-us-refining-capacity-for-germanium-m/",
"source_type": "official_award",
"limit": "Expansion award does not prove commissioned 20-tonne capacity."
},
{
"id": "w2-src-lattice",
"date": "2025-12-22",
"issuer": "U.S. Department of War",
"title": "Germanium and silicon optics investment in Lattice Materials",
"url": "https://www.war.gov/News/Releases/Release/Article/4366365/department-of-war-invests-185-million-to-expand-germanium-and-silicon-optics-pr/",
"source_type": "official_award",
"limit": "Award does not prove new equipment commissioning or qualified output."
},
{
"id": "w2-src-elementus",
"date": "2025-11-20",
"issuer": "U.S. Department of War",
"title": "Domestic gallium demonstration award to ElementUS",
"url": "https://www.war.gov/News/Releases/Release/Article/4338685/department-of-defense-awards-299-million-to-create-a-us-domestic-supply-of-gallium/",
"source_type": "official_award",
"limit": "Demonstration funding is not commercial-scale gallium production."
},
{
"id": "w2-src-crucible",
"date": "2025-12-17",
"issuer": "National Institute of Standards and Technology",
"title": "CHIPS award to Crucible Metals",
"url": "https://www.nist.gov/news-events/news/2025/12/department-commerce-awards-chips-incentives-subsidiary-korea-zinc-crucible",
"source_type": "official_final_award",
"limit": "Award supports a planned integrated platform; commissioning remains years away."
},
{
"id": "w2-src-antimony",
"date": "2026-03-17",
"issuer": "U.S. Department of War",
"title": "Domestic antimony production and expansion award",
"url": "https://www.war.gov/News/Releases/Release/Article/4421101/department-of-war-invests-27m-for-the-domestic-excavation-extraction-processing/",
"source_type": "official_award",
"limit": "Milestone award and existing refinery do not prove sustained domestic-mine feed."
},
{
"id": "w2-src-haleu",
"date": "2026-07-01",
"issuer": "U.S. Department of Energy",
"title": "HALEU enrichment services program",
"url": "https://www.energy.gov/ne/haleu-enrichment-services",
"source_type": "official_contract_program",
"limit": "Task orders establish a federal path; demo production is not expanded commercial scale."
},
{
"id": "w2-src-gothaam",
"date": "2026-08-18",
"issuer": "America Makes / NCDMM",
"title": "GOTHAAM project-call winner",
"url": "https://www.americamakes.us/america-makes-announces-winner-of-gothaam-project-call-worth-5-5m-in-funding/",
"source_type": "official_institute_selection",
"limit": "GA-ASI is the winner and named partners are team members; partner workshare is not disclosed."
},
{
"id": "w2-src-jaqs",
"date": "2026-05-19",
"issuer": "America Makes / NCDMM",
"title": "JAQS-SQ project-call winners",
"url": "https://www.manufacturingusa.com/news/america-makes-announces-winners-jaqs-sq-project-call-worth-17m-funding",
"source_type": "official_institute_selection",
"limit": "Selection establishes a qualification project, not completed supplier approval."
},
{
"id": "w2-src-afrl",
"date": "2025-09-22",
"issuer": "Air Force Research Laboratory",
"title": "Active OTSB and small-business contracts portfolio",
"url": "https://www.afrl.af.mil/Portals/90/Documents/SB/AFRL_Active_OTSB-SB_Contracts.pdf",
"source_type": "official_contract_portfolio",
"limit": "Portfolio is a dated snapshot; later modifications or terminations may not appear."
},
{
"id": "w2-src-arm",
"date": "2025-12-16",
"issuer": "Advanced Robotics for Manufacturing Institute",
"title": "ARM 25-01 selected projects",
"url": "https://arminstitute.org/news/25-01-selections/",
"source_type": "official_institute_selection",
"limit": "Selected team status does not disclose final agreement or company workshare."
},
{
"id": "w2-src-sedaro",
"date": "2025-04-30",
"issuer": "U.S. Department of War",
"title": "Sedaro rocket-propulsion digital-twin IDIQ",
"url": "https://www.war.gov/News/Contracts/Contract/Article/4170827/contracts-for-apr-30-2025/",
"source_type": "official_contract_award",
"limit": "IDIQ ceiling is not task-order revenue; only the award obligation is confirmed."
},
{
"id": "w2-src-hicam",
"date": "2026-06-22",
"issuer": "NASA",
"title": "HiCAM Advanced Composites Consortium",
"url": "https://www.nasa.gov/directorates/armd/aavp/hicam/advanced-composites-consortium/",
"source_type": "official_program_roster",
"limit": "Membership establishes transition proximity, not a company-specific award."
},
{
"id": "w2-src-qtime",
"date": "2026-02-10",
"issuer": "America Makes / NCDMM",
"title": "QTIME additive-manufacturing inspection winners",
"url": "https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/",
"source_type": "official_institute_selection",
"limit": "Award lead status does not establish completed NDI qualification."
},
{
"id": "w2-src-smart-closed",
"date": "2026-08-18",
"issuer": "National Institute of Standards and Technology",
"title": "SMART USA funding opportunity terminated",
"url": "https://www.nist.gov/chips/r%2526d-funding-opportunities/notice-funding-opportunity-chips-manufacturing-usa-institute",
"source_type": "official_termination_notice",
"limit": "The institute's prior solicitation and roster are historical, not a live acquisition path."
}
],
"edges": [
{
"inference_id": "w2-energy-eaton-001",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"advanced manufacturing and materials",
"nuclear energy"
],
"mission": "Expand resilient grid capacity for industrial and AI loads",
"required_capability": "domestic distribution transformers, voltage regulation and field-qualified hybrid transformers",
"federal_owner": "DOE Office of Electricity / Treasury",
"federal_program_or_facility": "48C manufacturing allocation and FITT transformer program",
"anticipated_instrument": "tax-credit allocation plus selected field demonstration",
"company_legal_entity": "Eaton Corporation",
"company_display_name": "Eaton",
"company_role": "transformer and voltage-regulation manufacturer",
"relationship_state": "operating_factory_and_selected_field_project",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-48c",
"w2-src-fitt",
"w2-src-eaton"
],
"contrary_signal_ids": [],
"inference_boundary": "Production and first shipment are confirmed; no named federal-campus delivery or accepted FITT deployment is public.",
"missing_gate": "Public utility field acceptance and named federal or AI-site customer.",
"upgrade_trigger": "Accepted FITT demonstration or disclosed project delivery.",
"downgrade_trigger": "Field failure, program cancellation or production not converting to deliveries.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-siemens-002",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Increase large-load interconnection capacity",
"required_capability": "large power transformers manufactured domestically",
"federal_owner": "Treasury / DOE",
"federal_program_or_facility": "48C applicant project list",
"anticipated_instrument": "allocated manufacturing tax credit",
"company_legal_entity": "Siemens Energy, Inc.",
"company_display_name": "Siemens Energy",
"company_role": "large-power-transformer manufacturer",
"relationship_state": "factory_under_construction",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-48c"
],
"contrary_signal_ids": [],
"inference_boundary": "The federal manufacturing bridge is confirmed; Charlotte production had not begun at cutoff.",
"missing_gate": "Factory completion, product qualification and first delivery.",
"upgrade_trigger": "Late-2026 production start and named utility order.",
"downgrade_trigger": "Schedule slip, certification failure or scope reduction.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-prolec-003",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Expand distribution and substation capacity",
"required_capability": "substation, pad-mount and network transformers",
"federal_owner": "Treasury / DOE",
"federal_program_or_facility": "48C applicant project list",
"anticipated_instrument": "allocated manufacturing tax credit",
"company_legal_entity": "Prolec GE USA LLC",
"company_display_name": "Prolec GE USA",
"company_role": "distribution-transformer manufacturer",
"relationship_state": "operating_expanded_factory",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-48c",
"w2-src-prolec"
],
"contrary_signal_ids": [],
"inference_boundary": "Expanded production is confirmed; a named federally bridged end customer is not.",
"missing_gate": "Project-level customer and delivery record.",
"upgrade_trigger": "Award or delivery into a GRIP, TFP or federal-site project.",
"downgrade_trigger": "Underuse, customer-qualification failure or line disruption.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-gevernova-004",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"advanced manufacturing and materials",
"future computing"
],
"mission": "Make the grid more controllable and resilient",
"required_capability": "solid-state and universal-spare transformer technologies",
"federal_owner": "DOE Office of Electricity / CESER",
"federal_program_or_facility": "FITT transformer projects",
"anticipated_instrument": "selected cost-shared R&D and deployment projects",
"company_legal_entity": "GE Vernova Operations LLC",
"company_display_name": "GE Vernova",
"company_role": "grid-equipment developer and industrial validator",
"relationship_state": "selected_transformer_projects",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-fitt"
],
"contrary_signal_ids": [],
"inference_boundary": "Two selected transformer projects are real; qualification and manufacturing scale are not.",
"missing_gate": "Full-scale utility deployment and accepted test results.",
"upgrade_trigger": "Public commissioning and performance acceptance.",
"downgrade_trigger": "Failed demonstration, cancellation or no scale path.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-switched-005",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"AI and autonomy",
"advanced manufacturing and materials"
],
"mission": "Add distribution hosting capacity and resilience",
"required_capability": "medium-voltage power-flow control and hybrid transformer automation",
"federal_owner": "DOE / DoD",
"federal_program_or_facility": "MAKE IT, GRIP and installation demonstration lanes",
"anticipated_instrument": "prize award, selected GRIP project and planned DoD demonstration",
"company_legal_entity": "Switched Source, LLC",
"company_display_name": "Switched Source",
"company_role": "grid-control equipment developer",
"relationship_state": "prize_winner_and_selected_field_path",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-makeit",
"w2-src-grip"
],
"contrary_signal_ids": [],
"inference_boundary": "Multiple federal paths are confirmed, but GRIP remains selected and field acceptance is open.",
"missing_gate": "Executed GRIP award and commissioned DoD or utility deployment.",
"upgrade_trigger": "Accepted Fort Bliss or utility field result.",
"downgrade_trigger": "GRIP rescission, failed demonstration or factory-ramp miss.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-southernspirit-006",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Move power bidirectionally between regions",
"required_capability": "3,000 MW-class HVDC transmission",
"federal_owner": "DOE Office of Electricity",
"federal_program_or_facility": "Transmission Facilitation Program",
"anticipated_instrument": "selected capacity-contract project",
"company_legal_entity": "Southern Spirit Transmission, LLC",
"company_display_name": "Southern Spirit Transmission",
"company_role": "HVDC project owner and developer",
"relationship_state": "selected_capacity_contract",
"visual_band": "acquisition_near",
"fit_grade": 3,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-tfp"
],
"contrary_signal_ids": [],
"inference_boundary": "Project-owner selection is confirmed; construction and suppliers are not.",
"missing_gate": "Executed capacity contract, permits, finance and named converter/cable suppliers.",
"upgrade_trigger": "Financial close and notice to proceed.",
"downgrade_trigger": "Withdrawal, termination, permit denial or redesign.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-terrapower-007",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy"
],
"mission": "Deliver flexible firm power and industrial heat",
"required_capability": "sodium-fast reactor with molten-salt storage",
"federal_owner": "DOE Office of Clean Energy Demonstrations / NRC",
"federal_program_or_facility": "Advanced Reactor Demonstration Program and Natrium licensing",
"anticipated_instrument": "cost-share agreement plus issued construction permit",
"company_legal_entity": "TerraPower, LLC",
"company_display_name": "TerraPower",
"company_role": "advanced-reactor developer and integrator",
"relationship_state": "construction_permit_issued",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-terrapower"
],
"contrary_signal_ids": [],
"inference_boundary": "Construction authorization is confirmed; operation, fuel and generation are not.",
"missing_gate": "Operating license, HALEU fuel, commissioning and synchronization.",
"upgrade_trigger": "Accepted operating-license filing and major nuclear construction milestones.",
"downgrade_trigger": "Fuel failure, financing gap, suspension or licensing reversal.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-xenergy-008",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Build an integrated advanced-reactor and fuel pathway",
"required_capability": "Xe-100 reactor engineering and domestic TRISO fuel production",
"federal_owner": "DOE / NRC",
"federal_program_or_facility": "ARDP and 48C TX-1 project",
"anticipated_instrument": "cost-share award and manufacturing tax-credit allocation",
"company_legal_entity": "X Energy, LLC",
"company_display_name": "X-energy",
"company_role": "reactor developer and fuel-platform integrator",
"relationship_state": "active_ardp_and_fuel_factory_build",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-xenergy",
"w2-src-48c"
],
"contrary_signal_ids": [],
"inference_boundary": "Federal support and construction activity are confirmed; licensed commercial fuel and reactor permits are not.",
"missing_gate": "TX-1 regulatory approval, qualified output and Seadrift permit.",
"upgrade_trigger": "Commissioned fuel line or issued reactor construction permit.",
"downgrade_trigger": "HALEU shortage, license delay, customer withdrawal or schedule failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-kairos-009",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy"
],
"mission": "Test and qualify fluoride-salt-cooled reactor systems",
"required_capability": "Hermes and Hermes 2 test-reactor construction",
"federal_owner": "DOE / NRC",
"federal_program_or_facility": "advanced-reactor support and non-power reactor licensing",
"anticipated_instrument": "federal support plus issued construction permits",
"company_legal_entity": "Kairos Power LLC",
"company_display_name": "Kairos Power",
"company_role": "test-reactor developer and operator",
"relationship_state": "test_reactors_under_construction",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-kairos"
],
"contrary_signal_ids": [],
"inference_boundary": "Construction is confirmed; operating authorization, fuel loading and criticality are not.",
"missing_gate": "Operating license and initial fuel/criticality.",
"upgrade_trigger": "NRC operating authorization and accepted test program.",
"downgrade_trigger": "Construction halt, fuel unavailability or licensing failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-holtec-010",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy"
],
"mission": "Deploy repeatable light-water SMRs",
"required_capability": "SMR-300 design, licensing and site deployment",
"federal_owner": "DOE Office of Nuclear Energy",
"federal_program_or_facility": "Gen III+ SMR Tier 1 selection",
"anticipated_instrument": "selected cost-shared deployment project",
"company_legal_entity": "Holtec Government Services, LLC",
"company_display_name": "Holtec Government Services",
"company_role": "SMR deployment lead",
"relationship_state": "selected_for_smr_funding",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-smr-select"
],
"contrary_signal_ids": [],
"inference_boundary": "Selection for up to $400 million is confirmed; award execution, permit and construction are not.",
"missing_gate": "Executed award, NRC authorization and financing.",
"upgrade_trigger": "Final award plus site work and long-lead orders.",
"downgrade_trigger": "Award rescission, NRC rejection or orderbook collapse.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-gehitachi-011",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy"
],
"mission": "Create a scalable SMR fleet platform",
"required_capability": "BWRX-300 design, licensing and supply-chain integration",
"federal_owner": "DOE / TVA / NRC",
"federal_program_or_facility": "Gen III+ TVA selection and Clinch River review",
"anticipated_instrument": "selected demonstration program plus docketed license review",
"company_legal_entity": "GE-Hitachi Nuclear Energy Americas LLC",
"company_display_name": "GE Hitachi Nuclear Energy",
"company_role": "SMR design-platform supplier",
"relationship_state": "design_selected_and_license_review_open",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-smr-select",
"w2-src-tva"
],
"contrary_signal_ids": [],
"inference_boundary": "Platform position and license review are confirmed; permit, procurement and construction are not.",
"missing_gate": "Construction permit and TVA equipment orders.",
"upgrade_trigger": "Permit issuance plus long-lead procurement.",
"downgrade_trigger": "Review failure, TVA withdrawal or design divergence.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-bwxt-012",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Create domestic SMR heavy-component capacity",
"required_capability": "reactor-pressure-vessel final assembly and qualified large components",
"federal_owner": "DOE Office of Nuclear Energy",
"federal_program_or_facility": "Gen III+ supply-chain Tier 2",
"anticipated_instrument": "selected cost-shared equipment procurement",
"company_legal_entity": "BWXT Nuclear Energy, Inc.",
"company_display_name": "BWXT Nuclear Energy",
"company_role": "nuclear-component manufacturer",
"relationship_state": "selected_supply_chain_project",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-gen3"
],
"contrary_signal_ids": [],
"inference_boundary": "Selection is confirmed; installed equipment, nuclear QA qualification and customer order are not.",
"missing_gate": "Installed qualified line and named SMR order.",
"upgrade_trigger": "Accepted production qualification and component contract.",
"downgrade_trigger": "Negotiation failure, qualification delay or absent demand.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-tokamak-013",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Close fusion confinement, magnet and diagnostic gaps",
"required_capability": "upgraded operating spherical tokamak and HTS research",
"federal_owner": "DOE Office of Science / UK DESNZ",
"federal_program_or_facility": "ST40 tripartite partnership",
"anticipated_instrument": "named five-year public-private partnership",
"company_legal_entity": "Tokamak Energy Ltd.",
"company_display_name": "Tokamak Energy",
"company_role": "fusion-facility owner and research performer",
"relationship_state": "named_fusion_facility_partnership",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-st40"
],
"contrary_signal_ids": [],
"inference_boundary": "The partnership and existing ST40 facility are confirmed; upgrade completion and later outputs are not.",
"missing_gate": "Operational upgrade and validated research outputs.",
"upgrade_trigger": "Commissioned upgrade and verified milestone results.",
"downgrade_trigger": "Appropriation failure, progress failure or delay.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-energy-thea-014",
"as_of": "2026-08-18",
"sector": "Energy systems, grid and nuclear infrastructure",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Industrialize a manufacturable stellarator architecture",
"required_capability": "modular planar HTS magnets and pilot-plant integration",
"federal_owner": "DOE Office of Fusion Energy Sciences",
"federal_program_or_facility": "Milestone-Based Fusion Development Program",
"anticipated_instrument": "executed milestone agreement with verified early result",
"company_legal_entity": "Thea Energy Inc.",
"company_display_name": "Thea Energy",
"company_role": "stellarator and HTS-magnet developer",
"relationship_state": "milestone_program_verified_result",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-fusion-progress"
],
"contrary_signal_ids": [],
"inference_boundary": "DOE-verified progress is real; an integrated fusion experiment or power plant is not.",
"missing_gate": "Integrated Eos experiment and next verified milestone.",
"upgrade_trigger": "DOE verification of later design or device milestone.",
"downgrade_trigger": "Coil scale-up failure or milestone funding loss.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-mp-015",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Secure mine-to-magnet supply for motors, guidance and industrial equipment",
"required_capability": "rare-earth separation, metal, alloy and sintered NdFeB magnet production",
"federal_owner": "Department of War / OSC",
"federal_program_or_facility": "MP public-private partnership and 10X support",
"anticipated_instrument": "loan, equity, price support and demand commitment",
"company_legal_entity": "MP Materials Corp.",
"company_display_name": "MP Materials",
"company_role": "integrated rare-earth and magnet platform",
"relationship_state": "operating_upstream_and_magnet_startup",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-mp",
"w2-src-mp-dow"
],
"contrary_signal_ids": [],
"inference_boundary": "Federal platform support and early manufacture are confirmed; full commercial magnet output and 10X commissioning are not.",
"missing_gate": "Customer qualification, recurring shipment and 10X construction milestones.",
"upgrade_trigger": "Qualified commercial deliveries and installed 10X equipment.",
"downgrade_trigger": "Execution failure, qualification delay or scale miss.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-noveon-016",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Supply qualified domestic magnets",
"required_capability": "sintered NdFeB blocks from recycled and direct feed",
"federal_owner": "Department of War / DLA",
"federal_program_or_facility": "five-year magnet-block contract",
"anticipated_instrument": "firm-fixed-price delivery order",
"company_legal_entity": "Noveon Magnetics, Inc.",
"company_display_name": "Noveon Magnetics",
"company_role": "commercial magnet manufacturer",
"relationship_state": "direct_dla_delivery_order",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-dla-magnets"
],
"contrary_signal_ids": [],
"inference_boundary": "The direct order and prior commercial shipments are confirmed; sustained annual output is not.",
"missing_gate": "Delivery acceptance, option exercise and verified run rate.",
"upgrade_trigger": "Recurring DLA orders and named accepted deliveries.",
"downgrade_trigger": "Missed delivery, qualification failure or feedstock disruption.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-evac-017",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Supply qualified domestic magnets",
"required_capability": "sintered NdFeB block manufacture",
"federal_owner": "Department of War / DLA",
"federal_program_or_facility": "DPA manufacturing award and sole-source delivery order",
"anticipated_instrument": "award plus firm-fixed-price delivery order",
"company_legal_entity": "eVAC Magnetics LLC",
"company_display_name": "eVAC Magnetics",
"company_role": "commercial magnet manufacturer",
"relationship_state": "direct_dla_delivery_order",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-dla-magnets"
],
"contrary_signal_ids": [],
"inference_boundary": "First shipment and DLA order are confirmed; claimed 2,000-tonne run rate is not independently established.",
"missing_gate": "Order completion, recurring orders and sustained output.",
"upgrade_trigger": "Accepted DLA delivery and disclosed run rate.",
"downgrade_trigger": "Production-ramp or feedstock failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-usar-018",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Build an integrated U.S. rare-earth platform",
"required_capability": "mine, separation, metal/alloy and magnet capacity",
"federal_owner": "Commerce CHIPS Program",
"federal_program_or_facility": "definitive USA Rare Earth agreement",
"anticipated_instrument": "final incentives agreement and senior loan commitment",
"company_legal_entity": "USA Rare Earth, Inc.",
"company_display_name": "USA Rare Earth",
"company_role": "integrated rare-earth platform developer",
"relationship_state": "final_federal_agreement_and_commissioning",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-usar"
],
"contrary_signal_ids": [],
"inference_boundary": "Final agreement and Stillwater commissioning are confirmed; run rate, Blacksburg and Round Top production are not.",
"missing_gate": "Named customer shipment and verified run rate, then site construction.",
"upgrade_trigger": "Recurring sales plus Blacksburg construction start.",
"downgrade_trigger": "Ramp failure, financing breach or mine delay.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-energyfuels-019",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Expand domestic separated rare-earth oxide supply",
"required_capability": "NdPr production and commercial-scale Dy/Tb separation",
"federal_owner": "Department of War / OSC",
"federal_program_or_facility": "conditional finance and operating White Mesa platform",
"anticipated_instrument": "conditional loan plus company-funded construction",
"company_legal_entity": "Energy Fuels Inc.",
"company_display_name": "Energy Fuels",
"company_role": "rare-earth oxide producer and HREE plant developer",
"relationship_state": "operating_ndpr_and_hree_construction",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 3,
"evidence_grade": "B",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-energyfuels"
],
"contrary_signal_ids": [],
"inference_boundary": "Live NdPr capability and HREE construction are real; commercial Dy/Tb and downstream metal/magnet conversion are not.",
"missing_gate": "Commissioning, saleable HREE shipment and named domestic customer.",
"upgrade_trigger": "Qualified Dy/Tb delivery to a U.S. metal or magnet producer.",
"downgrade_trigger": "Construction delay, purity failure or absent customer.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-reelement-020",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Scale domestic separation and recycling",
"required_capability": "high-purity rare-earth, gallium and germanium refining",
"federal_owner": "Department of War Economic Defense Unit",
"federal_program_or_facility": "Industrial Base Fund expansion investment",
"anticipated_instrument": "direct federal investment",
"company_legal_entity": "ReElement Technologies Corp.",
"company_display_name": "ReElement Technologies",
"company_role": "chromatographic refining and recycling platform",
"relationship_state": "federal_capacity_expansion_investment",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-reelement"
],
"contrary_signal_ids": [],
"inference_boundary": "The expansion investment is confirmed; installed capacity, economics and qualified output are not.",
"missing_gate": "Equipment installation and customer-qualified shipments.",
"upgrade_trigger": "Commissioned line with measured output and named buyer.",
"downgrade_trigger": "Scale economics, feedstock or purity failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-syrah-021",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Secure active-anode material for batteries",
"required_capability": "natural-graphite active-anode material production",
"federal_owner": "DOE Energy Dominance Financing",
"federal_program_or_facility": "Vidalia direct loan",
"anticipated_instrument": "closed federal loan",
"company_legal_entity": "Syrah Technologies LLC",
"company_display_name": "Syrah Technologies",
"company_role": "active-anode-material facility operator",
"relationship_state": "operating_federally_financed_facility",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-syrah"
],
"contrary_signal_ids": [],
"inference_boundary": "The facility and loan are confirmed; recurring customer-qualified sales and U.S.-mined feed are not.",
"missing_gate": "Customer acceptance and recurring commercial volumes.",
"upgrade_trigger": "Qualified repeat shipments and expansion financing.",
"downgrade_trigger": "Qualification failure or Mozambique feed disruption.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-thacker-022",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Create domestic battery-grade lithium supply",
"required_capability": "large-scale lithium carbonate mine and processing plant",
"federal_owner": "DOE Energy Dominance Financing",
"federal_program_or_facility": "Thacker Pass ATVM loan",
"anticipated_instrument": "closed federal loan and major construction",
"company_legal_entity": "Lithium Nevada Corp.",
"company_display_name": "Lithium Nevada / Thacker Pass",
"company_role": "lithium project owner and plant developer",
"relationship_state": "closed_loan_and_major_construction",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-thacker"
],
"contrary_signal_ids": [],
"inference_boundary": "Finance and construction are confirmed; production and battery-grade qualification are not.",
"missing_gate": "Mechanical completion, commissioning and customer qualification.",
"upgrade_trigger": "First qualified battery-grade shipments.",
"downgrade_trigger": "Cost overrun, construction delay or market-driven scope change.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-5n-023",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"semiconductors and microelectronics",
"advanced manufacturing and materials"
],
"mission": "Secure germanium for IR, sensing and semiconductor uses",
"required_capability": "zone-refined germanium metal",
"federal_owner": "Department of War / DPA Title III",
"federal_program_or_facility": "germanium capacity-expansion award",
"anticipated_instrument": "direct investment agreement",
"company_legal_entity": "5N Plus Inc.",
"company_display_name": "5N Plus",
"company_role": "germanium refiner",
"relationship_state": "dpa_capacity_expansion_award",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-5n"
],
"contrary_signal_ids": [],
"inference_boundary": "The expansion award and incumbent capability are confirmed; sevenfold commissioned capacity is not.",
"missing_gate": "Equipment commissioning and qualified shipments.",
"upgrade_trigger": "Verified output above 20 tonnes per year.",
"downgrade_trigger": "Installation delay or customer-qualification failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-lattice-024",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"sensing and signature management",
"advanced manufacturing and materials"
],
"mission": "Secure infrared optical components",
"required_capability": "germanium and silicon crystal growth, recycling and optics",
"federal_owner": "Department of War / DPA Title III",
"federal_program_or_facility": "optics production expansion",
"anticipated_instrument": "direct investment agreement",
"company_legal_entity": "Lattice Materials LLC",
"company_display_name": "Lattice Materials",
"company_role": "crystal and IR-optics manufacturer",
"relationship_state": "dpa_component_expansion_award",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-lattice"
],
"contrary_signal_ids": [],
"inference_boundary": "The award and incumbent component capability are confirmed; new qualified output is not.",
"missing_gate": "Commissioned equipment and accepted components.",
"upgrade_trigger": "Customer qualification and verified production increase.",
"downgrade_trigger": "Expansion or qualification failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-elementus-025",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"semiconductors and microelectronics",
"advanced manufacturing and materials"
],
"mission": "Demonstrate domestic gallium recovery",
"required_capability": "gallium separation from bauxite residue",
"federal_owner": "Department of War / DPA Title III",
"federal_program_or_facility": "domestic gallium demonstration project",
"anticipated_instrument": "demonstration award",
"company_legal_entity": "ElementUS Minerals, LLC",
"company_display_name": "ElementUS Minerals",
"company_role": "gallium demonstration-plant developer",
"relationship_state": "federal_demonstration_award",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-elementus"
],
"contrary_signal_ids": [],
"inference_boundary": "The demonstration award is confirmed; commercial-scale gallium production is not.",
"missing_gate": "Commissioned demo, verified yield/purity and named buyer.",
"upgrade_trigger": "Measured output and customer qualification.",
"downgrade_trigger": "Process-yield failure or commercial-finance gap.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-crucible-026",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"semiconductors and microelectronics",
"advanced manufacturing and materials"
],
"mission": "Build a multi-mineral refining platform",
"required_capability": "integrated gallium, germanium, indium, antimony, copper and semiconductor-grade acid production",
"federal_owner": "Commerce CHIPS Program",
"federal_program_or_facility": "Project Crucible",
"anticipated_instrument": "final direct-funding award",
"company_legal_entity": "Crucible Metals, LLC",
"company_display_name": "Crucible Metals",
"company_role": "integrated critical-mineral refiner",
"relationship_state": "final_chips_award_future_platform",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-crucible"
],
"contrary_signal_ids": [],
"inference_boundary": "Final funding is confirmed; the multi-billion-dollar facility is not built or commissioned.",
"missing_gate": "Construction mobilization and phased line commissioning.",
"upgrade_trigger": "EPC notice and first qualified production line.",
"downgrade_trigger": "Financing, permitting, feedstock or schedule failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-antimony-027",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Secure antimony for munitions and high-temperature uses",
"required_capability": "domestic ore concentration, refining and qualified antimony products",
"federal_owner": "Department of War / DPA Title III / DLA",
"federal_program_or_facility": "milestone expansion award and sales contracts",
"anticipated_instrument": "milestone award plus direct sales contracts",
"company_legal_entity": "United States Antimony Corporation",
"company_display_name": "United States Antimony",
"company_role": "antimony refiner and emerging domestic-feed producer",
"relationship_state": "operating_refinery_and_dpa_expansion",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-antimony"
],
"contrary_signal_ids": [],
"inference_boundary": "Existing refining and the expansion award are confirmed; sustained domestic-mine feed is not.",
"missing_gate": "Verified domestic concentrate throughput and DLA deliveries.",
"upgrade_trigger": "Accepted deliveries sourced from domestic ore.",
"downgrade_trigger": "Resource, assay, ramp or contract failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-centrus-028",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Supply HALEU for advanced reactors",
"required_capability": "uranium enrichment to 19.75 percent and expanded commercial cascades",
"federal_owner": "DOE Office of Nuclear Energy",
"federal_program_or_facility": "HALEU Availability Program",
"anticipated_instrument": "IDIQ task order and definitive expansion contract",
"company_legal_entity": "American Centrifuge Operating, LLC",
"company_display_name": "Centrus / American Centrifuge",
"company_role": "HALEU enrichment operator",
"relationship_state": "operating_demo_and_expansion_contract",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-haleu"
],
"contrary_signal_ids": [],
"inference_boundary": "Demonstration production and federal expansion contract are confirmed; commercial scale is not.",
"missing_gate": "New cascade installation, NRC authorization and commercial delivery.",
"upgrade_trigger": "Commissioned expanded capacity and non-DOE customer delivery.",
"downgrade_trigger": "License, centrifuge-manufacturing or schedule failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mat-generalmatter-029",
"as_of": "2026-08-18",
"sector": "Critical materials and component supply chains",
"cet_family": [
"nuclear energy",
"advanced manufacturing and materials"
],
"mission": "Create a second domestic enrichment platform",
"required_capability": "new uranium enrichment plant at Paducah",
"federal_owner": "DOE Office of Nuclear Energy",
"federal_program_or_facility": "HALEU Availability Program",
"anticipated_instrument": "large federal task order and site lease",
"company_legal_entity": "General Matter, Inc.",
"company_display_name": "General Matter",
"company_role": "future HALEU enrichment developer",
"relationship_state": "federal_task_order_prelicense",
"visual_band": "acquisition_near",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "STRONG INFERENCE",
"supporting_signal_ids": [
"w2-src-haleu"
],
"contrary_signal_ids": [],
"inference_boundary": "The federal path and site preparation are confirmed; license, plant and production do not exist yet.",
"missing_gate": "Accepted NRC application, EPC and first cascade installation.",
"upgrade_trigger": "NRC licensing milestone plus construction notice.",
"downgrade_trigger": "Technology qualification, licensing or finance failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-gaasi-030",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Qualify scalable aerospace additive production",
"required_capability": "7075-T73-equivalent LPBF material allowables across printer classes",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "GOTHAAM project call",
"anticipated_instrument": "selected $5.5 million project",
"company_legal_entity": "General Atomics Aeronautical Systems, Inc.",
"company_display_name": "GA-ASI",
"company_role": "qualification prime and aerospace integrator",
"relationship_state": "official_project_winner",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-gothaam"
],
"contrary_signal_ids": [],
"inference_boundary": "GA-ASI's winner role is confirmed; named partner workshare and qualified production are not.",
"missing_gate": "Project abstract, allowables, qualification plan and accepted output.",
"upgrade_trigger": "Published workshare and validated cross-machine allowables.",
"downgrade_trigger": "Project termination or inability to reach comparable properties.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-3dsystems-031",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Expand the qualified defense additive supplier base",
"required_capability": "process-control documentation, training and audit readiness",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "JAQS-SQ",
"anticipated_instrument": "official selected project",
"company_legal_entity": "3D Systems Corporation",
"company_display_name": "3D Systems",
"company_role": "additive-platform qualification performer",
"relationship_state": "official_qualification_project_winner",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-jaqs"
],
"contrary_signal_ids": [],
"inference_boundary": "The project selection is confirmed; supplier approval and sustained qualified production are not.",
"missing_gate": "Accepted process controls and qualified production release.",
"upgrade_trigger": "DoD customer qualification and repeat orders.",
"downgrade_trigger": "Audit failure or lack of transition.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-velo3d-032",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Expand the qualified defense additive supplier base",
"required_capability": "process control plus complex-part inspection readiness",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "JAQS-SQ and prior institute projects",
"anticipated_instrument": "official selected project",
"company_legal_entity": "Velo3D, Inc.",
"company_display_name": "Velo3D",
"company_role": "metal-additive platform and repeat-path performer",
"relationship_state": "official_qualification_project_winner",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-jaqs"
],
"contrary_signal_ids": [],
"inference_boundary": "Selection and repeat institute path are confirmed; production qualification is not.",
"missing_gate": "Accepted process controls and named defense part qualification.",
"upgrade_trigger": "Customer qualification and recurring production order.",
"downgrade_trigger": "Financial distress, audit failure or transition loss.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-divergent-033",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Expand the qualified defense additive supplier base",
"required_capability": "integrated digital production-system controls",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "JAQS-SQ",
"anticipated_instrument": "official selected project",
"company_legal_entity": "Divergent Technologies, Inc.",
"company_display_name": "Divergent",
"company_role": "integrated additive-factory performer",
"relationship_state": "official_qualification_project_winner",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-jaqs"
],
"contrary_signal_ids": [],
"inference_boundary": "Selection is confirmed; workshare and government supplier approval are not.",
"missing_gate": "Accepted controls and production transition.",
"upgrade_trigger": "Qualified defense production release.",
"downgrade_trigger": "Audit, data-rights or transition failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-gkn-034",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Scale additive titanium for critical airframes",
"required_capability": "large qualified Ti additive structures",
"federal_owner": "Air Force Research Laboratory",
"federal_program_or_facility": "Materials and Manufacturing Directorate contract",
"anticipated_instrument": "direct R&D contract FA239425CB017",
"company_legal_entity": "GKN Aerospace GTC, LLC",
"company_display_name": "GKN Aerospace GTC",
"company_role": "airframe additive-manufacturing performer",
"relationship_state": "active_afrl_contract",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl"
],
"contrary_signal_ids": [],
"inference_boundary": "The $8.39 million contract is confirmed in a dated portfolio; delivered qualified structures are not.",
"missing_gate": "Accepted contract milestones and airframe transition.",
"upgrade_trigger": "Qualified demonstration article and program adoption.",
"downgrade_trigger": "Modification, termination or technical failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-graymatter-035",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"AI and autonomy",
"advanced manufacturing and materials"
],
"mission": "Automate high-mix aerospace inspection and correction",
"required_capability": "robotic metrology linked to a digital twin",
"federal_owner": "Air Force Research Laboratory / ARM Institute",
"federal_program_or_facility": "canopy inspection contract and ARM 25-01 selection",
"anticipated_instrument": "direct contract plus selected institute team",
"company_legal_entity": "GrayMatter Robotics Inc.",
"company_display_name": "GrayMatter Robotics",
"company_role": "robotic inspection and correction integrator",
"relationship_state": "active_contract_and_selected_team",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl",
"w2-src-arm"
],
"contrary_signal_ids": [],
"inference_boundary": "The AFRL contract and selected ARM team are confirmed; final ARM workshare and production adoption are not.",
"missing_gate": "Accepted inspection performance and transition user.",
"upgrade_trigger": "Fielded inspection cell with measured acceptance results.",
"downgrade_trigger": "Contract termination, accuracy failure or no transition.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-titan-036",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"AI and autonomy",
"advanced manufacturing and materials"
],
"mission": "Create an agile autonomous factory floor",
"required_capability": "robotic process planning and adaptive manufacturing",
"federal_owner": "Air Force Research Laboratory",
"federal_program_or_facility": "Agile Factory Floor and autonomous planning efforts",
"anticipated_instrument": "active direct R&D contracts",
"company_legal_entity": "Titan Robotics, Inc.",
"company_display_name": "Titan Robotics",
"company_role": "factory-automation and process-planning performer",
"relationship_state": "active_afrl_contracts",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl"
],
"contrary_signal_ids": [],
"inference_boundary": "Active contracts are confirmed from the portfolio; accepted deployment is not.",
"missing_gate": "Completion evidence and transition to an operating factory.",
"upgrade_trigger": "Accepted autonomous planning workflow in production.",
"downgrade_trigger": "Contract modification, termination or transition failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-sedaro-037",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"future computing",
"advanced manufacturing and materials"
],
"mission": "Make propulsion design collaborative and traceable",
"required_capability": "cloud-native rocket-propulsion digital twins",
"federal_owner": "Air Force Test Center / AFRL",
"federal_program_or_facility": "Rocket Propulsion digital-twin IDIQ",
"anticipated_instrument": "competitive IDIQ FA9300-25-D-6000",
"company_legal_entity": "Sedaro Corp.",
"company_display_name": "Sedaro",
"company_role": "cloud-native propulsion digital-twin platform",
"relationship_state": "active_idiq_vehicle",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-sedaro"
],
"contrary_signal_ids": [],
"inference_boundary": "The $20 million ceiling vehicle is confirmed; ceiling value is not revenue and task-order scale is open.",
"missing_gate": "Task orders, obligations and accepted operational use.",
"upgrade_trigger": "Material task-order flow and named program use.",
"downgrade_trigger": "No task orders, platform rejection or cancellation.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-convergent-038",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Control and qualify composite cure processes",
"required_capability": "in-process sensing and composite manufacturing simulation",
"federal_owner": "Air Force Research Laboratory / NASA",
"federal_program_or_facility": "AFRL cure-management contract and HiCAM consortium",
"anticipated_instrument": "direct R&D contract plus transition consortium",
"company_legal_entity": "Convergent Manufacturing Technologies US Inc.",
"company_display_name": "Convergent Manufacturing Technologies",
"company_role": "composite-process sensing and simulation specialist",
"relationship_state": "active_contract_and_transition_ecosystem",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl",
"w2-src-hicam"
],
"contrary_signal_ids": [],
"inference_boundary": "The contract and consortium position are confirmed; airworthiness acceptance and production adoption are not.",
"missing_gate": "Accepted cure-control result and qualified manufacturing process.",
"upgrade_trigger": "Customer certification artifact or production transition.",
"downgrade_trigger": "Sensor reliability or qualification failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-spirit-039",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials"
],
"mission": "Demonstrate high-rate unitized composite structures",
"required_capability": "bonded aerostructure manufacturing and qualification",
"federal_owner": "Air Force Research Laboratory / NASA",
"federal_program_or_facility": "bonded-unitized-composites contract and HiCAM",
"anticipated_instrument": "direct R&D contract plus transition consortium",
"company_legal_entity": "Spirit AeroSystems, Inc.",
"company_display_name": "Spirit AeroSystems",
"company_role": "composite-aerostructure manufacturer",
"relationship_state": "active_contract_and_hicam_member",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl",
"w2-src-hicam"
],
"contrary_signal_ids": [],
"inference_boundary": "The $23.81 million contract and HiCAM position are confirmed; qualified production adoption is not.",
"missing_gate": "Accepted structural demonstration and production decision.",
"upgrade_trigger": "Flight or production article acceptance.",
"downgrade_trigger": "Program cancellation, integration disruption or qualification failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-hill-040",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"sensing and signature management",
"advanced manufacturing and materials"
],
"mission": "Create airworthiness-grade NDE evidence",
"required_capability": "inspection of cold-worked fastener holes in aerospace alloys",
"federal_owner": "Air Force Research Laboratory",
"federal_program_or_facility": "Materials and Manufacturing Directorate contract",
"anticipated_instrument": "direct R&D contract FA239425CB032",
"company_legal_entity": "Hill Engineering, LLC",
"company_display_name": "Hill Engineering",
"company_role": "NDE and structural-integrity specialist",
"relationship_state": "active_afrl_contract",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl"
],
"contrary_signal_ids": [],
"inference_boundary": "The contract is confirmed; accepted inspection method and fleet adoption are not.",
"missing_gate": "Validated method and transition into maintenance or production.",
"upgrade_trigger": "Airworthiness authority acceptance.",
"downgrade_trigger": "Accuracy, repeatability or transition failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-bluequartz-041",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"advanced manufacturing and materials",
"future computing"
],
"mission": "Make materials characterization reproducible",
"required_capability": "reliable microtexture quantification software for titanium",
"federal_owner": "Air Force Research Laboratory",
"federal_program_or_facility": "Materials and Manufacturing Directorate contract",
"anticipated_instrument": "direct R&D contract FA239425CB033",
"company_legal_entity": "BlueQuartz Software, LLC",
"company_display_name": "BlueQuartz Software",
"company_role": "materials-characterization software specialist",
"relationship_state": "active_afrl_contract",
"visual_band": "confirmed",
"fit_grade": 3,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-afrl"
],
"contrary_signal_ids": [],
"inference_boundary": "The contract is confirmed; certification authority acceptance and broader deployment are not.",
"missing_gate": "Validated reliability and program use.",
"upgrade_trigger": "Adopted characterization workflow in a qualification record.",
"downgrade_trigger": "Software reliability or acceptance failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-honeywell-042",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"sensing and signature management",
"advanced manufacturing and materials"
],
"mission": "Inspect large and complex additive parts rapidly",
"required_capability": "near-commercial non-destructive inspection",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "QTIME project call",
"anticipated_instrument": "official award-lead selection",
"company_legal_entity": "Honeywell International Inc.",
"company_display_name": "Honeywell",
"company_role": "additive NDI project lead",
"relationship_state": "official_qtime_award_lead",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-qtime"
],
"contrary_signal_ids": [],
"inference_boundary": "Award-lead status is confirmed; completed rapid NDI qualification is not.",
"missing_gate": "Accepted inspection system and transition to DoD, FAA or NASA use.",
"upgrade_trigger": "Qualified part inspection and production adoption.",
"downgrade_trigger": "Performance or transition failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
},
{
"inference_id": "w2-mfg-northrop-043",
"as_of": "2026-08-18",
"sector": "Advanced manufacturing and industrial qualification",
"cet_family": [
"sensing and signature management",
"advanced manufacturing and materials"
],
"mission": "Inspect large and complex additive parts rapidly",
"required_capability": "near-commercial non-destructive inspection",
"federal_owner": "OSW ManTech / America Makes",
"federal_program_or_facility": "QTIME project call",
"anticipated_instrument": "official award-lead selection",
"company_legal_entity": "Northrop Grumman Systems Corporation",
"company_display_name": "Northrop Grumman Systems",
"company_role": "additive NDI project lead and end-user integrator",
"relationship_state": "official_qtime_award_lead",
"visual_band": "confirmed",
"fit_grade": 4,
"path_grade": 4,
"evidence_grade": "A",
"forecast_label": "CONFIRMED",
"supporting_signal_ids": [
"w2-src-qtime"
],
"contrary_signal_ids": [],
"inference_boundary": "Award-lead status is confirmed; completed rapid NDI qualification is not.",
"missing_gate": "Accepted inspection system and program transition.",
"upgrade_trigger": "Qualified part inspection used in production.",
"downgrade_trigger": "Performance, data-rights or transition failure.",
"next_recheck": "2026-10-31",
"expiry": "2027-02-18"
}
]
}
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.