.json · 2 sections · 18026 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_process/process_materiality/batch1/FY2027_PROCESS_MATERIALITY_TIMELINE.json
Canonical source SHA-256: d9adff4b61afd94035c23a6a7ed8369250e9506272c56695636f1345b6d56680
Served copy SHA-256: d9adff4b61afd94035c23a6a7ed8369250e9506272c56695636f1345b6d56680
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 2
{ "artifact_type": "read_only_existing_record_audit", "created_date": "2026-09-12", "evidence_cutoff": "2026-09-11T19:55:13-04:00 (inherited from BUDGET_DATA.json)", "question": "Which material FY2027 budget-process clocks are established by the existing package, and which remain unresolved for a credible walkthrough from agency formulation through congressional funding?", "scope": { "reviewed": [ "Research Packages/Federal Budget FY2026-FY2027/BUDGET_DATA.json: budget_cycle and source pointers", "_Working/federal-budget-2026-2027/goal/terra_process/PROCESS_REFERENCE_AUDIT.json: prior primary-object receipt and limits", "Research Packages/Federal Budget FY2026-FY2027/REFERENCE_COVERAGE.json: record identities and current statuses", "Existing SASC FY2027 hearing receipt: only as a dated example of public congressional consideration" ], "not_done": [ "No external retrieval or new primary-source reading.", "No inference about nonpublic agency submissions, OMB passback/appeals, or presidential deliberations.", "No agency-by-agency congressional-justification date census or appropriations-law update after the stated cutoff." ] }, "existing_primary_pointers": [ { "source_id": "a11_25", "primary_object": "OMB Circular A-11 (2025), Section 25, Summary of Requirements", "url": "https://www.whitehouse.gov/wp-content/uploads/2025/08/s25.pdf", "exact_existing_locator": "§25, pp. 1-4; PROCESS_REFERENCE_AUDIT says all six section pages were examined", "use": "FY2027 submission schedule, data-lock schedule, and passback sequence", "reference_coverage_status": "agent_review_pending_primary", "receipt_boundary": "The existing process receipt supersedes this stale-looking ledger label for the specific claims listed there; neither establishes actual agency compliance." }, { "source_id": "a11_22", "primary_object": "OMB Circular A-11 (2025), Section 22, Communications with Congress and the Public and Clearance Requirements", "url": "https://www.whitehouse.gov/wp-content/uploads/2025/08/s22.pdf", "exact_existing_locator": "§22.6, pp. 4-6; existing process receipt and Reference Coverage both record a full six-page examination", "use": "OMB clearance, confidentiality boundary, and public-CJ posting rule", "reference_coverage_status": "examined" }, { "source_id": "usc1105", "primary_object": "31 U.S.C. 1105(a), Budget contents and submission to Congress", "url": "https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1105&num=0&edition=prelim", "exact_existing_locator": "subsection (a); existing process receipt says full saved statute page and operative subsection inspected", "use": "statutory presidential-budget submission window", "reference_coverage_status": "agent_review_pending_primary", "receipt_boundary": "The statute establishes the window, not the actual FY2027 transmission." }, { "source_id": "cbo", "primary_object": "CBO, An Analysis of Spending Proposals in the President's 2027 Budget", "url": "https://www.cbo.gov/publication/62546", "exact_existing_locator": "June 30, 2026; core explanatory material and Tables 1-2 examined in PROCESS_REFERENCE_AUDIT", "use": "independent record that the Administration submitted the FY2027 request on April 3, 2026", "reference_coverage_status": "agent_review_pending_primary", "receipt_boundary": "CBO's report establishes its described receipt/submission date and comparative analysis; it is not the President's transmittal instrument or an FY2027 appropriation." }, { "source_id": "defense_hearing", "primary_object": "Senate Armed Services Committee FY2027 defense-budget hearing", "url": "https://www.armed-services.senate.gov/hearings/to-receive-testimony-on-the-department-of-defense-budget-request-for-fiscal-year-2027-and-the-future-years-defense-program", "exact_existing_locator": "April 30, 2026 hearing; transcript and written-testimony receipt at terra_process/hearings/batch2 through batch5", "use": "verified example of post-request congressional consideration", "reference_coverage_status": "examined", "receipt_boundary": "One committee hearing does not establish a government-wide hearing calendar, congressional approval, or a funding outcome." }, { "source_id": "cr", "primary_object": "H.R. 6500 enrolled text, Continuing Appropriations and Extensions Act, 2027", "url": "https://www.govinfo.gov/content/pkg/BILLS-119hr6500enr/html/BILLS-119hr6500enr.htm", "exact_existing_locator": "Division A §§101-111; existing process receipt examined those sections", "use": "operative FY2027 continuing-appropriations terms", "reference_coverage_status": "agent_review_pending_primary" }, { "source_id": "cr_signed", "primary_object": "White House, Congressional Bill H.R. 6500 Signed into Law", "url": "https://www.whitehouse.gov/briefings-statements/2026/09/congressional-bill-h-r-6500-signed-into-law/", "exact_existing_locator": "September 2, 2026 notice; full substantive notice read in existing process receipt", "use": "signing-date bridge for the continuing resolution", "reference_coverage_status": "agent_review_pending_primary" }, { "source_id": "law_register", "primary_object": "National Archives, Public Laws: Numbers for the Current Session of Congress", "url": "https://www.archives.gov/federal-register/laws/current.html", "exact_existing_locator": "entry for P.L. 119-103/H.R. 6500; page reviewed September 11, 2026 in existing process receipt", "use": "public-law identity/date cross-check", "reference_coverage_status": "agent_review_pending_primary" } ], "timeline": [ { "date_or_period": "2025-09-08", "stage": "agency formulation to OMB", "event": "Initial agency submissions to OMB were scheduled.", "status": "rule/scheduled date verified; actual submissions missing", "source_pointers": ["a11_25 §25 pp.1-4", "BUDGET_DATA.budget_cycle step labeled 'Initial agency submissions to OMB'", "PROCESS_REFERENCE_AUDIT reference a11_25"], "material_limit": "A scheduled deadline does not identify which agency submitted which MAX/estimate/justification package or when OMB received it." }, { "date_or_period": "September-December 2025", "stage": "strategy, performance, and evidence inputs", "event": "A-11 scheduled strategic-plan, performance-plan, evidence-plan, and capacity-assessment drafting alongside the budget process.", "status": "input architecture verified; agency-specific completion/use missing", "source_pointers": ["a11_230 pp.5-6", "a11_240 §240.3", "a11_290 p.5", "BUDGET_DATA.budget_cycle steps with source IDs a11_230/a11_240/a11_290"], "material_limit": "These instructions show intended inputs, not that evidence or performance results determined any FY2027 amount. GAO-26-108516 in the existing process receipt cautions against assuming implementation from the rule alone." }, { "date_or_period": "late November 2025", "stage": "OMB review/passback", "event": "A-11 describes OMB normally returning decisions around this period.", "status": "general process verified; actual FY2027 passback date/outcome missing", "source_pointers": ["a11_25", "BUDGET_DATA.budget_cycle step labeled 'Passback and finalization'", "PROCESS_REFERENCE_AUDIT reference a11_25"], "material_limit": "Passback, appeals, and final presidential decisions are pre-decisional/confidential under A-11 §22 unless separately disclosed. No receipt supports a date, amount, or agency-level outcome." }, { "date_or_period": "2026-01-06", "stage": "executive assembly", "event": "Final agency database lock was scheduled.", "status": "scheduled date verified; actual database lock/compliance missing", "source_pointers": ["a11_25", "BUDGET_DATA.budget_cycle step labeled 'Passback and finalization'"], "material_limit": "A scheduled lock does not prove the submitted data matched the eventual public request." }, { "date_or_period": "2026-01-05 through 2026-02-02", "stage": "President to Congress", "event": "31 U.S.C. 1105(a) set the FY2027 statutory submission window, ending February 2.", "status": "statutory rule verified", "source_pointers": ["usc1105 subsection (a)", "BUDGET_DATA.budget_cycle step with source ID usc1105", "PROCESS_REFERENCE_AUDIT reference usc1105"], "material_limit": "The statute alone neither proves actual transmission nor supplies a consequence analysis for a later date." }, { "date_or_period": "2026-04-03", "stage": "public President's Budget presentation", "event": "CBO identifies April 3 as the Administration's FY2027 submission date, 60 days after the window endpoint.", "status": "actual date verified by existing independent congressional source", "source_pointers": ["cbo June 30, 2026", "BUDGET_DATA.budget_cycle step labeled 'President’s FY2027 request released'", "PROCESS_REFERENCE_AUDIT reference cbo"], "material_limit": "This is not a reconstructed record of each agency's internal submission, OMB decision, or congressional receipt time." }, { "date_or_period": "after each agency's congressional transmission", "stage": "agency congressional justifications and public presentation", "event": "A-11 requires OMB clearance before congressional transmittal and public posting of congressional justifications within two weeks after transmission.", "status": "rule verified; agency-specific transmission/posting dates missing", "source_pointers": ["a11_22 §22.6 pp.4-6", "BUDGET_DATA.budget_cycle step with source ID a11_22", "PROCESS_REFERENCE_AUDIT reference a11_22"], "material_limit": "An agency CJ's web publication date cannot be silently substituted for its congressional-transmission date. The April 3 government-wide submission is not automatically every agency's transmission date." }, { "date_or_period": "2026-04-30", "stage": "congressional consideration", "event": "SASC held a public FY2027 defense-budget/FYDP hearing after the April request.", "status": "actual event verified for this committee only", "source_pointers": ["defense_hearing", "terra_process/hearings/batch2 SASC receipt"], "material_limit": "Hearing advocacy, witness explanations, and committee questions do not enact appropriations or establish all committee timing." }, { "date_or_period": "2026-06-10", "stage": "related enacted multiyear authority", "event": "S.2/Secure America Act was signed as P.L. 119-98 and provided stated FY2026 DHS-related multiyear authority through FY2029.", "status": "enactment identity/date verified in existing process receipt", "source_pointers": ["saa §§101-203", "saa_signed", "law_register", "PROCESS_REFERENCE_AUDIT references saa/saa_signed/law_register"], "material_limit": "This is not a general FY2027 annual appropriations act, nor proof of FY2027 outlays." }, { "date_or_period": "2026-09-02", "stage": "congressional funding", "event": "H.R.6500 was signed as P.L.119-103, supplying continuing appropriations terms for FY2027.", "status": "enactment identity/date verified", "source_pointers": ["cr Division A §§101-111", "cr_signed", "law_register", "PROCESS_REFERENCE_AUDIT references cr/cr_signed/law_register"], "material_limit": "The CR continues specified FY2026 rates subject to restrictions and exceptions; it is not a uniform full-year FY2027 appropriation or evidence of obligations/outlays." },
Section 2 of 2
{
"date_or_period": "2026-10-01 through earliest specified replacement action or 2026-12-11",
"stage": "FY2027 funding availability",
"event": "FY2027 begins under the existing CR's stated temporary authority, unless displaced sooner under its terms.",
"status": "legal clock verified as of cutoff; later appropriations status not reviewed",
"source_pointers": ["cr §106", "BUDGET_DATA.budget_cycle step with source ID cr", "PROCESS_REFERENCE_AUDIT reference cr"],
"material_limit": "The date is an availability endpoint/condition, not an amount, obligation, outlay, or final congressional resolution."
}
], "material_questions_still_unresolved": [ { "question": "Did agencies actually submit their FY2027 initial packages by September 8, 2025, and did submitted data match later public requests?", "current_answer": "Not established by reviewed records. The package has an A-11 scheduled deadline only.", "why_it_matters": "It is the first observable distinction between required formulation inputs and actual compliance." }, { "question": "When did OMB issue passbacks, what were the material decisions, and which agencies appealed?", "current_answer": "Not established by reviewed records. The existing material provides a general schedule/process only, and identifies the deliberative confidentiality boundary.", "why_it_matters": "Without a disclosed passback record, public CJs cannot prove the internal decision sequence." }, { "question": "What is the controlling actual transmittal date for each material agency CJ, and did each public posting occur within two weeks?", "current_answer": "No agency-specific transmission receipt or posting timestamp has been consolidated. Existing web-CJ dates do not answer the transmission question.", "why_it_matters": "It separates public presentation compliance from the President's April 3 government-wide submission." }, { "question": "Which FY2027 appropriations acts, if any, displaced the CR for individual agencies after the September 11, 2026 7:55 p.m. -04:00 cutoff?", "current_answer": "Not reviewed. The existing record establishes only the CR's temporary terms and end condition.", "why_it_matters": "A valid current funding walkthrough needs an act-by-act status check rather than treating the CR as final funding." }, { "question": "How did congressional hearings, committee reports, bills, and enacted funding change particular requests?", "current_answer": "Only selected proceeding-level records are present. The April 30 SASC hearing is a verified example, not an appropriations history.", "why_it_matters": "Hearing testimony explains positions; report/bill/enacted text is needed to establish congressional action." } ], "five_high_value_next_originals": [ { "priority": 1, "object": "President's FY2027 formal transmittal letter and the corresponding House/Senate receiving record", "resolves": "Exact April 3 transmission/receipt chain and the document set transmitted.", "why_high_value": "It directly bridges the statutory deadline, CBO's recorded actual date, and the public budget release without relying only on secondary timing language.", "access_note": "Seek a public White House/OMB original and official congressional record; do not substitute a news release." }, { "priority": 2, "object": "Official agency congressional-justification transmittal letter or committee receipt for each selected material department", "resolves": "Actual CJ transmission dates and the anchor for A-11's two-week posting rule.", "why_high_value": "It is the missing clock behind all publication-timing conclusions.", "access_note": "Start with DoW, DHS, USDA, VA, and the largest materially changed agencies; a posted PDF date alone is insufficient." }, { "priority": 3, "object": "Relevant FY2027 appropriations public laws or enrolled texts that supersede/modify P.L.119-103, plus current National Archives register entries", "resolves": "Whether and when temporary CR funding became account-specific annual law.", "why_high_value": "It determines the legal funding state, which cannot be inferred from request tables, hearings, or CR rates.", "access_note": "Use each enacted law's operative text and effective/availability provisions; do not assume a bill, committee report, or authorization is an appropriation." }, { "priority": 4, "object": "Congressional committee report and enacted appropriations table for a selected major account with a material FY2027 change", "resolves": "The concrete request-to-congressional-action-to-enacted-amount bridge for one demonstrative account.", "why_high_value": "A bounded account bridge will show which part of the public process can be verified without pretending every hearing drove an allocation.", "access_note": "Choose by material change, not by availability; retain requested, committee, enacted, and execution clocks separately." }, { "priority": 5, "object": "Publicly releasable OMB/agency passback or appeal disposition for a selected department, if one exists", "resolves": "Whether any material internal-review outcome can be documented rather than inferred from the final request.", "why_high_value": "It is the only direct route to the OMB-review question.", "access_note": "A-11 §22 identifies a confidentiality barrier. If no authorized public release exists, retain the gap rather than attempting to reconstruct private deliberations." } ], "integration_note": "Reference Coverage retains several seed records as agent_review_pending_primary even though PROCESS_REFERENCE_AUDIT documents bounded primary examination. This is an integration/status discrepancy, not grounds to promote any claim beyond the receipt's stated scope." }