| The count | Proposed only | - Value
- 5
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Proposed, with a companion direct final rule in effect | - Value
- 1
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Final rule | - Value
- 2
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Rule by rule · Proposed only | Worker Safety and Health Requirements To Support Reform of Nuclear Reactor Testing | - Sub
- U.S. Department of Energy · February 26, 2026
- Badge
- Text
- Proposed only
- Text
- DOE proposed amending its 10 CFR Part 851 worker safety regulations to expedite review, approval, and deployment of advanced reactors — including the qualified test reactors in the Reactor Pilot Program — consistent with EO 14301. The comment period was reopened after an AFL-CIO extension request, signaling labor friction over the deregulatory pace.
- Published
- February 26, 2026
- Agency
- U.S. Department of Energy
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- 10 CFR 851, worker safety, EO 14301, test reactors, labor
- Clocks (factual spine)
- Original NOPR published 2026-01-21; extension request dated 2026-02-04; reopening signed 2026-02-24; filed 2026-02-25 08:45; published 2026-02-26, 91 FR 9498–9499; comments through 2026-03-23.
- What the source establishes (factual spine)
- Reopened comments on the January 21 proposed Part 851 rule through March 23. The AFL-CIO request cited review time and affiliate coordination; it is not itself evidence of substantive opposition or a final rule.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Regulatory Framework for Fusion Machines | - Sub
- U.S. Nuclear Regulatory Commission · February 26, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed regulating commercial fusion machines under its existing byproduct-material framework — a lighter touch than fission licensing — with technology-inclusive requirements spanning the variety of anticipated fusion designs. The ADVANCE Act's relabeling of 'fusion reactor' to 'fusion machine' anchors the lighter posture meant to clear a path for commercial fusion.
- Published
- February 26, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- fusion, byproduct material, ADVANCE Act, technology-inclusive, commercialization
- Clocks (factual spine)
- Dated 2026-02-23; filed 2026-02-25 at 08:45 (timezone not specified in filing line); published 2026-02-26, 91 FR 9476–9498. Comments due 2026-05-27. NRC selected the Part 30 approach on 2023-04-13. NEIMA enacted 2019-01-14 already set 2027-12-31; ADVANCE enacted 2024-07-09 retained that date and separately required a section 205(c) report within one year (2025-07-09). No final-rule effective date established by this proposal.
- What the source establishes (factual spine)
- Proposed Part 30 byproduct-material framework, following NRC’s 2023 policy choice and ADVANCE’s substantive definitions. The pre-existing NEIMA deadline and state/project licensing clocks remain separate.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Streamlining Contested Adjudications in Licensing Proceedings | - Sub
- U.S. Nuclear Regulatory Commission · March 3, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed revising its rules of practice to compress contested hearings in licensing proceedings, responding to both the ADVANCE Act of 2024 and EO 14300. The change tightens intervention and filing windows to keep reactor licensing on the EO-mandated accelerated timeline.
- Published
- March 3, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- adjudication, ADVANCE Act, EO 14300, hearings, licensing
- Clocks (factual spine)
- Dated 2026-02-27; filed 2026-03-02 08:45; published 2026-03-03, 91 FR 10450. Comments due 2026-04-02.
- What the source establishes (factual spine)
- Proposed changes to merits submissions, discovery and contested proceedings. Filing windows vary; appeals sit outside the fixed EO timeline.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | NRC Reviews of Reactor Designs Previously Authorized by DOE or Department of War | - Sub
- U.S. Nuclear Regulatory Commission · April 2, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed letting commercial reactor applicants directly leverage prior DOE or Department of War authorizations of demonstration reactors into NRC licensing reviews, building a bridge from the DOE pilot/test-reactor track to commercial licensing. A concrete mechanism for converting fast-tracked test reactors into licensed commercial plants.
- Published
- April 2, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- design leveraging, DOE authorization, demonstration reactors, licensing efficiency
- Clocks (factual spine)
- Dated 2026-03-31; filed 2026-04-01 08:45; published 2026-04-02, 91 FR 16584–16588. Comments due 2026-05-04.
- What the source establishes (factual spine)
- Proposed reuse of tested DOE/Defense safety evidence in NRC review, with a mapping to NRC requirements and changed conditions. Authorization alone does not convert into a commercial license.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles | - Sub
- U.S. Nuclear Regulatory Commission · May 1, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed a new 10 CFR Part 57 framework for rapid, high-volume licensing of microreactors, explicitly responding to EO 14300's direction to consider regulating microreactors through general licenses. The rule would create flexible licensing pathways and reduce regulatory burden for mass-deployed small reactors.
- Published
- May 1, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- microreactors, Part 57, EO 14300, general license, high-volume
- Clocks (factual spine)
- Dated 2026-04-29; filed 2026-04-30 08:45; published 2026-05-01, 91 FR 23628–23766. Comments due 2026-06-15 at 23:59 Eastern. Correction filed 2026-05-14 08:45 and published 2026-05-15, 91 FR 27870–27871.
- What the source establishes (factual spine)
- Proposed optional microreactor path for qualifying designs, with conditional construction permission and separate operating approval. The May 15 correction does not finalize the framework.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|