.md · 1 sections · 1961 characters
workbench: Research Packages/Federal Government Weekly Delta 2026-10-12/waves/WAVE_3_DEFENSE_INTELLIGENCE.md
Canonical source SHA-256: ea2fa52c8a721f1fd21ad00242bc93a3e47207a43f1f054516a6af9ba0313f05
Served copy SHA-256: ea2fa52c8a721f1fd21ad00242bc93a3e47207a43f1f054516a6af9ba0313f05
Owner evidence cutoffs: {"federal-government-weekly-delta-2026-10-12": "2026-10-12T17:10:00-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-weekly-delta-2026-10-12
Section 1 of 1
# Wave 3 — defense and intelligence
The August 13 memorandum required a plan by October 12 for replacing EMALS and Advanced Weapons Elevators on CVN-81 with steam and hydraulic systems, including timeline and resources. Direct White House, Navy and Department of War searches found the controlling directive and existing records on the electromagnetic systems, but no public plan, delivery confirmation, accepted design, contract change, obligation or construction receipt.
The recipient is the President through OMB and the National Security Advisor, so the plan could be delivered without public release. The watch stays open.
Primary source: August 13 memorandum
## High-risk property at Savannah River
DOE OIG found that Centerra-Savannah River Site did not properly classify or account for thousands of high-risk items and did not perform required assessments before disposition. It also found DOE oversight insufficient and issued four recommendations. The affected property includes protective gear, weapons, ammunition, optics and explosives.
This is a contractor and federal-oversight finding. It does not establish that items were stolen, diverted or used, or that the recommendations are closed.
Primary source: DOE OIG report page
The Department of War release and daily-contract interfaces and the Navy's search surfaces did not yield a reliable October 3–12 inventory. Existing September content was visible. No silence or no-contract conclusion is drawn; the direct routes remain held.