Skip to content

Which dated decisions in the next year will show whether each NSSTS company's position is real? — saved evidence, page 2

Saved evidence through 2026-08-18. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 21–40 of 42. Page 2 of 3.

Section context and qualifications
Uncertainty
  • A gate date is when the package expects a record to exist, not a promise that an agency will act then.
  • Past due means the date passed and the dossier holds no later check; the outcome may exist outside the registry.
SectionRecordSaved detailsSources and dates
The calendarGPI controlled-flight and intercept progressionhttps://www.defense.gov/News/Contracts/Contract/Article/3964063/ ·
Date
2026-10-31
Who
Northrop Grumman Systems Corporation
Detail
Up if: Successful controlled flight, representative intercept or production decision. Down if: Design failure, cancellation, competitor downselect or schedule erosion.
The calendarSM-6 and SM-3 accepted production lots and follow-on optionshttps://www.defense.gov/News/Contracts/Contract/Article/4146543/ ·
Date
2026-10-31
Who
Raytheon Company
Detail
Up if: Expanded accepted lots, on-time delivery and exercised production options. Down if: Test failure, lot rejection, delivery disruption or follow-on loss.
The calendarHELWS current follow-on and operational evidencehttps://www.afrl.af.mil/News/Article-Display/Article/2328996/afrl-gives-warfighters-new-weapons-system/ ·
Date
2026-10-31
Who
Raytheon Company
Detail
Up if: Named production or JIATF-401 selection plus accepted reliability and target-effect results. Down if: No funded follow-on or adverse sustainment and effectiveness results.
The calendarPHASER transition, safety and lethality evidencehttps://www.afrl.af.mil/News/Article-Display/Article/2328996/afrl-gives-warfighters-new-weapons-system/ ·
Date
2026-10-31
Who
Raytheon Company
Detail
Up if: Current service procurement and accepted electromagnetic-safety and target-effect results. Down if: Continued absence of a funded follow-on or adverse electromagnetic-compatibility result.
The calendarNSSL and SDA missions maintain clean launch cadence and accepted orbital delivery.https://www.defense.gov/News/Contracts/Contract/Article/4146543/ ·
Date
2026-10-31
Who
Space Exploration Technologies Corp.
Detail
Up if: On-time mission execution with accepted payload deployment. Down if: Mission-assurance failure, major delay or reassignment of an ordered mission.
The calendarSSC publishes measurable Space Data Network prototype integration or delivery progress.https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4501527/us-space-force-advances-space-data-network-backbone-for-global-warfighter-conne ·
Date
2026-11-18
Who
Space Exploration Technologies Corp.
Detail
Up if: Demonstrated end-to-end optical-mesh performance or exercised service options. Down if: Schedule slip, material scope reduction or failed integration milestone.
The calendarNNSA or DOE publishes a named scientific-cloud task, workload expansion or contribution-consumption record.https://www.energy.gov/nnsa/articles/nnsa-launches-secretrestricted-data-enterprise-cloud-environment-collaboration-amazon ·
Date
2026-11-24
Who
Amazon Web Services, Inc.
Detail
Up if: A named American Science Cloud task order or disclosed workload expansion tied to Amazon Web Services, Inc. Down if: Declared capacity remains unused outside the existing NNSA environment or another cloud becomes the operating scientific platform.
The calendarM2PC or next DOE autonomous-platform contract and construction milestonehttps://www.energy.gov/articles/energy-department-launches-breakthrough-ai-driven-biotechnology-platform-pnnl ·
Date
2026-11-24
Who
Ginkgo Bioworks, Inc.
Detail
Up if: Named instrument, accepted milestone or an additional commissioned laboratory deployment. Down if: Scope reduction, commissioning delay or adverse closed-loop acceptance result.
The calendarDOE or a national laboratory issues a named data-layer or operational-AI implementation object.https://genesismissionconsortium.org/our-members ·
Date
2026-11-24
Who
Palantir USG, Inc.
Detail
Up if: A Genesis, American Science Cloud or ModCon deployment names Palantir USG, Inc. Down if: Participation remains advisory or DOE selects another operating data platform.
The calendarDISA publishes Thunderdome option exercise and accepted migration milestones.https://disa.mil/en/About/Thunderdome ·
Date
2026-11-30
Who
Booz Allen Hamilton Inc.
Detail
Up if: Confirmed DAFA or combatant-command migrations under exercised options. Down if: Option lapse, migration failure or architecture replacement.
The calendarHELIOS operational acceptance and replicationhttps://www.navsea.navy.mil/Media/News/Article/4494885/navys-directed-energy-systems-integration-lab-to-train-sailors-on-laser-weapons/ ·
Date
2026-11-30
Who
Lockheed Martin Corporation
Detail
Up if: Published operational-test acceptance, reliable sailor-operated performance or a second-ship award. Down if: Persistent reliability or maintainability limits, adverse operational test or no fleet replication.
The calendarA DoW component issues and funds an Oracle ESI task order for a named workload.https://www.war.gov/News/Contracts/Contract/Article/4554053/contracts-for-july-23-2026/ ·
Date
2026-11-30
Who
Oracle America, Inc.
Detail
Up if: Funded task order and documented operating deployment under the agreement. Down if: No material ordering, option non-exercise or replacement by another enterprise architecture.
The calendarTerminal and radio order conversion, qualification and field acceptancehttps://www.defense.gov/News/Contracts/Contract/Article/4219338/ ·
Date
2026-12-18
Who
L3Harris Technologies, Inc.
Detail
Up if: Material funded orders and documented accepted performance at fleet scale in both lanes. Down if: Low order conversion, qualification failure, adverse field performance or contract-scope reduction.
The calendarDISA publishes IL6 expansion, task-order use or accepted operational-edge workload transitions.https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2027/budget_justification/pdfs/06_Defense_Working_Capital_Fund/PB_2027_DWWCF_Operating_and_Capital_Budget_Est.pdf ·
Date
2026-12-31
Who
Amazon Web Services, Inc.
Detail
Up if: Additional accepted mission workloads or a confirmed IL6 AWS service are recorded. Down if: Theater withdrawal, cloud-provider displacement or loss of a required authorization.
The calendarArmy releases order-level funding, field-acceptance or performance evidence for later Maven increments.https://www.war.gov/News/Contracts/Contract/Article/4194643/contracts-for-may-21-2025/ ·
Date
2026-12-31
Who
Palantir USG, Inc.
Detail
Up if: Additional funded orders and published operational acceptance. Down if: Order shortfall, architecture replacement, data-rights conflict or termination.
The calendarAnnual entity review confirms the exact GE Vernova Operations performer and preserves affiliate separation.https://www.sec.gov/Archives/edgar/data/1996810/000199681026000015/gevform10k2025-ex211.htm ·
Date
2027-01-29
Who
GE Vernova Operations LLC
Detail
Up if: Award papers and ownership records converge on the exact entity across both sectors. Down if: Federal work belongs to a different affiliate, is novated without resolution or remains brand-only.
The calendarPTS-P flight-article build and schedule integrityhttps://www.ssc.spaceforce.mil/DesktopModules/ArticleCS/Print.aspx?Article=4493753&ModuleId=560&PortalId=3 ·
Date
2027-02-15
Who
Northrop Grumman Systems Corporation
Detail
Up if: Accepted spacecraft milestone, completed flight integration or an on-schedule launch assignment. Down if: Prototype schedule failure, anti-jam threshold failure or loss of follow-on production.
The calendarAnnual entity review confirms Palantir USG remains the federal subsidiary and no contracting seam has shifted.https://www.sec.gov/Archives/edgar/data/1321655/000132165526000011/a2025fyexhibit211.htm ·
Date
2027-02-17
Who
Palantir USG, Inc.
Detail
Up if: Exact-entity continuity plus a named DOE operating object. Down if: Federal work moves to another subsidiary or the DOE bridge remains uncontracted.
The calendarNSWC Dahlgren releases and awards the planned HPM engineering-support follow-on.https://www.navsea.navy.mil/Portals/103/Documents/NSWC_Dahlgren/Small_Business/NSWCDD_LRAE_FY25-Q3.pdf ·
Date
2027-04-01
Who
Booz Allen Hamilton Inc.
Detail
Up if: A follow-on award retains the incumbent HPM vulnerability, lethality and prototype-evaluation scope. Down if: Recompete loss, cancellation or material migration of the HPM scope.
The calendarThe next annual entity and program review confirms Oracle America remains the performer node and both lanes show execution.https://www.sec.gov/Archives/edgar/data/1341439/000119312526277521/orcl-ex21_01.htm ·
Date
2027-06-22
Who
Oracle America, Inc.
Detail
Up if: Accepted cross-sector delivery and continued exact-entity continuity. Down if: Entity migration, contract novation without resolution or lack of operating evidence in either lane.