# Wave 2C — direct sites: operations, industry, security, science, and delivery **Window:** 2026-08-31 00:00:00 EDT through 2026-09-03 20:09:34 EDT **Discovery rule:** official operational, technical, program, award, and oversight sites; Federal Register excluded as the discovery backbone ## Energy, grid, and nuclear - NRC proposed clarified groundwater standards and streamlined requests to extend decommissioning timelines for uranium in-situ recovery sites. The 30-day comment clock begins at Federal Register publication. This is a proposal, not an extension approval, cleanup result, or operating change. [NRC release](https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-076.pdf). - DOE issued a Carolinas section 202(c) emergency order effective through 11:59 p.m. EDT September 8, authorizing Duke Energy Carolinas to dispatch specified units and direct backup generation as a last resort before or during EEA3. Authority is not evidence of dispatch, EEA3, generation, or avoided outages. Sources: [DOE release](https://www.energy.gov/articles/energy-secretary-secures-carolinas-grid-ahead-holiday-weekend) and [Order 202-26-43](https://www.energy.gov/documents/doe-order-no-202-26-43). - DOE CESER and Sandia reported that the C2E2 grid-cyber AI project reduced data-engineering work from two months to hours and reached 95% source detection/localization. These are agency-reported project results, not independent validation, production deployment, customer use, or a grid outcome. [DOE release](https://www.energy.gov/ceser/articles/ceser-and-sandia-national-lab-are-using-ai-safeguard-electric-grid). - DOE's annual employment report records gains in natural-gas transmission, nuclear, coal generation, and electric transmission/distribution. The measurements do not prove that a named policy caused the change. [DOE release](https://www.energy.gov/articles/president-trumps-energy-dominance-agenda-delivering-american-energy-workers). ## Transport, infrastructure, and federal property - FAA announced 191 Airport Infrastructure Grants totaling $481 million across 36 states and two territories. The award/selection state is not payment, construction start, completion, or capacity in service. [FAA release](https://www.faa.gov/newsroom/trumps-transportation-secretary-sean-p-duffy-invests-481-million-ahead-labor-day-weekend). - NHTSA linked an eleventh U.S. death to a banned Chinese air-bag inflator and added a 2018 Equinox to the incident record. This does not establish a particular importer, route, seller, or general country culpability. [NHTSA release](https://www.nhtsa.gov/press-releases/banned-chinese-air-bag-inflator-kills-11th-person-us). - GSA transmitted 103 FY2028–2034 prospective capital-project fact sheets, totaling approximately $10 billion, to congressional authorizing committees. GSA also reported a 426-day average approval time and a nearly $50 billion delinquent-maintenance backlog. The package is projected need and review material—not approval, appropriation, award, work start, or repair. [GSA release](https://www.gsa.gov/about-gsa/newsroom/news-releases/gsa-urges-reform-of-outdated-repair-approval-process-delivers-103-prospective-c-09032026). ## Industrial and military production transitions - Army described an OTA to AeroVironment as its first Enduring High Energy Laser production contract. No amount or award date was disclosed; production award is not delivery, fielding, or combat performance. [Army release](https://www.army.mil/article/295045/army_awards_production_contract_for_enduring_high_energy_laser_system). - Army moved TITAN from prototype to initial production with two delivery orders totaling $192 million: $127 million to Palantir and $65 million to Anduril for four Advanced and four Basic systems due over eighteen months. The orders are not delivery or fielding, and a further FY2027 order is only anticipated. [Army release](https://cpeisw.army.mil/2026/09/01/army-announces-move-to-production-for-titan/). - Anniston Army Depot began a 23-project FORGE modernization initiative. A $986.97 million OTA included $658.17 million initially obligated, alongside a $60.1 million architecture/engineering contract. Obligation and kickoff are not completed construction or increased depot output. [Army release](https://www.army.mil/article/295050/forge_kickoff_marks_new_chapter_in_anniston_army_depot_modernization). - Army's August 31 border-laser article described an August 25 operational event; Air Force's Grey Wolf article described August 10 IOC; Navy's North Dakota article described August 20/29 completion and return. They are retained as out-of-period state enrichments, not falsely dated weekly events. Sources: [Army](https://www.army.mil/article/294984/army_lasers_blast_drones_proving_directed_energy_weapons_are_future), [Air Force](https://www.af.mil/News/Article-Display/Article/4586669/initial-operating-capability-of-mh-139-grey-wolf-announced/), and [Navy](https://www.navy.mil/Press-Office/News-Stories/display-news/Article/4586562/pnsy-returns-north-dakota-to-the-fleet/). ## Science, standards, maps, and operational data - NOAA Fisheries published a seafood competitiveness roadmap spanning electronic monitoring, satellite communications, AI/ML, cloud-native recreational data, uncrewed systems, eDNA, trade screening, and finance and regulatory reviews. It is a roadmap and planned reform package, not deployed systems, final rules, or measured output. Sources: [NOAA release](https://www.fisheries.noaa.gov/media-release/noaa-announces-priorities-promote-science-based-american-seafood-dominance) and [detailed roadmap](https://www.fisheries.noaa.gov/leadership-message/advancing-agency-level-reforms-restore-american-seafood-competitiveness). - USGS released National Geologic Map version 2 with common digital coverage for all fifty states and most territories and interactive resource/hazard layers. It is data infrastructure, not a mineral discovery, lease, permit, mine, or production event. [USGS release](https://www.usgs.gov/news/national-news-release/usgs-cooperative-national-geologic-map-now-covers-50-states-us). - NIST issued final IR 8615 on secure-hardware lifecycle priorities including provenance, traceability, SBOMs, attestation, procurement, pilots, and verification. It is a final report, not binding regulation or deployment. Sources: [notice](https://csrc.nist.gov/News/2026/next-generation-secure-hardware-into-standards) and [publication](https://csrc.nist.gov/pubs/ir/8615/final). - NIST also opened comments through October 16 on draft SP 800-38E Rev. 1 for XTS-AES storage confidentiality, and through October 15 on a pre-draft revision to the federal IoT device/product cybersecurity catalog. Neither is final. Sources: [XTS-AES draft](https://csrc.nist.gov/news/2026/nist-releases-sp-800-38er1-for-comments) and [IoT catalog call](https://csrc.nist.gov/News/2026/nist-s-sp-800-213a-released-for-comments). ## Agriculture, manufacturing, and competition - USDA says its Agricultural Data Modernization Plan begins immediately and covers administrative/mobile data, satellite and geospatial pilots, secure sharing, and AI/ML evaluation. A plan and pilots are not a completed platform or proved accuracy gain. [USDA release](https://www.usda.gov/about-usda/news/press-releases/2026/09/01/secretary-rollins-unveils-plan-modernize-agricultural-data-collection-and-put-farmers-first). - USDA's Ranchers First package describes insurance, conservation, guaranteed- lending, processor-continuity, and procurement initiatives. These are planned program changes, not enacted rules, loans, or completed procurements. [USDA release](https://www.usda.gov/about-usda/news/press-releases/2026/08/31/secretary-rollins-announces-ranchers-first-initiatives-rebuild-great-american-beef-herd). - USDA Rural Development announced a $5.85 million precision-manufacturing loan guarantee tied to a proposed acquisition/consolidation. Award announcement is not disbursement, transaction close, or added capacity. [USDA release](https://www.rd.usda.gov/newsroom/news-release/usda-supports-585m-loan-guarantee-advance-precision-manufacturing-marion-county-oregon). - FTC and 22 states sued Amazon over alleged hidden advertising auction surcharges. A complaint is not adjudicated liability, proven damages, or a remedy. [FTC release](https://www.ftc.gov/news-events/news/press-releases/2026/08/ftc-states-sue-amazon-over-secret-ad-surcharge-scheme). ## Existing-object enrichments - DOE's Venezuela fact sheet names Chevron, Eni, and GE Vernova and reports investment/capacity plans. It does not cure the original agreement hold: controlling agreement text, close, construction, and production remain unproved. [DOE fact sheet](https://www.energy.gov/articles/fact-sheet-delivering-president-trumps-promise-unleash-prosperity-and-security-united). - Coast Guard's September 3 correction concerns an August 25 $51 million Chase Hall award, with completion scheduled for August 2028. It repairs the out-of-period record; it is not a new weekly award. [Coast Guard correction](https://www.news.uscg.mil/Press-Releases/Article/4590151/correction-coast-guard-awards-51-million-contract-for-chase-hall-annex-a-renova/). ## Coverage receipt | Publisher family | Status | Missed | Enrichment | Routine/reject | |---|---|---:|---:|---:| | DOE / FERC / NRC | reached; FERC empty | 4 | 1 | 1 | | FAA / FRA / FHWA / NHTSA | reached; FRA/FHWA empty | 2 | 0 | 1 | | Commerce / NIST / NOAA / NTIA / USPTO | reached or partly dynamic | 4 | 0 | 1 | | NASA / NSF | reached | 0 | 0 | 3 | | EPA / Interior / USGS / BLM | mixed; EPA unavailable in agent path | 1 | 0 | 2 | | USDA and subagencies | reached | 3 | 0 | 4 | | War / service sites | selected surfaces reached; not service-wide | 3 | 3 | 1 | | CISA / FEMA / USCG / CBP | mixed; several blocked/dynamic | 0 | 1 | 3 | | GSA / SAM / USASpending | GSA reached; award systems dynamic/login-gated | 1 | 0 | 0 | | independent technical and competition agencies | reached or partly blocked | 1 | 0 | 5 | | public intelligence surfaces | reached or search-dynamic | 0 | 0 | 0 | The service-site line above is limited to the objects reviewed in this wave; it is not a military-wide completeness receipt. The dedicated reconciliation and additional service objects are in `WAVE_2D_MILITARY_DIRECT_SITES.md`. The agent path could not enumerate EPA reliably, so the controlling operator ran a separate direct EPA check. That correction is preserved in the direct- website merge rather than converted into an empty finding.