| The count | Proposed only | - Value
- 5
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Proposed, with a companion direct final rule in effect | - Value
- 1
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| The count | Final rule | - Value
- 2
| For this row’s sourcing, see the saved details, section context and linked research. |
|---|
| Rule by rule · Proposed only | Worker Safety and Health Requirements To Support Reform of Nuclear Reactor Testing | - Sub
- U.S. Department of Energy · February 26, 2026
- Badge
- Text
- Proposed only
- Text
- DOE proposed amending its 10 CFR Part 851 worker safety regulations to expedite review, approval, and deployment of advanced reactors — including the qualified test reactors in the Reactor Pilot Program — consistent with EO 14301. The comment period was reopened after an AFL-CIO extension request, signaling labor friction over the deregulatory pace.
- Published
- February 26, 2026
- Agency
- U.S. Department of Energy
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- 10 CFR 851, worker safety, EO 14301, test reactors, labor
- Clocks (factual spine)
- Original NOPR published 2026-01-21; extension request dated 2026-02-04; reopening signed 2026-02-24; filed 2026-02-25 08:45; published 2026-02-26, 91 FR 9498–9499; comments through 2026-03-23.
- What the source establishes (factual spine)
- Reopened comments on the January 21 proposed Part 851 rule through March 23. The AFL-CIO request cited review time and affiliate coordination; it is not itself evidence of substantive opposition or a final rule.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Regulatory Framework for Fusion Machines | - Sub
- U.S. Nuclear Regulatory Commission · February 26, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed regulating commercial fusion machines under its existing byproduct-material framework — a lighter touch than fission licensing — with technology-inclusive requirements spanning the variety of anticipated fusion designs. The ADVANCE Act's relabeling of 'fusion reactor' to 'fusion machine' anchors the lighter posture meant to clear a path for commercial fusion.
- Published
- February 26, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- fusion, byproduct material, ADVANCE Act, technology-inclusive, commercialization
- Clocks (factual spine)
- Dated 2026-02-23; filed 2026-02-25 at 08:45 (timezone not specified in filing line); published 2026-02-26, 91 FR 9476–9498. Comments due 2026-05-27. NRC selected the Part 30 approach on 2023-04-13. NEIMA enacted 2019-01-14 already set 2027-12-31; ADVANCE enacted 2024-07-09 retained that date and separately required a section 205(c) report within one year (2025-07-09). No final-rule effective date established by this proposal.
- What the source establishes (factual spine)
- Proposed Part 30 byproduct-material framework, following NRC’s 2023 policy choice and ADVANCE’s substantive definitions. The pre-existing NEIMA deadline and state/project licensing clocks remain separate.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Streamlining Contested Adjudications in Licensing Proceedings | - Sub
- U.S. Nuclear Regulatory Commission · March 3, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed revising its rules of practice to compress contested hearings in licensing proceedings, responding to both the ADVANCE Act of 2024 and EO 14300. The change tightens intervention and filing windows to keep reactor licensing on the EO-mandated accelerated timeline.
- Published
- March 3, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- adjudication, ADVANCE Act, EO 14300, hearings, licensing
- Clocks (factual spine)
- Dated 2026-02-27; filed 2026-03-02 08:45; published 2026-03-03, 91 FR 10450. Comments due 2026-04-02.
- What the source establishes (factual spine)
- Proposed changes to merits submissions, discovery and contested proceedings. Filing windows vary; appeals sit outside the fixed EO timeline.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | NRC Reviews of Reactor Designs Previously Authorized by DOE or Department of War | - Sub
- U.S. Nuclear Regulatory Commission · April 2, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed letting commercial reactor applicants directly leverage prior DOE or Department of War authorizations of demonstration reactors into NRC licensing reviews, building a bridge from the DOE pilot/test-reactor track to commercial licensing. A concrete mechanism for converting fast-tracked test reactors into licensed commercial plants.
- Published
- April 2, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- design leveraging, DOE authorization, demonstration reactors, licensing efficiency
- Clocks (factual spine)
- Dated 2026-03-31; filed 2026-04-01 08:45; published 2026-04-02, 91 FR 16584–16588. Comments due 2026-05-04.
- What the source establishes (factual spine)
- Proposed reuse of tested DOE/Defense safety evidence in NRC review, with a mapping to NRC requirements and changed conditions. Authorization alone does not convert into a commercial license.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed only | Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles | - Sub
- U.S. Nuclear Regulatory Commission · May 1, 2026
- Badge
- Text
- Proposed only
- Text
- The NRC proposed a new 10 CFR Part 57 framework for rapid, high-volume licensing of microreactors, explicitly responding to EO 14300's direction to consider regulating microreactors through general licenses. The rule would create flexible licensing pathways and reduce regulatory burden for mass-deployed small reactors.
- Published
- May 1, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- microreactors, Part 57, EO 14300, general license, high-volume
- Clocks (factual spine)
- Dated 2026-04-29; filed 2026-04-30 08:45; published 2026-05-01, 91 FR 23628–23766. Comments due 2026-06-15 at 23:59 Eastern. Correction filed 2026-05-14 08:45 and published 2026-05-15, 91 FR 27870–27871.
- What the source establishes (factual spine)
- Proposed optional microreactor path for qualifying designs, with conditional construction permission and separate operating approval. The May 15 correction does not finalize the framework.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Proposed, with a companion direct final rule in effect | Exceptions From Foreign Ownership, Control or Domination | - Sub
- U.S. Nuclear Regulatory Commission · April 23, 2026
- Badge
- Text
- Proposed; companion direct final rule in effect
- Text
- The NRC proposed carving exceptions to the Atomic Energy Act's foreign-ownership bar for reactor licensees, implementing Section 301 of the ADVANCE Act of 2024. The change opens U.S. reactor projects to allied foreign capital and ownership the AEA had previously blocked.
- Published
- April 23, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Proposed Rule
- Source
- Federal Register
- Tags
- foreign ownership, ADVANCE Act, FOCD, investment
- Clocks (factual spine)
- Proposal and direct final dated 2026-04-06; filed 2026-04-22 08:45; published 2026-04-23. Confirmation dated 2026-06-03; filed 2026-06-04 08:45; published 2026-06-05. Direct final effective 2026-07-07.
- What the source establishes (factual spine)
- The companion April 23 direct final rule was confirmed June 5 as effective July 7. Exceptions concern listed eligible foreign interests in utilization facilities, subject to NRC’s non-inimicality determination; production-facility restrictions remain.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
- Later state (factual spine)
- The ownership entry has a confirmed later state: the April 23 direct final rule and June 5 confirmation establish July 7 effectiveness. The 37 listed jurisdictions comprise 36 eligible OECD members plus India; the July 9, 2024 statutory sanctions screen excludes Turkey. Eligibility is not evidence of a completed investment or an approved ownership structure. The May 15 Part 57 correction corrects the proposal’s presentation, without establishing adoption.
- Distinct instruments
- The original document remains a proposal. Its companion direct final rule became effective July 7, 2026, confirmed June 5. Eligible utilization-facility foreign interests remain subject to NRC non-inimicality determination; production-facility restrictions remain.
| |
|---|
| Rule by rule · Final rule | Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (10 CFR Part 53) | - Sub
- U.S. Nuclear Regulatory Commission · March 30, 2026
- Badge
- Text
- Final rule
- Text
- The NRC finalized 10 CFR Part 53, a new optional, technology-inclusive licensing pathway built for non-light-water advanced reactor designs, fulfilling a mandate of the Nuclear Energy Innovation and Modernization Act. It gives developers a third licensing route alongside the legacy Part 50 and Part 52 frameworks.
- Published
- March 30, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Rule
- Source
- Federal Register
- Tags
- Part 53, NEIMA, advanced reactors, technology-inclusive, licensing
- Clocks (factual spine)
- Rule dated 2026-03-25; filed 2026-03-27 08:45; published 2026-03-30, 91 FR 15696; effective 2026-04-29. Correction dated 2026-04-09; filed 2026-04-10 08:45; published 2026-04-13; effective 2026-04-29.
- What the source establishes (factual spine)
- Optional commercial fission licensing alongside Parts 50 and 52, including light-water designs. Effective April 29; the April 13 correction retained that date. Fusion has a separate rulemaking; this is distinct from the broader EO 14300 overhaul.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| Rule by rule · Final rule | Fee Schedules; Fee Recovery for Fiscal Year 2026 | - Sub
- U.S. Nuclear Regulatory Commission · June 16, 2026
- Badge
- Text
- Final rule
- Text
- The NRC finalized fixed caps on service fees to implement Section 5(a) of EO 14300, directly attacking the hourly-billing model the order condemned for throttling reactor development. The caps are framed as delivering cost predictability and accountability to license applicants.
- Published
- June 16, 2026
- Agency
- U.S. Nuclear Regulatory Commission
- Kind in the record
- Rule
- Source
- Federal Register
- Tags
- fee caps, EO 14300, NEIMA, cost predictability, NRC reform
- Clocks (factual spine)
- Dated 2026-06-05; filed 2026-06-15 08:45; published 2026-06-16, 91 FR 36470–36509. General effectiveness 2026-08-17; fixed caps start 2026-10-01. Hourly rates begin with the first full pay period after general effectiveness.
- What the source establishes (factual spine)
- Final fee rule generally effective August 17; fixed caps begin October 1. Hourly billing remains. Caps cover requested activities involving a final safety evaluation; decision deadlines are deferred.
- Checked against the source
- September 7, 2026 (factual spine reconciliation)
| |
|---|
| The executive orders behind them · May 2025 nuclear orders | Executive Order 14299 — Deploying Advanced Nuclear Reactor Technologies for National Security | - Sub
- Published May 29, 2025
- Badge
- Text
- Executive order
- Text
- Signed May 23, 2025, orders deployment of advanced reactors — Gen III+, SMRs, microreactors, and mobile reactors — to power critical defense installations and AI data centers, framing energy disruption as a strategic risk. It tasks the Departments of Defense and Energy with siting reactors on federal and military land.
- Published
- May 29, 2025
- Agency
- Executive Office of the President
- Kind in the record
- Presidential Document
- Source
- Federal Register
- Tags
- EO 14299, national security, microreactors, SMR, defense
- Clocks (factual spine)
- Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22581–22586.
- What the source establishes (factual spine)
- Separate Defense and DOE assignments connect national-security missions, sites and fuel. The Defense operating target is September 30, 2028; the DOE first-site goal is thirty months after signing.
| |
|---|
| The executive orders behind them · May 2025 nuclear orders | Executive Order 14300 — Ordering the Reform of the Nuclear Regulatory Commission | - Sub
- Published May 29, 2025
- Badge
- Text
- Executive order
- Text
- Signed May 23, 2025, this order directs a wholesale overhaul of the NRC, faulting it for licensing only a fraction of reactors since 1978 and for fee structures that throttle development. It mandates fixed fee caps, an 18-month deadline for new reactor license decisions, and a culture shift away from radiation-risk conservatism toward enabling deployment.
- Published
- May 29, 2025
- Agency
- Executive Office of the President
- Kind in the record
- Presidential Document
- Source
- Federal Register
- Tags
- NRC reform, EO 14300, licensing, 18-month deadline, nuclear
- Clocks (factual spine)
- Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22587–22590.
- What the source establishes (factual spine)
- NRC reform direction: decision deadlines and hourly-fee recovery caps require implementation. The approximately 100-to-400 GW aspiration for 2050 is in section 2(c).
| |
|---|
| The executive orders behind them · May 2025 nuclear orders | Executive Order 14301 — Reforming Nuclear Reactor Testing at the Department of Energy | - Sub
- Published May 29, 2025
- Badge
- Text
- Executive order
- Text
- Signed May 23, 2025, directs DOE to use its own Atomic Energy Act authorization process to fast-track construction and testing of advanced reactors — microreactors, SMRs, Gen III+/IV designs — at DOE sites outside the national labs. The legal foundation for the DOE Reactor Pilot Program, bypassing the slower NRC commercial-licensing path for test reactors.
- Published
- May 29, 2025
- Agency
- Executive Office of the President
- Kind in the record
- Presidential Document
- Source
- Federal Register
- Tags
- EO 14301, DOE, reactor testing, advanced reactors, pilot program
- Clocks (factual spine)
- Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22591–22593.
- What the source establishes (factual spine)
- DOE laboratory testing and the separate outside-laboratory pilot have different processes. The latter requires sufficient DOE control, not DOE ownership of the land; its research jurisdiction excludes commercial electric-power production.
| |
|---|
| The executive orders behind them · May 2025 nuclear orders | Executive Order 14302 — Reinvigorating the Nuclear Industrial Base | - Sub
- Published May 29, 2025
- Badge
- Text
- Executive order
- Text
- Signed May 23, 2025, targets the full nuclear fuel supply chain — uranium mining, milling, conversion, enrichment, and spent-fuel recycling — and authorizes Defense Production Act voluntary agreements among domestic nuclear companies. It aims to quadruple U.S. nuclear capacity by 2050 and rebuild fuel-cycle independence.
- Published
- May 29, 2025
- Agency
- Executive Office of the President
- Kind in the record
- Presidential Document
- Source
- Federal Register
- Tags
- EO 14302, fuel cycle, enrichment, Defense Production Act, reprocessing
- Clocks (factual spine)
- Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22595–22599.
- What the source establishes (factual spine)
- Fuel-cycle, workforce, financing and voluntary-agreement directions. Section 4(a) targets five GW of uprates and ten large reactors with complete designs under construction by 2030; the 2050 capacity aspiration belongs to EO 14300.
| |
|---|