Nuclear reactors: rules, milestones and full research
Thirteen historical filings remain preserved through June 16, 2026. This companion projects the saved September 7 reconciliation and separately dated implementation evidence. It is not a complete October 21 rulemaking or reactor census.
Full science study · Complete factual spine and sources · Historical filings graphic
| Filing | Source dates | Later saved research |
|---|---|---|
| EO 14300 — NRC reform | Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22587–22590. | NRC reform direction: decision deadlines and hourly-fee recovery caps require implementation. The approximately 100-to-400 GW aspiration for 2050 is in section 2(c). |
| EO 14301 — DOE testing | Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22591–22593. | DOE laboratory testing and the separate outside-laboratory pilot have different processes. The latter requires sufficient DOE control, not DOE ownership of the land; its research jurisdiction excludes commercial electric-power production. |
| EO 14299 — national-security power | Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22581–22586. | Separate Defense and DOE assignments connect national-security missions, sites and fuel. The Defense operating target is September 30, 2028; the DOE first-site goal is thirty months after signing. |
| EO 14302 — industrial base | Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22595–22599. | Fuel-cycle, workforce, financing and voluntary-agreement directions. Section 4(a) targets five GW of uprates and ten large reactors with complete designs under construction by 2030; the 2050 capacity aspiration belongs to EO 14300. |
| DOE Reactor Pilot selections | Official announcement 2025-08-12; no time established. Criticality target 2026-07-04 is prospective in that source. | Eleven projects across ten companies were initially selected; companies bear project costs. Selection and the July 4, 2026 criticality goal do not themselves establish authorization or achievement. |
| DOE worker-safety comment reopening | Original NOPR published 2026-01-21; extension request dated 2026-02-04; reopening signed 2026-02-24; filed 2026-02-25 08:45; published 2026-02-26, 91 FR 9498–9499; comments through 2026-03-23. | Reopened comments on the January 21 proposed Part 851 rule through March 23. The AFL-CIO request cited review time and affiliate coordination; it is not itself evidence of substantive opposition or a final rule. |
| NRC Part 53 final rule | Rule dated 2026-03-25; filed 2026-03-27 08:45; published 2026-03-30, 91 FR 15696; effective 2026-04-29. Correction dated 2026-04-09; filed 2026-04-10 08:45; published 2026-04-13; effective 2026-04-29. | Optional commercial fission licensing alongside Parts 50 and 52, including light-water designs. Effective April 29; the April 13 correction retained that date. Fusion has a separate rulemaking; this is distinct from the broader EO 14300 overhaul. |
| Part 57 microreactor proposal | Dated 2026-04-29; filed 2026-04-30 08:45; published 2026-05-01, 91 FR 23628–23766. Comments due 2026-06-15 at 23:59 Eastern. Correction filed 2026-05-14 08:45 and published 2026-05-15, 91 FR 27870–27871. | Proposed optional microreactor path for qualifying designs, with conditional construction permission and separate operating approval. The May 15 correction does not finalize the framework. |
| Prior DOE/Defense design evidence | Dated 2026-03-31; filed 2026-04-01 08:45; published 2026-04-02, 91 FR 16584–16588. Comments due 2026-05-04. | Proposed reuse of tested DOE/Defense safety evidence in NRC review, with a mapping to NRC requirements and changed conditions. Authorization alone does not convert into a commercial license. |
| Contested adjudications proposal | Dated 2026-02-27; filed 2026-03-02 08:45; published 2026-03-03, 91 FR 10450. Comments due 2026-04-02. | Proposed changes to merits submissions, discovery and contested proceedings. Filing windows vary; appeals sit outside the fixed EO timeline. |
| Fusion-machine framework proposal | Dated 2026-02-23; filed 2026-02-25 at 08:45 (timezone not specified in filing line); published 2026-02-26, 91 FR 9476–9498. Comments due 2026-05-27. NRC selected the Part 30 approach on 2023-04-13. NEIMA enacted 2019-01-14 already set 2027-12-31; ADVANCE enacted 2024-07-09 retained that date and separately required a section 205(c) report within one year (2025-07-09). No final-rule effective date established by this proposal. | Proposed Part 30 byproduct-material framework, following NRC’s 2023 policy choice and ADVANCE’s substantive definitions. The pre-existing NEIMA deadline and state/project licensing clocks remain separate. |
| FY2026 fee final rule | Dated 2026-06-05; filed 2026-06-15 08:45; published 2026-06-16, 91 FR 36470–36509. General effectiveness 2026-08-17; fixed caps start 2026-10-01. Hourly rates begin with the first full pay period after general effectiveness. | Final fee rule generally effective August 17; fixed caps begin October 1. Hourly billing remains. Caps cover requested activities involving a final safety evaluation; decision deadlines are deferred. |
| Foreign ownership exceptions | Proposal and direct final dated 2026-04-06; filed 2026-04-22 08:45; published 2026-04-23. Confirmation dated 2026-06-03; filed 2026-06-04 08:45; published 2026-06-05. Direct final effective 2026-07-07. | The companion April 23 direct final rule was confirmed June 5 as effective July 7. Exceptions concern listed eligible foreign interests in utilization facilities, subject to NRC’s non-inimicality determination; production-facility restrictions remain. |
Project milestones need separate evidence
Read the separately dated Groves criticality finding. That later event does not answer whether three reactors reached criticality by July 4. Construction permission, fuel loading, criticality, commercial licensing and electricity delivery remain separate.