What FORTRESS America promises—and what is not proved

.html · 1 sections · 2816 characters

Source, owner, and dates

workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/FORTRESS_AMERICA_PROGRAM_TO_PROVED_RESILIENCE_INFOGRAPHIC.html

Canonical source SHA-256: b9227b8d5c542fed9c4910c2f46eeb08b41c11d4b3ef959d9e742b4de46c32c5

Served copy SHA-256: b9227b8d5c542fed9c4910c2f46eeb08b41c11d4b3ef959d9e742b4de46c32c5

Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: fortress-america-installation-energy-independence

html text needs review

What FORTRESS America promises—and what is not proved

Section 1 of 1

What FORTRESS America promises—and what is not proved

Program → portfolio → operating proof

What FORTRESS America promises—and what is not proved

In plain English

What FORTRESS America promises—and what is not proved

Compare the program's five parts with the separate legal requirement for critical loads, then see which bases have plans, funded work, completed systems or tested results.

A five-pillar resilience program whose installation-power objective is real—but whose technical constitution and delivered portfolio still have to be proved.

Current evidence state: program established → implementation constitution not yet public → fleet-wide delivery unproven.

Five mutually dependent pillars

Energy independenceIndependent power for every major U.S. installation

Supply chain + industrial baseMaterials, components, production and skilled capacity

Strategic defense reserveMunitions, fuel, medicine and blood through disruption

Installation hardening + cyberProtection against intrusion, sabotage and drones

Space + spectrumAssured sensing, navigation and communications

Three statements that must not be collapsed

Object Covered boundary Evidence state

FORTRESS Every major U.S. installation; “independent power” undefined Program objective established

10 U.S.C. §2920 Each installation’s critical-mission load 99.9% minimum annual availability required by end FY2030

Next Great American Base One future model installation Completely off-grid design objective, not an operating site

Evidence ladder

Select a state to see the receipt required before a claim can move.

  P0Direction
  P1Scope
  P2Money
  P3Design
  P4Built
  P5Commissioned
  P6Island test
  P7Endurance
  P8Recurring

Where the public record stops

Program direction FORTRESS AmericaSite list, definition and funding unresolved

Selection / negotiation Army SCISix conditional pairings Janus + NWS CranePairings and planned 2028 deployment EielsonNotice of intent; up to 5 MW critical load

Prototype lane Project PeleINL demonstration, not base service

Operational description MCAS YumaFull-load backup described SUBASE New LondonEssential functions McCoy + SigonellaGate / tenant-facility scope

Island test observed MCAS MiramarMission-critical islanding; endurance still separate

Decision rule: an independence claim is only as strong as its load boundary + duration + operating-test receipt.

Evidence cutoff: September 30, 2026 ET. This visual is a governed synthesis of the package record, not a site-readiness certification.