What FORTRESS America promises—and what is not proved Program → portfolio → operating proof What FORTRESS America promises—and what is not proved In plain English What FORTRESS America promises—and what is not proved Compare the program's five parts with the separate legal requirement for critical loads, then see which bases have plans, funded work, completed systems or tested results. A five-pillar resilience program whose installation-power objective is real—but whose technical constitution and delivered portfolio still have to be proved. Current evidence state: program established → implementation constitution not yet public → fleet-wide delivery unproven. Five mutually dependent pillars Energy independenceIndependent power for every major U.S. installation Supply chain + industrial baseMaterials, components, production and skilled capacity Strategic defense reserveMunitions, fuel, medicine and blood through disruption Installation hardening + cyberProtection against intrusion, sabotage and drones Space + spectrumAssured sensing, navigation and communications Three statements that must not be collapsed Object Covered boundary Evidence state FORTRESS Every major U.S. installation; “independent power” undefined Program objective established 10 U.S.C. §2920 Each installation’s critical-mission load 99.9% minimum annual availability required by end FY2030 Next Great American Base One future model installation Completely off-grid design objective, not an operating site Evidence ladder Select a state to see the receipt required before a claim can move. P0Direction P1Scope P2Money P3Design P4Built P5Commissioned P6Island test P7Endurance P8Recurring Where the public record stops Program direction FORTRESS AmericaSite list, definition and funding unresolved Selection / negotiation Army SCISix conditional pairings Janus + NWS CranePairings and planned 2028 deployment EielsonNotice of intent; up to 5 MW critical load Prototype lane Project PeleINL demonstration, not base service Operational description MCAS YumaFull-load backup described SUBASE New LondonEssential functions McCoy + SigonellaGate / tenant-facility scope Island test observed MCAS MiramarMission-critical islanding; endurance still separate Decision rule: an independence claim is only as strong as its load boundary + duration + operating-test receipt. Evidence cutoff: September 30, 2026 ET. This visual is a governed synthesis of the package record, not a site-readiness certification.