# Wave 2C — direct sites: operations, industry, security, science, and delivery
Window: 2026-08-31 00:00:00 EDT through 2026-09-03 20:09:34 EDT
Discovery rule: official operational, technical, program, award, and
oversight sites; Federal Register excluded as the discovery backbone
## Energy, grid, and nuclear
- NRC proposed clarified groundwater standards and streamlined requests to
extend decommissioning timelines for uranium in-situ recovery sites. The
30-day comment clock begins at Federal Register publication. This is a
proposal, not an extension approval, cleanup result, or operating change.
NRC release.
- DOE issued a Carolinas section 202(c) emergency order effective through
11:59 p.m. EDT September 8, authorizing Duke Energy Carolinas to dispatch
specified units and direct backup generation as a last resort before or
during EEA3. Authority is not evidence of dispatch, EEA3, generation, or
avoided outages. Sources: DOE release
and Order 202-26-43.
- DOE CESER and Sandia reported that the C2E2 grid-cyber AI project reduced
data-engineering work from two months to hours and reached 95% source
detection/localization. These are agency-reported project results, not
independent validation, production deployment, customer use, or a grid
outcome. DOE release.
- DOE's annual employment report records gains in natural-gas transmission,
nuclear, coal generation, and electric transmission/distribution. The
measurements do not prove that a named policy caused the change.
DOE release.
## Transport, infrastructure, and federal property
- FAA announced 191 Airport Infrastructure Grants totaling $481 million across
36 states and two territories. The award/selection state is not payment,
construction start, completion, or capacity in service.
FAA release.
- NHTSA linked an eleventh U.S. death to a banned Chinese air-bag inflator and
added a 2018 Equinox to the incident record. This does not establish a
particular importer, route, seller, or general country culpability.
NHTSA release.
- GSA transmitted 103 FY2028–2034 prospective capital-project fact sheets,
totaling approximately $10 billion, to congressional authorizing committees.
GSA also reported a 426-day average approval time and a nearly $50 billion
delinquent-maintenance backlog. The package is projected need and review
material—not approval, appropriation, award, work start, or repair.
GSA release.
## Industrial and military production transitions
- Army described an OTA to AeroVironment as its first Enduring High Energy
Laser production contract. No amount or award date was disclosed; production
award is not delivery, fielding, or combat performance.
Army release.
- Army moved TITAN from prototype to initial production with two delivery
orders totaling $192 million: $127 million to Palantir and $65 million to
Anduril for four Advanced and four Basic systems due over eighteen months.
The orders are not delivery or fielding, and a further FY2027 order is only
anticipated. Army release.
- Anniston Army Depot began a 23-project FORGE modernization initiative. A
$986.97 million OTA included $658.17 million initially obligated, alongside
a $60.1 million architecture/engineering contract. Obligation and kickoff are
not completed construction or increased depot output.
Army release.
- Army's August 31 border-laser article described an August 25 operational
event; Air Force's Grey Wolf article described August 10 IOC; Navy's North
Dakota article described August 20/29 completion and return. They are retained
as out-of-period state enrichments, not falsely dated weekly events. Sources:
Army,
Air Force, and
Navy.
## Science, standards, maps, and operational data
- NOAA Fisheries published a seafood competitiveness roadmap spanning
electronic monitoring, satellite communications, AI/ML, cloud-native
recreational data, uncrewed systems, eDNA, trade screening, and finance and
regulatory reviews. It is a roadmap and planned reform package, not deployed
systems, final rules, or measured output.
Sources: NOAA release
and detailed roadmap.
- USGS released National Geologic Map version 2 with common digital coverage
for all fifty states and most territories and interactive resource/hazard
layers. It is data infrastructure, not a mineral discovery, lease, permit,
mine, or production event. USGS release.
- NIST issued final IR 8615 on secure-hardware lifecycle priorities including
provenance, traceability, SBOMs, attestation, procurement, pilots, and
verification. It is a final report, not binding regulation or deployment.
Sources: notice
and publication.
- NIST also opened comments through October 16 on draft SP 800-38E Rev. 1 for
XTS-AES storage confidentiality, and through October 15 on a pre-draft
revision to the federal IoT device/product cybersecurity catalog. Neither is
final. Sources: XTS-AES draft
and IoT catalog call.
## Agriculture, manufacturing, and competition
- USDA says its Agricultural Data Modernization Plan begins immediately and
covers administrative/mobile data, satellite and geospatial pilots, secure
sharing, and AI/ML evaluation. A plan and pilots are not a completed platform
or proved accuracy gain. USDA release.
- USDA's Ranchers First package describes insurance, conservation, guaranteed-
lending, processor-continuity, and procurement initiatives. These are planned
program changes, not enacted rules, loans, or completed procurements.
USDA release.
- USDA Rural Development announced a $5.85 million precision-manufacturing loan
guarantee tied to a proposed acquisition/consolidation. Award announcement is
not disbursement, transaction close, or added capacity.
USDA release.
- FTC and 22 states sued Amazon over alleged hidden advertising auction
surcharges. A complaint is not adjudicated liability, proven damages, or a
remedy. FTC release.
## Existing-object enrichments
- DOE's Venezuela fact sheet names Chevron, Eni, and GE Vernova and reports
investment/capacity plans. It does not cure the original agreement hold:
controlling agreement text, close, construction, and production remain
unproved. DOE fact sheet.
- Coast Guard's September 3 correction concerns an August 25 $51 million Chase
Hall award, with completion scheduled for August 2028. It repairs the
out-of-period record; it is not a new weekly award.
Coast Guard correction.
## Coverage receipt
| Publisher family |
Status |
Missed |
Enrichment |
Routine/reject |
| DOE / FERC / NRC |
reached; FERC empty |
4 |
1 |
1 |
| FAA / FRA / FHWA / NHTSA |
reached; FRA/FHWA empty |
2 |
0 |
1 |
| Commerce / NIST / NOAA / NTIA / USPTO |
reached or partly dynamic |
4 |
0 |
1 |
| NASA / NSF |
reached |
0 |
0 |
3 |
| EPA / Interior / USGS / BLM |
mixed; EPA unavailable in agent path |
1 |
0 |
2 |
| USDA and subagencies |
reached |
3 |
0 |
4 |
| War / service sites |
selected surfaces reached; not service-wide |
3 |
3 |
1 |
| CISA / FEMA / USCG / CBP |
mixed; several blocked/dynamic |
0 |
1 |
3 |
| GSA / SAM / USASpending |
GSA reached; award systems dynamic/login-gated |
1 |
0 |
0 |
| independent technical and competition agencies |
reached or partly blocked |
1 |
0 |
5 |
| public intelligence surfaces |
reached or search-dynamic |
0 |
0 |
0 |
The service-site line above is limited to the objects reviewed in this wave; it
is not a military-wide completeness receipt. The dedicated reconciliation and
additional service objects are in WAVE_2D_MILITARY_DIRECT_SITES.md.
The agent path could not enumerate EPA reliably, so the controlling operator
ran a separate direct EPA check. That correction is preserved in the direct-
website merge rather than converted into an empty finding.