  "artifact_type": "read_only_existing_record_audit",
  "created_date": "2026-09-12",
  "evidence_cutoff": "2026-09-11T19:55:13-04:00 (inherited from BUDGET_DATA.json)",
  "question": "Which material FY2027 budget-process clocks are established by the existing package, and which remain unresolved for a credible walkthrough from agency formulation through congressional funding?",
  "scope": {
    "reviewed": [
      "Research Packages/Federal Budget FY2026-FY2027/BUDGET_DATA.json: budget_cycle and source pointers",
      "_Working/federal-budget-2026-2027/goal/terra_process/PROCESS_REFERENCE_AUDIT.json: prior primary-object receipt and limits",
      "Research Packages/Federal Budget FY2026-FY2027/REFERENCE_COVERAGE.json: record identities and current statuses",
      "Existing SASC FY2027 hearing receipt: only as a dated example of public congressional consideration"
    ],
    "not_done": [
      "No external retrieval or new primary-source reading.",
      "No inference about nonpublic agency submissions, OMB passback/appeals, or presidential deliberations.",
      "No agency-by-agency congressional-justification date census or appropriations-law update after the stated cutoff."
    ]
  },
  "existing_primary_pointers": [
    {
      "source_id": "a11_25",
      "primary_object": "OMB Circular A-11 (2025), Section 25, Summary of Requirements",
      "url": "https://www.whitehouse.gov/wp-content/uploads/2025/08/s25.pdf",
      "exact_existing_locator": "§25, pp. 1-4; PROCESS_REFERENCE_AUDIT says all six section pages were examined",
      "use": "FY2027 submission schedule, data-lock schedule, and passback sequence",
      "reference_coverage_status": "agent_review_pending_primary",
      "receipt_boundary": "The existing process receipt supersedes this stale-looking ledger label for the specific claims listed there; neither establishes actual agency compliance."
    },
    {
      "source_id": "a11_22",
      "primary_object": "OMB Circular A-11 (2025), Section 22, Communications with Congress and the Public and Clearance Requirements",
      "url": "https://www.whitehouse.gov/wp-content/uploads/2025/08/s22.pdf",
      "exact_existing_locator": "§22.6, pp. 4-6; existing process receipt and Reference Coverage both record a full six-page examination",
      "use": "OMB clearance, confidentiality boundary, and public-CJ posting rule",
      "reference_coverage_status": "examined"
    },
    {
      "source_id": "usc1105",
      "primary_object": "31 U.S.C. 1105(a), Budget contents and submission to Congress",
      "url": "https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section1105&num=0&edition=prelim",
      "exact_existing_locator": "subsection (a); existing process receipt says full saved statute page and operative subsection inspected",
      "use": "statutory presidential-budget submission window",
      "reference_coverage_status": "agent_review_pending_primary",
      "receipt_boundary": "The statute establishes the window, not the actual FY2027 transmission."
    },
    {
      "source_id": "cbo",
      "primary_object": "CBO, An Analysis of Spending Proposals in the President's 2027 Budget",
      "url": "https://www.cbo.gov/publication/62546",
      "exact_existing_locator": "June 30, 2026; core explanatory material and Tables 1-2 examined in PROCESS_REFERENCE_AUDIT",
      "use": "independent record that the Administration submitted the FY2027 request on April 3, 2026",
      "reference_coverage_status": "agent_review_pending_primary",
      "receipt_boundary": "CBO's report establishes its described receipt/submission date and comparative analysis; it is not the President's transmittal instrument or an FY2027 appropriation."
    },
    {
      "source_id": "defense_hearing",
      "primary_object": "Senate Armed Services Committee FY2027 defense-budget hearing",
      "url": "https://www.armed-services.senate.gov/hearings/to-receive-testimony-on-the-department-of-defense-budget-request-for-fiscal-year-2027-and-the-future-years-defense-program",
      "exact_existing_locator": "April 30, 2026 hearing; transcript and written-testimony receipt at terra_process/hearings/batch2 through batch5",
      "use": "verified example of post-request congressional consideration",
      "reference_coverage_status": "examined",
      "receipt_boundary": "One committee hearing does not establish a government-wide hearing calendar, congressional approval, or a funding outcome."
    },
    {
      "source_id": "cr",
      "primary_object": "H.R. 6500 enrolled text, Continuing Appropriations and Extensions Act, 2027",
      "url": "https://www.govinfo.gov/content/pkg/BILLS-119hr6500enr/html/BILLS-119hr6500enr.htm",
      "exact_existing_locator": "Division A §§101-111; existing process receipt examined those sections",
      "use": "operative FY2027 continuing-appropriations terms",
      "reference_coverage_status": "agent_review_pending_primary"
    },
    {
      "source_id": "cr_signed",
      "primary_object": "White House, Congressional Bill H.R. 6500 Signed into Law",
      "url": "https://www.whitehouse.gov/briefings-statements/2026/09/congressional-bill-h-r-6500-signed-into-law/",
      "exact_existing_locator": "September 2, 2026 notice; full substantive notice read in existing process receipt",
      "use": "signing-date bridge for the continuing resolution",
      "reference_coverage_status": "agent_review_pending_primary"
    },
    {
      "source_id": "law_register",
      "primary_object": "National Archives, Public Laws: Numbers for the Current Session of Congress",
      "url": "https://www.archives.gov/federal-register/laws/current.html",
      "exact_existing_locator": "entry for P.L. 119-103/H.R. 6500; page reviewed September 11, 2026 in existing process receipt",
      "use": "public-law identity/date cross-check",
      "reference_coverage_status": "agent_review_pending_primary"
    }
  ],
  "timeline": [
    {
      "date_or_period": "2025-09-08",
      "stage": "agency formulation to OMB",
      "event": "Initial agency submissions to OMB were scheduled.",
      "status": "rule/scheduled date verified; actual submissions missing",
      "source_pointers": ["a11_25 §25 pp.1-4", "BUDGET_DATA.budget_cycle step labeled 'Initial agency submissions to OMB'", "PROCESS_REFERENCE_AUDIT reference a11_25"],
      "material_limit": "A scheduled deadline does not identify which agency submitted which MAX/estimate/justification package or when OMB received it."
    },
    {
      "date_or_period": "September-December 2025",
      "stage": "strategy, performance, and evidence inputs",
      "event": "A-11 scheduled strategic-plan, performance-plan, evidence-plan, and capacity-assessment drafting alongside the budget process.",
      "status": "input architecture verified; agency-specific completion/use missing",
      "source_pointers": ["a11_230 pp.5-6", "a11_240 §240.3", "a11_290 p.5", "BUDGET_DATA.budget_cycle steps with source IDs a11_230/a11_240/a11_290"],
      "material_limit": "These instructions show intended inputs, not that evidence or performance results determined any FY2027 amount. GAO-26-108516 in the existing process receipt cautions against assuming implementation from the rule alone."
    },
    {
      "date_or_period": "late November 2025",
      "stage": "OMB review/passback",
      "event": "A-11 describes OMB normally returning decisions around this period.",
      "status": "general process verified; actual FY2027 passback date/outcome missing",
      "source_pointers": ["a11_25", "BUDGET_DATA.budget_cycle step labeled 'Passback and finalization'", "PROCESS_REFERENCE_AUDIT reference a11_25"],
      "material_limit": "Passback, appeals, and final presidential decisions are pre-decisional/confidential under A-11 §22 unless separately disclosed. No receipt supports a date, amount, or agency-level outcome."
    },
    {
      "date_or_period": "2026-01-06",
      "stage": "executive assembly",
      "event": "Final agency database lock was scheduled.",
      "status": "scheduled date verified; actual database lock/compliance missing",
      "source_pointers": ["a11_25", "BUDGET_DATA.budget_cycle step labeled 'Passback and finalization'"],
      "material_limit": "A scheduled lock does not prove the submitted data matched the eventual public request."
    },
    {
      "date_or_period": "2026-01-05 through 2026-02-02",
      "stage": "President to Congress",
      "event": "31 U.S.C. 1105(a) set the FY2027 statutory submission window, ending February 2.",
      "status": "statutory rule verified",
      "source_pointers": ["usc1105 subsection (a)", "BUDGET_DATA.budget_cycle step with source ID usc1105", "PROCESS_REFERENCE_AUDIT reference usc1105"],
      "material_limit": "The statute alone neither proves actual transmission nor supplies a consequence analysis for a later date."
    },
    {
      "date_or_period": "2026-04-03",
      "stage": "public President's Budget presentation",
      "event": "CBO identifies April 3 as the Administration's FY2027 submission date, 60 days after the window endpoint.",
      "status": "actual date verified by existing independent congressional source",
      "source_pointers": ["cbo June 30, 2026", "BUDGET_DATA.budget_cycle step labeled 'President’s FY2027 request released'", "PROCESS_REFERENCE_AUDIT reference cbo"],
      "material_limit": "This is not a reconstructed record of each agency's internal submission, OMB decision, or congressional receipt time."
    },
    {
      "date_or_period": "after each agency's congressional transmission",
      "stage": "agency congressional justifications and public presentation",
      "event": "A-11 requires OMB clearance before congressional transmittal and public posting of congressional justifications within two weeks after transmission.",
      "status": "rule verified; agency-specific transmission/posting dates missing",
      "source_pointers": ["a11_22 §22.6 pp.4-6", "BUDGET_DATA.budget_cycle step with source ID a11_22", "PROCESS_REFERENCE_AUDIT reference a11_22"],
      "material_limit": "An agency CJ's web publication date cannot be silently substituted for its congressional-transmission date. The April 3 government-wide submission is not automatically every agency's transmission date."
    },
    {
      "date_or_period": "2026-04-30",
      "stage": "congressional consideration",
      "event": "SASC held a public FY2027 defense-budget/FYDP hearing after the April request.",
      "status": "actual event verified for this committee only",
      "source_pointers": ["defense_hearing", "terra_process/hearings/batch2 SASC receipt"],
      "material_limit": "Hearing advocacy, witness explanations, and committee questions do not enact appropriations or establish all committee timing."
    },
    {
      "date_or_period": "2026-06-10",
      "stage": "related enacted multiyear authority",
      "event": "S.2/Secure America Act was signed as P.L. 119-98 and provided stated FY2026 DHS-related multiyear authority through FY2029.",
      "status": "enactment identity/date verified in existing process receipt",
      "source_pointers": ["saa §§101-203", "saa_signed", "law_register", "PROCESS_REFERENCE_AUDIT references saa/saa_signed/law_register"],
      "material_limit": "This is not a general FY2027 annual appropriations act, nor proof of FY2027 outlays."
    },
    {
      "date_or_period": "2026-09-02",
      "stage": "congressional funding",
      "event": "H.R.6500 was signed as P.L.119-103, supplying continuing appropriations terms for FY2027.",
      "status": "enactment identity/date verified",
      "source_pointers": ["cr Division A §§101-111", "cr_signed", "law_register", "PROCESS_REFERENCE_AUDIT references cr/cr_signed/law_register"],
      "material_limit": "The CR continues specified FY2026 rates subject to restrictions and exceptions; it is not a uniform full-year FY2027 appropriation or evidence of obligations/outlays."
    },
    {
      "date_or_period": "2026-10-01 through earliest specified replacement action or 2026-12-11",
      "stage": "FY2027 funding availability",
      "event": "FY2027 begins under the existing CR's stated temporary authority, unless displaced sooner under its terms.",
      "status": "legal clock verified as of cutoff; later appropriations status not reviewed",
      "source_pointers": ["cr §106", "BUDGET_DATA.budget_cycle step with source ID cr", "PROCESS_REFERENCE_AUDIT reference cr"],
      "material_limit": "The date is an availability endpoint/condition, not an amount, obligation, outlay, or final congressional resolution."
    }
  ],
  "material_questions_still_unresolved": [
    {
      "question": "Did agencies actually submit their FY2027 initial packages by September 8, 2025, and did submitted data match later public requests?",
      "current_answer": "Not established by reviewed records. The package has an A-11 scheduled deadline only.",
      "why_it_matters": "It is the first observable distinction between required formulation inputs and actual compliance."
    },
    {
      "question": "When did OMB issue passbacks, what were the material decisions, and which agencies appealed?",
      "current_answer": "Not established by reviewed records. The existing material provides a general schedule/process only, and identifies the deliberative confidentiality boundary.",
      "why_it_matters": "Without a disclosed passback record, public CJs cannot prove the internal decision sequence."
    },
    {
      "question": "What is the controlling actual transmittal date for each material agency CJ, and did each public posting occur within two weeks?",
      "current_answer": "No agency-specific transmission receipt or posting timestamp has been consolidated. Existing web-CJ dates do not answer the transmission question.",
      "why_it_matters": "It separates public presentation compliance from the President's April 3 government-wide submission."
    },
    {
      "question": "Which FY2027 appropriations acts, if any, displaced the CR for individual agencies after the September 11, 2026 7:55 p.m. -04:00 cutoff?",
      "current_answer": "Not reviewed. The existing record establishes only the CR's temporary terms and end condition.",
      "why_it_matters": "A valid current funding walkthrough needs an act-by-act status check rather than treating the CR as final funding."
    },
    {
      "question": "How did congressional hearings, committee reports, bills, and enacted funding change particular requests?",
      "current_answer": "Only selected proceeding-level records are present. The April 30 SASC hearing is a verified example, not an appropriations history.",
      "why_it_matters": "Hearing testimony explains positions; report/bill/enacted text is needed to establish congressional action."
    }
  ],
  "five_high_value_next_originals": [
    {
      "priority": 1,
      "object": "President's FY2027 formal transmittal letter and the corresponding House/Senate receiving record",
      "resolves": "Exact April 3 transmission/receipt chain and the document set transmitted.",
      "why_high_value": "It directly bridges the statutory deadline, CBO's recorded actual date, and the public budget release without relying only on secondary timing language.",
      "access_note": "Seek a public White House/OMB original and official congressional record; do not substitute a news release."
    },
    {
      "priority": 2,
      "object": "Official agency congressional-justification transmittal letter or committee receipt for each selected material department",
      "resolves": "Actual CJ transmission dates and the anchor for A-11's two-week posting rule.",
      "why_high_value": "It is the missing clock behind all publication-timing conclusions.",
      "access_note": "Start with DoW, DHS, USDA, VA, and the largest materially changed agencies; a posted PDF date alone is insufficient."
    },
    {
      "priority": 3,
      "object": "Relevant FY2027 appropriations public laws or enrolled texts that supersede/modify P.L.119-103, plus current National Archives register entries",
      "resolves": "Whether and when temporary CR funding became account-specific annual law.",
      "why_high_value": "It determines the legal funding state, which cannot be inferred from request tables, hearings, or CR rates.",
      "access_note": "Use each enacted law's operative text and effective/availability provisions; do not assume a bill, committee report, or authorization is an appropriation."
    },
    {
      "priority": 4,
      "object": "Congressional committee report and enacted appropriations table for a selected major account with a material FY2027 change",
      "resolves": "The concrete request-to-congressional-action-to-enacted-amount bridge for one demonstrative account.",
      "why_high_value": "A bounded account bridge will show which part of the public process can be verified without pretending every hearing drove an allocation.",
      "access_note": "Choose by material change, not by availability; retain requested, committee, enacted, and execution clocks separately."
    },
    {
      "priority": 5,
      "object": "Publicly releasable OMB/agency passback or appeal disposition for a selected department, if one exists",
      "resolves": "Whether any material internal-review outcome can be documented rather than inferred from the final request.",
      "why_high_value": "It is the only direct route to the OMB-review question.",
      "access_note": "A-11 §22 identifies a confidentiality barrier. If no authorized public release exists, retain the gap rather than attempting to reconstruct private deliberations."
    }
  ],
  "integration_note": "Reference Coverage retains several seed records as agent_review_pending_primary even though PROCESS_REFERENCE_AUDIT documents bounded primary examination. This is an integration/status discrepancy, not grounds to promote any claim beyond the receipt's stated scope."
}