Skip to content

Which dated decisions in the next year will show whether each NSSTS company's position is real? — saved evidence, page 3

Saved evidence through 2026-08-18. This table projects the linked graphic data; it does not refresh the underlying research.

Return to the graphic · Complete saved JSON

Rows 41–42 of 42. Page 3 of 3.

Section context and qualifications
Uncertainty
  • A gate date is when the package expects a record to exist, not a promise that an agency will act then.
  • Past due means the date passed and the dossier holds no later check; the outcome may exist outside the registry.
SectionRecordSaved detailsSources and dates
The calendarSustained ordering and operating evidence shows whether AWS remains a cross-sector rail rather than a one-period installed position.https://www.energy.gov/nnsa/articles/nnsa-launches-secretrestricted-data-enterprise-cloud-environment-collaboration-amazon ·
Date
2027-06-30
Who
Amazon Web Services, Inc.
Detail
Up if: Repeated funded orders and accepted performance across NNSA and DoW environments. Down if: Material scope contraction, repeated service failure or migration away from AWS.
The calendarPlanned operational prototype delivery reaches government acceptance and authorization.https://www.ssc.spaceforce.mil/Newsroom/Article-Display/Article/4501527/us-space-force-advances-space-data-network-backbone-for-global-warfighter-conne ·
Date
2027-12-31
Who
Space Exploration Technologies Corp.
Detail
Up if: SSC records accepted operational prototype performance and transitions to sustained service. Down if: The prototype misses end-2027 acceptance, is terminated or fails required optical-mesh performance.