.md · 2 sections · 19762 characters
workbench: Research Packages/Federal Government Weekly Delta 2026-09-16/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md
Canonical source SHA-256: 99ac189bd33c90d64c09788402803762023b3c6d45759b31fc984c0f4e56e107
Served copy SHA-256: 99ac189bd33c90d64c09788402803762023b3c6d45759b31fc984c0f4e56e107
Owner evidence cutoffs: {"federal-government-weekly-delta-2026-09-16": "2026-09-16T19:10:34-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-government-weekly-delta-2026-09-16
Section 1 of 2
# Wave 2C — direct sites: operations, industry, security, science, and delivery
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Inclusive replay: 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11
Discovery rule: official operational, technical, program, award, procurement, and library pages. Federal Register is not discovery. FR objects live in WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md.
Not in this wave: full military/service census (Wave 2D). War/DOE industrial objects that landed on civilian sites may be noted.
Do not recensus: Genesis through 2026-09-09 15:40 EDT; Duane Arnold close; GSA OneGov ChatGPT announcement; FSA AFT as the Sep 3/4 object; Forest Service roadless; EPA RFS deadline.
Award ≠ obligation ≠ payment ≠ delivery ≠ operation. 403 ≠ missing.
## Promotion-review objects (direct-site primary)
### 1. DOE CESER issued Order 202-26-44 keeping Centralia Unit 2 available
Covered as 1C object 6; repeated here because the controlling sources are the DOE newsroom and CESER order page, not FR.
Actor: Secretary Wright; TransAlta Centralia Generation, LLC
Clocks: issued 2026-09-11; effective 2026-09-13 through 2026-12-11. Replaces expired Order 202-26-28 (through 2026-09-12).
URL: news; order page
Disposition: promotion_review
Availability-to-operate order for a coal unit previously scheduled to retire end-2025. Dispatchers named: Gridforce Energy Management, LLC or SPP Western RC. No public MWh or EEA3 receipt on the order page.
Claim limit: Same as 1C. Order PDF linked; not independently hashed here.
### 2. EPA signed the 2024 power-plant carbon-standard partial repeal (newsroom + program page)
Covered as 1C object 5; controlling public announcement is epa.gov, FR book empty at freeze.
URL: news release; EGU GHG page
Disposition: promotion_review (same claim limits as 1C). Pre-publication PDFs listed; HTML of those PDFs not retrieved (JS shells on the listing pages).
### 3. CBP CSMS implemented the Sep 15 Canada §338 HTSUS change
Covered as 1C object 3; controlling operating source is CSMS, not FR.
URL: CSMS #69851916 — sent 2026-09-11 16:49 EDT (after the 09-11 freeze). Attachment: Section 338 Canada Modified HTS LIST eff 091526 (003) Final.docx (unread as line items).
Disposition: promotion_review. 122 added lines; named removals; 9903.03.15 now only with 9903.03.13.
### 4. USDA Rural Development opened ARC ($175 million) for rural nuclear and transmission
Covered as 1C object 8; controlling announcement is rd.usda.gov.
URL: RD release; program page
Disposition: promotion_review. LOI window Oct 19–Nov 20, 2026, 11:59 a.m. ET. NOFO ≠ loan.
### 5. FSA opened ARC/PLC enrollment after completing the ~30 million-acre base allocation
Covered as 1C object 9; controlling source is fsa.usda.gov.
URL: FSA 2026-09-15
Disposition: promotion_review. 2026 enrollment Sep 16–Dec 11; 2027 Nov 2, 2026–Mar 15, 2027. Notifications from Sep 16 via Login.gov. Not a payment.
### 6. DOE CMEI opened the $16 million PROSPECT Planning Prize
Actor: DOE Office of Critical Minerals and Energy Innovation; National Laboratory of the Rockies (American-Made)
Clocks: launched 2026-09-14; submissions due 2026-10-05. Up to $1 million per winner from a $16 million pool.
URL: CMEI prize news; PROSPECT page
Disposition: promotion_review as a prize opening, not a workforce trained.
University planning prize for mining/critical-minerals education pipelines. Funded under the larger (Aug 7) up-to-$100 million PROSPECT initiative. Prize ≠ selection ≠ students enrolled.
Claim limit: Opening ≠ winner ≠ graduate hired. Not the Sep 9 $73 million Mine of the Future selections (09-11 owned).
### 7. NSF opened a $20 million SBIR/STTR commercialization-readiness pilot and added X-Labs topics
Actor: NSF TIP; University of Central Florida NCTI as pilot administrator
Clocks: $20 million two-year pilot announced 2026-09-14; X-Labs additional topics 2026-09-16 (AI for Physical Systems live; From Sequence to Function and Computation at the Limit of Physics previewed). X-Labs RFI comments through 2026-10-30.
URL: SBIR pilot; X-Labs topics
Disposition: promotion_review as funding-opportunity / topic-opening objects.
Pilot is authorized under NSF SBIR/STTR Commercialization Readiness Pilot Program: commercialization funding, mentorship, investor connections, and evaluation of what works. X-Labs completes the CY2026 topic portfolio of the May $1.5 billion initiative. Neither is an award to a named company.
Claim limit: Pilot announcement ≠ small-business award. Topic invitation ≠ funded X-Lab. Sep 10 “golden age of science” letter remains 09-11 folded.
### 8. NRC proposed the reactor-licensing/oversight overhaul (direct-site primary)
Covered as 1C object 12. Discovery is the NRC 2026 news index; the story URL 403’d.
URL: NRC 2026 index — 09/11/2026, 26-077. Long Mott mandatory-hearing advisory 26-029-A (2026-09-14) is a hearing notice, not a COL.
Disposition: promotion_review as proposal. Primary PDF unread.
### 9. DOT announced $1.1 billion in airport grants, including runway-vehicle transmitters
Actor: USDOT / FAA; Secretary Duffy
Clocks: news 2026-09-14. Agency: record $10.9 million to equip 3,000 runway vehicles with transmitters at 61 airports, inside a $1.1 billion airport-upgrade package.
URL: transportation.gov press-releases index reached (press-releases); individual slug 403.
Disposition: promotion_review as an award-announcement with an access limit on the full release.
Keep the ladder: announcement ≠ obligation shown in FAA grant ledger ≠ installed transmitter ≠ NAS performance change. Distinct from the Sep 3 $481 million AIG package (09-03/09-11 fold).
Claim limit: Dollar figure is the department headline. Full grant list not retrieved.
### 10. Westinghouse eVinci reached criticality in a DOE/NNSA test (Sep 3 event; Sep 16 DOE post)
Actor: Westinghouse; Los Alamos / INL / NNSS / NCERC (NNSA facility in Nevada); DOE-NE as publisher
Clocks: criticality 2026-09-03 at 663 °C; peak 1,011 °C claimed as NCERC reactivity-measurement record. DOE-NE article 2026-09-16. Sep 3 is before exclusive start; the official DOE post is in-window.
URL: DOE-NE
Disposition: admit_lower_rank / promotion_review as a test-article criticality, not a commercial reactor.
Heat-pipe TRISO microreactor test article, not a licensed plant, not 5 MWe delivered, not a remote-community or data-center operation. Commercial design still prospective.
Claim limit: Test criticality ≠ NRC license ≠ deployed eVinci. Sep 3 physical event is out of exclusive start; treat the DOE publication as the in-window object.
## Direct-site enrichments of 1C legal objects
These do not replace the FR / signed instruments. They confirm agency-site operation or implementation.
| 1C object | Direct-site confirmation | Limit |
|---|---|---|
| Water-quality EO | WH signed page + fact sheet reached. epa.gov, usda.gov, doi.gov, usace.army.mil no implementing grant, fee, or Corps project instrument retrieved in-window | Revocation ≠ rain-tax repeal |
| Procurement-reciprocity memo | WH signed page + fact sheet reached. gsa.gov newsroom unchanged after 09-10; no FAR/GSAR text | Memo ≠ delisting |
| Canada §338 entry | CSMS #69851916 is the operating object (above). cbp.gov media releases in-window are enforcement/color, not HTSUS | CSMS ≠ annex line-read |
| EPA fuel waiver | Fuel-waivers index content reached via search; HTML JS shell; Sep 8 PDF unread | See 1C clocks |
| EPA power-plant repeal | News + program page reached; PDFs listed not text-pulled | Signed ≠ FR |
| FSA AFT | fsa.usda.gov 09-03 page still the last explainer; effective Oct 1 | No earlier go-live |
| GSA OneGov ChatGPT | GSA 09-10 release still newest AI vehicle news; Buy AI still lists ChatGPT Enterprise “$1 from now until Sep 2026” and the Oct 1 consumption agreement as expected | Announcement ≠ token burned |
| EO 14421 bulk-power | CESER webinar page still points to 2026-09-16 15:00–16:00 ET; RFI comments through Oct 9 | Webinar ≠ covered-equipment list |
| ITAR ASE correction | FR-primary; state.gov DDTC newsroom not separately required | Clerical |
| Boca Chica zone | FR-primary; FAA ATCSCC 09-13 plan lists Starship FLT-14 primary 09-18 as NAS planning, not the zone text | Plan ≠ license |
## Existing-object clocks checked (not new atomics)
| Object | Clock this window | Result |
|---|---|---|
| TransAlta 202-26-28 | through 2026-09-12 | Expired. Functionally succeeded by 202-26-44 (object 1), not extended. |
| DOE Order 202-26-44 | 2026-09-13 … 2026-12-11 | Live. New object. |
| Craig 202-26-31 | through 2026-09-26 | Still live. No new order page. |
| Stanton OUC | through 2026-11-30 | Still live. |
| PJM 202-26-41 / Carolinas 202-26-43 | expired 2026-09-08 | Remain expired. |
| Duane Arnold close | Sep 8 close | No drawdown. EDF project page still “closed on an up to $1.9 billion loan” / “pending NRC licensing.” NRC DAEC page: draft EA comment ended Sep 2; final EA pending; licensing-decision target 2028-01-29. |
| FSA AFT | effective 2026-10-01 | No earlier operational object. |
| GSA OneGov ChatGPT | expected 2026-10-01 | Unchanged. GSA news releases table still tops out 09-10. |
| CESER bulk-power webinar | 2026-09-16 15:00–16:00 ET | Occurred. RFI still open Oct 9. |
| NASA Space Academy RFI | responses 2026-10-26 18:00 EDT | Still open. No site selection. |
| NASA Djibouti Artemis Accords | ceremony 2026-09-14 11:00 EDT (advisory was 09-11) | Signing in-window as scheduled (72nd). Advisory ≠ the signature; treat as clock completion, not a new Accords regime. |
| NASA Crew-13 | targeted “as soon as early October” as of 2026-09-16 ISS blog | Slip is mission-status, not a new vehicle. Oxidizer-valve replacement on Dragon noted. Progress 96 launched 09-16 09:33 EDT; docking targeted 09-19. |
| EPA RFS 2025 reports | due 2026-10-01 | Skip recensus. |
| Roadless NPRM comments | due 2026-10-06 | Skip recensus. |
Section 2 of 2
## Other direct-site objects reviewed and ranked down
## Libraries / procurement / delivery pages
| Surface | Result | Note |
|---|---|---|
| energy.gov newsroom / newsroom-legacy | reached | 202-26-44, IAEA statement, PROSPECT prize, eVinci post; Duane Arnold/mining $73M still listed |
energy.gov CESER 202(c) index doe-electricity-emergency-authorities |
404 (unchanged) | Individual pages reached: 202-26-44 (new), Craig, Stanton. 202-26-28 page still describes the expired order |
| energy.gov/documents/doe-order-no-202-26-44 | linked from order page | PDF not hashed |
| energy.gov/edf/duane-arnold | reached | Close language unchanged |
| commerce.gov/news and /news/blog | reached; empty in exclusive window | Last: G20 Sep 2–3 |
| bis.doc.gov news | no in-window hit | Empty hunt |
| nist.gov news | no in-window hit | Empty hunt |
| census.gov | not recensus’d | NPRM remains 1C/09-11 |
| usda.gov/about-usda/news/press-releases | 403 / Access Denied | Same block as 09-11. Not empty |
| rd.usda.gov newsroom | reached | ARC $175M Sep 14 |
| fsa.usda.gov news | reached | ARC/PLC Sep 15; AFT Sep 3 unchanged |
| doi.gov/news press releases | reached; empty in-window | Latest still pre-window |
| epa.gov newsreleases index | JS shell | Individual releases reached via search + known URLs |
| epa.gov/gasoline-standards/fuel-waivers | JS shell; content via search index | Sep 8 PDF unread |
| transportation.gov briefing-room / press-releases | index reached; $1.1B slug 403 | SPACE/eVTOL remain 09-11 |
| faa.gov newsroom | testimony reached; ADs are FR | ATCSCC plan reached (Starship FLT-14 NAS planning) |
| nasa.gov news-release / 2026-news-releases | reached | Djibouti clock, Crew-12 advisory, NFL update, Progress coverage |
| gsa.gov news releases | reached | Newest still 09-10 OneGov + Fort Worth |
| gsa.gov/artificial-intelligence/buy-ai | reached | Oct 1 ChatGPT vehicle still “expected”; other OneGov prices listed |
| nsf.gov/news | reached | $20M pilot; X-Labs topics |
| nrc.gov 2026 news index | reached | 26-077 row; story URL 403 |
| nrc.gov DAEC plant page | reached | No new restart authorization |
| cbp.gov newsroom / CSMS | CSMS reached; media releases routine | Annex Word unread |
| whitehouse.gov presidential-actions / fact-sheets | reached | Water-quality EO; procurement memo |
| SAM.gov / USAspending / FPDS | not recensus’d | Bounded negative |
| Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject |
|---|---|---|---|---|
| DOE newsroom / EDF / CMEI / CESER / NE | reached | 3 (202-26-44, PROSPECT prize, eVinci post) | 2 (bulk-power webinar; Duane Arnold no-move) | 4 (IAEA remarks, Building America, ASPECT webinar, campuses page) |
| DOE CESER emergency orders | mixed: index 404; 202-26-44 page reached | 1 | 3 expirations/carries checked | 0 |
| NNSA civilian pages | eVinci via DOE-NE | 0 | 0 | test-article only |
| Commerce / NIST / NOAA / ITA / BIS / Census sites | Commerce empty; BIS/NIST empty; ITA via FR; NOAA SBEM out of start | 0 | 0 | 2 |
| USDA department press | blocked 403 | — | — | — |
| FSA / Rural Development | reached | 2 | 1 (AFT still Oct 1) | 0 |
| Interior / BLM / USGS / FWS news | Interior empty in-window | 0 | 0 | 1 |
| EPA newsroom / program pages | mixed: index JS; named releases reached | 2 | 1 (fuel waiver) | 5 (G20, MOU, NEEAC, wetlands, CCR news=FR) |
| DOT / FAA / NHTSA / FRA / FHWA | index reached; $1.1B slug 403 | 1 | 0 | 3 (testimony, ATCSCC, firefighter NPRM is FR) |
| NASA news + blogs | reached | 0 | 2 (Djibouti clock; Crew-13 slip) | 4 |
| GSA news / Buy AI / OneGov | reached | 0 | 1 (Oct 1 still expected) | 0 |
| NSF news | reached | 2 | 1 (Sep 10 letter fold) | 1 (podcast) |
| NRC news / DAEC page | index reached; story 403 | 1 | 1 (DAEC no restart) | 2 (Long Mott/Belews advisories) |
| CBP CSMS / newsroom | CSMS reached | 1 | 0 | media releases |
| Award systems (SAM/USAspending/FPDS) | not enumerated | — | — | bounded |
The service-site line is not opened. eVinci NCERC testing is a civilian DOE/NNSA facility posting; Wave 2D owns a military census if opened.
Closed: yes for the named 2C publisher families above, with access limits left visible: USDA department press 403; CESER 202(c) index 404; EPA news index and fuel-waiver page JS shells (named URLs reached); EPA power-plant and Sep 8 fuel-waiver PDFs unread; NRC 26-077 story 403; transportation.gov $1.1B slug 403; CBP annex Word unread; no SAM/USAspending transaction census. Those are tool-path or scope bounds, not inactivity findings.