Which dated decisions in the next year will show whether each NSSTS company's position is real? — saved evidence, page 1

Saved evidence through 2026-08-18. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 1–20 of 42. Page 1 of 3.

Section context and qualifications
Uncertainty
  • A gate date is when the package expects a record to exist, not a promise that an agency will act then.
  • Past due means the date passed and the dossier holds no later check; the outcome may exist outside the registry.
SectionRecordSaved detailsSources and dates
At a glanceDated decisions
Value
34
Note
Dossiers checked August 18, 2026
For this row’s sourcing, see the saved details, section context and linked research.
At a glancePassed with no recorded outcome
Value
2
For this row’s sourcing, see the saved details, section context and linked research.
At a glanceStill ahead
Value
32
For this row’s sourcing, see the saved details, section context and linked research.
By quarter2026 Q3
Value
1
Display
1
For this row’s sourcing, see the saved details, section context and linked research.
By quarter2026 Q4
Value
26
Display
26
For this row’s sourcing, see the saved details, section context and linked research.
By quarter2027 Q1
Value
3
Display
3
For this row’s sourcing, see the saved details, section context and linked research.
By quarter2027 Q2
Value
3
Display
3
For this row’s sourcing, see the saved details, section context and linked research.
By quarter2027 Q4
Value
1
Display
1
For this row’s sourcing, see the saved details, section context and linked research.
The calendarArgonne or DOE records the final center integration, financing or capacity object.https://www.energy.gov/articles/energy-department-announces-new-partnership-nvidia-and-oracle-build-largest-doe-ai ·
Date
2026-08-27
Who
Oracle America, Inc.
Badge
Text
Past due, no record
Detail
Up if: A follow-on center agreement, accepted capacity or named financing and integration role. Down if: Another integrator takes the expansion role or Oracle's scope materially contracts.
The calendarThe Navy definitizes the civilian-mariner wireless contract and records site or cybersecurity acceptance.https://www.defense.gov/News/Contracts/Contract/Article/4218062/ ·
Date
2026-10-18
Who
Booz Allen Hamilton Inc.
Badge
Text
Past due, no record
Detail
Up if: Definitized value and accepted deployments across named sites. Down if: Material scope reduction, persistent installation delay or cyber-authorization failure.
The calendarMAVRC downselect, prototype and security-certification pathhttps://www.ssc.spaceforce.mil/Newsroom/Article/4553786/aflcmc-partners-with-space-systems-command-to-award-next-gen-mavrc-gps-receiver ·
Date
2026-10-31
Who
BAE Systems Information and Electronic Systems Integration Inc.
Detail
Up if: Phase 2 selection, prototype order and quantitative receiver-resilience or certification result. Down if: Design rejection, competitor downselect or platform security-certification failure.
The calendarDual Band Decoy delivery and platform acceptancehttps://www.defense.gov/News/Contracts/Contract/Article/4228977/ ·
Date
2026-10-31
Who
BAE Systems Information and Electronic Systems Integration Inc.
Detail
Up if: Accepted assemblies, reliability evidence, platform expansion or a follow-on lot. Down if: Qualification, delivery or integration failure or absence of follow-on production.
The calendarDOE publishes the executed FORGE assistance agreement, obligation and first accepted milestone.https://www.energy.gov/articles/secretary-energy-chris-wright-announces-first-genesis-mission-projects-selected-accelerate ·
Date
2026-10-31
Who
GE Vernova Operations LLC
Detail
Up if: Award number, obligation and delivered FORGE result tied to GE Vernova Operations LLC. Down if: Negotiations are rescinded, scope is canceled or another GE entity is the unresolved performer.
The calendarFITT equipment reaches public commissioning and accepted performance testing.https://www.energy.gov/oe/articles/energy-department-advances-us-electric-grid-resilience-and-reliability-new-transformer ·
Date
2026-10-31
Who
GE Vernova Operations LLC
Detail
Up if: Full-scale utility deployment and public performance acceptance. Down if: Failed demonstration, cancellation or no credible scale path.
The calendarDARPA RPM independent metric result and operating-customer transitionhttps://www.darpa.mil/news/2023/protein-based-therapeutics ·
Date
2026-10-31
Who
Ginkgo Bioworks, Inc.
Detail
Up if: Published IV&V pass or a follow-on production or service acquisition naming Ginkgo Bioworks, Inc. Down if: Failed verification or program close without an operational transition.
The calendarCurrent surveillance or diagnostic-network instrument and exact signatoryhttps://wwwnc.cdc.gov/eid/article/31/13/24-1407_article ·
Date
2026-10-31
Who
Ginkgo Bioworks, Inc.
Detail
Up if: A current CDC, BARDA or other federal award with funded scope and accepted operating milestones. Down if: No renewal, funding contraction, or a new award to a different legal entity or competitor.
The calendarAMDT3 environmental qualification and build progressionhttps://www.sda.mil/space-development-agency-issues-awards-to-build-36-accelerated-missile-defense-tracking-layer-satellites-for-tranche-3-in-support-of-golden-dome-for-america/ ·
Date
2026-10-31
Who
L3Harris Technologies, Inc.
Detail
Up if: Accepted spacecraft milestone, launch assignment or demonstrated fire-control-quality tracking. Down if: Sensor shortfall, environmental-test failure, delivery slip or launch reassignment.
The calendarGPS IIIF delivery and successor-transition evidencehttps://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4467234/space-systems-command-looks-ahead-to-new-era-of-gps-success ·
Date
2026-10-31
Who
Lockheed Martin Corporation
Detail
Up if: Accepted GPS IIIF flight article, assigned launch or successful on-orbit checkout. Down if: Material satellite, launch, control-segment or certification delay.
The calendarHypersonic repeat test and NGI interceptor qualificationhttps://www.war.gov/serve-from-netstorage/News/Releases/Release/Article/4450358/army-and-navy-continue-tests-of-hypersonic-missile/index.html ·
Date
2026-10-31
Who
Lockheed Martin Corporation
Detail
Up if: Repeat successful all-up-round event, qualified production or successful interceptor test. Down if: Flight-test failure, schedule breach, IOC delay or loss of follow-on production.
The calendarQTIME rapid-inspection performance and transitionhttps://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/ ·
Date
2026-10-31
Who
Northrop Grumman Systems Corporation
Detail
Up if: Accepted speed and repeatability result followed by use on a qualified production part. Down if: Metric failure, data-rights dispute or absence of a transition customer.