# Wave 2C — direct sites: operations, industry, security, science, and delivery **Window:** exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT **Inclusive replay:** 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11 **Discovery rule:** official operational, technical, program, award, procurement, and library pages. **Federal Register is not discovery.** FR objects live in `WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md`. **Not in this wave:** full military/service census (Wave 2D). War/DOE industrial objects that landed on **civilian** sites may be noted. **Do not recensus:** Genesis through 2026-09-09 15:40 EDT; Duane Arnold **close**; GSA OneGov ChatGPT announcement; FSA AFT as the Sep 3/4 object; Forest Service roadless; EPA RFS deadline. Award ≠ obligation ≠ payment ≠ delivery ≠ operation. 403 ≠ missing. ## Promotion-review objects (direct-site primary) ### 1. DOE CESER issued Order 202-26-44 keeping Centralia Unit 2 available Covered as 1C object 6; repeated here because the **controlling sources are the DOE newsroom and CESER order page**, not FR. **Actor:** Secretary Wright; TransAlta Centralia Generation, LLC **Clocks:** issued 2026-09-11; effective **2026-09-13 through 2026-12-11**. Replaces expired Order 202-26-28 (through 2026-09-12). **URL:** [news](https://www.energy.gov/articles/energy-secretary-keeps-northwest-coal-generating-plant-online); [order page](https://www.energy.gov/ceser/federal-power-act-section-202c-transalta-order-no-202-26-44) **Disposition:** `promotion_review` Availability-to-operate order for a coal unit previously scheduled to retire end-2025. Dispatchers named: Gridforce Energy Management, LLC or SPP Western RC. No public MWh or EEA3 receipt on the order page. **Claim limit:** Same as 1C. Order PDF linked; not independently hashed here. ### 2. EPA signed the 2024 power-plant carbon-standard partial repeal (newsroom + program page) Covered as 1C object 5; **controlling public announcement is epa.gov**, FR book empty at freeze. **URL:** [news release](https://www.epa.gov/newsreleases/epa-finalizes-repeal-2024-power-plant-regulations-delivering-300-billion-savings); [EGU GHG page](https://www.epa.gov/stationary-sources-air-pollution/greenhouse-gas-standards-and-guidelines-fossil-fuel-fired-power) **Disposition:** `promotion_review` (same claim limits as 1C). Pre-publication PDFs listed; HTML of those PDFs not retrieved (JS shells on the listing pages). ### 3. CBP CSMS implemented the Sep 15 Canada §338 HTSUS change Covered as 1C object 3; **controlling operating source is CSMS**, not FR. **URL:** [CSMS #69851916](https://content.govdelivery.com/accounts/USDHSCBP/bulletins/429db0c) — sent 2026-09-11 **16:49 EDT** (after the 09-11 freeze). Attachment: `Section 338 Canada Modified HTS LIST eff 091526 (003) Final.docx` (unread as line items). **Disposition:** `promotion_review`. 122 added lines; named removals; 9903.03.15 now only with 9903.03.13. ### 4. USDA Rural Development opened ARC ($175 million) for rural nuclear and transmission Covered as 1C object 8; **controlling announcement is rd.usda.gov**. **URL:** [RD release](https://www.rd.usda.gov/newsroom/news-release/usda-opens-new-175-million-program-expand-rural-nuclear-power-supply-strengthen-americas-grid); [program page](https://www.rd.usda.gov/programs-services/electric-programs/affordable-rural-cooperative-program) **Disposition:** `promotion_review`. LOI window Oct 19–Nov 20, 2026, 11:59 a.m. ET. NOFO ≠ loan. ### 5. FSA opened ARC/PLC enrollment after completing the ~30 million-acre base allocation Covered as 1C object 9; **controlling source is fsa.usda.gov**. **URL:** [FSA 2026-09-15](https://www.fsa.usda.gov/news-events/news/09-15-2026/usda-announces-2026-2027-enrollment-key-price-revenue-safety-net) **Disposition:** `promotion_review`. 2026 enrollment **Sep 16–Dec 11**; 2027 **Nov 2, 2026–Mar 15, 2027**. Notifications from Sep 16 via Login.gov. Not a payment. ### 6. DOE CMEI opened the $16 million PROSPECT Planning Prize **Actor:** DOE Office of Critical Minerals and Energy Innovation; National Laboratory of the Rockies (American-Made) **Clocks:** launched 2026-09-14; submissions due **2026-10-05**. Up to $1 million per winner from a $16 million pool. **URL:** [CMEI prize news](https://www.energy.gov/cmei/articles/energy-department-launches-16-million-prize-grow-mining-and-critical-minerals); [PROSPECT page](https://www.energy.gov/cmei/prospect-providing-opportunities-specialized-education-critical-technologies) **Disposition:** `promotion_review` as a **prize opening**, not a workforce trained. University planning prize for mining/critical-minerals education pipelines. Funded under the larger (Aug 7) up-to-$100 million PROSPECT initiative. Prize ≠ selection ≠ students enrolled. **Claim limit:** Opening ≠ winner ≠ graduate hired. Not the Sep 9 $73 million Mine of the Future selections (09-11 owned). ### 7. NSF opened a $20 million SBIR/STTR commercialization-readiness pilot and added X-Labs topics **Actor:** NSF TIP; University of Central Florida NCTI as pilot administrator **Clocks:** $20 million two-year pilot announced 2026-09-14; X-Labs additional topics 2026-09-16 (AI for Physical Systems live; From Sequence to Function and Computation at the Limit of Physics previewed). X-Labs RFI comments through **2026-10-30**. **URL:** [SBIR pilot](https://www.nsf.gov/news/nsf-launches-20m-pilot-accelerate-commercialization); [X-Labs topics](https://www.nsf.gov/news/nsf-announces-3-additional-topics-part-nsf-x-labs-initiative) **Disposition:** `promotion_review` as **funding-opportunity / topic-opening** objects. Pilot is authorized under NSF SBIR/STTR Commercialization Readiness Pilot Program: commercialization funding, mentorship, investor connections, and evaluation of what works. X-Labs completes the CY2026 topic portfolio of the May $1.5 billion initiative. Neither is an award to a named company. **Claim limit:** Pilot announcement ≠ small-business award. Topic invitation ≠ funded X-Lab. Sep 10 “golden age of science” letter remains 09-11 folded. ### 8. NRC proposed the reactor-licensing/oversight overhaul (direct-site primary) Covered as 1C object 12. **Discovery is the NRC 2026 news index**; the story URL 403’d. **URL:** [NRC 2026 index](https://www.nrc.gov/reading-rm/doc-collections/news/2026/index) — 09/11/2026, 26-077. Long Mott mandatory-hearing advisory 26-029-A (2026-09-14) is a hearing notice, not a COL. **Disposition:** `promotion_review` as proposal. Primary PDF unread. ### 9. DOT announced $1.1 billion in airport grants, including runway-vehicle transmitters **Actor:** USDOT / FAA; Secretary Duffy **Clocks:** news 2026-09-14. Agency: record **$10.9 million** to equip **3,000** runway vehicles with transmitters at **61** airports, inside a **$1.1 billion** airport-upgrade package. **URL:** transportation.gov press-releases index reached ([press-releases](https://www.transportation.gov/newsroom/press-releases)); individual slug **403**. **Disposition:** `promotion_review` as an **award-announcement** with an access limit on the full release. Keep the ladder: announcement ≠ obligation shown in FAA grant ledger ≠ installed transmitter ≠ NAS performance change. Distinct from the Sep 3 $481 million AIG package (09-03/09-11 fold). **Claim limit:** Dollar figure is the department headline. Full grant list not retrieved. ### 10. Westinghouse eVinci reached criticality in a DOE/NNSA test (Sep 3 event; Sep 16 DOE post) **Actor:** Westinghouse; Los Alamos / INL / NNSS / NCERC (NNSA facility in Nevada); DOE-NE as publisher **Clocks:** criticality **2026-09-03** at 663 °C; peak 1,011 °C claimed as NCERC reactivity-measurement record. DOE-NE article **2026-09-16**. Sep 3 is before exclusive start; the **official DOE post** is in-window. **URL:** [DOE-NE](https://www.energy.gov/ne/articles/westinghouse-evinci-microreactor-achieves-criticality-milestone) **Disposition:** `admit_lower_rank` / `promotion_review` as a **test-article criticality**, not a commercial reactor. Heat-pipe TRISO microreactor test article, not a licensed plant, not 5 MWe delivered, not a remote-community or data-center operation. Commercial design still prospective. **Claim limit:** Test criticality ≠ NRC license ≠ deployed eVinci. Sep 3 physical event is out of exclusive start; treat the DOE publication as the in-window object. ## Direct-site enrichments of 1C legal objects These do not replace the FR / signed instruments. They confirm agency-site operation or implementation. | 1C object | Direct-site confirmation | Limit | |---|---|---| | Water-quality EO | WH signed page + fact sheet reached. epa.gov, usda.gov, doi.gov, usace.army.mil **no** implementing grant, fee, or Corps project instrument retrieved in-window | Revocation ≠ rain-tax repeal | | Procurement-reciprocity memo | WH signed page + fact sheet reached. gsa.gov newsroom **unchanged** after 09-10; no FAR/GSAR text | Memo ≠ delisting | | Canada §338 entry | CSMS #69851916 is the operating object (above). cbp.gov media releases in-window are enforcement/color, not HTSUS | CSMS ≠ annex line-read | | EPA fuel waiver | Fuel-waivers index content reached via search; HTML JS shell; Sep 8 PDF unread | See 1C clocks | | EPA power-plant repeal | News + program page reached; PDFs listed not text-pulled | Signed ≠ FR | | FSA AFT | fsa.usda.gov 09-03 page still the last explainer; effective Oct 1 | No earlier go-live | | GSA OneGov ChatGPT | [GSA 09-10 release](https://www.gsa.gov/about-gsa/newsroom/news-releases/gsa-expands-onegov-ai-offerings-with-discounted-openais-chatgpt-09102026) still newest AI vehicle news; [Buy AI](https://www.gsa.gov/artificial-intelligence/buy-ai) still lists ChatGPT Enterprise “$1 from now until Sep 2026” **and** the Oct 1 consumption agreement as expected | Announcement ≠ token burned | | EO 14421 bulk-power | CESER webinar page still points to **2026-09-16 15:00–16:00 ET**; RFI comments through Oct 9 | Webinar ≠ covered-equipment list | | ITAR ASE correction | FR-primary; state.gov DDTC newsroom not separately required | Clerical | | Boca Chica zone | FR-primary; FAA ATCSCC 09-13 plan lists Starship FLT-14 primary **09-18** as NAS planning, not the zone text | Plan ≠ license | ## Existing-object clocks checked (not new atomics) | Object | Clock this window | Result | |---|---|---| | TransAlta 202-26-28 | through 2026-09-12 | **Expired.** Functionally succeeded by 202-26-44 (object 1), not extended. | | DOE Order 202-26-44 | 2026-09-13 … 2026-12-11 | **Live.** New object. | | Craig 202-26-31 | through 2026-09-26 | Still live. No new order page. | | Stanton OUC | through 2026-11-30 | Still live. | | PJM 202-26-41 / Carolinas 202-26-43 | expired 2026-09-08 | Remain expired. | | Duane Arnold close | Sep 8 close | **No drawdown.** [EDF project page](https://www.energy.gov/edf/duane-arnold) still “closed on an up to $1.9 billion loan” / “pending NRC licensing.” NRC DAEC page: draft EA comment ended Sep 2; final EA pending; licensing-decision target **2028-01-29**. | | FSA AFT | effective 2026-10-01 | **No earlier operational object.** | | GSA OneGov ChatGPT | expected 2026-10-01 | **Unchanged.** GSA news releases table still tops out 09-10. | | CESER bulk-power webinar | 2026-09-16 15:00–16:00 ET | Occurred. RFI still open Oct 9. | | NASA Space Academy RFI | responses 2026-10-26 18:00 EDT | Still open. No site selection. | | NASA Djibouti Artemis Accords | ceremony 2026-09-14 11:00 EDT (advisory was 09-11) | Signing **in-window** as scheduled (72nd). Advisory ≠ the signature; treat as clock completion, not a new Accords regime. | | NASA Crew-13 | targeted “as soon as early October” as of 2026-09-16 ISS blog | Slip is mission-status, not a new vehicle. Oxidizer-valve replacement on Dragon noted. Progress 96 launched 09-16 09:33 EDT; docking targeted 09-19. | | EPA RFS 2025 reports | due 2026-10-01 | Skip recensus. | | Roadless NPRM comments | due 2026-10-06 | Skip recensus. | ## Other direct-site objects reviewed and ranked down - **DOE Building America New Construction Support** (2026-09-11): technical-assistance matching for builders; no-cost expert access. Program open, not a construction start. [CMEI](https://www.energy.gov/cmei/articles/doe-launches-new-program-help-builders-cut-construction-costs-and-save-americans) - **DOE ASPECT FOA** (up to $58 million): already 09-11 as Sep 4 notice; Sep 11 webinar / Sep 14 proceedings pages are the same opportunity. Concept papers still 2026-10-09. Opportunity ≠ selection. - **DOE Nuclear Lifecycle Innovation Campuses** page dated 2026-09-14: program description (fuel fabrication / enrichment / reprocessing / waste co-location). Not a siting decision or appropriation. - **DOE IAEA General Conference statement** (2026-09-14, Vienna): remarks, not a financing instrument. - **DOE EDF National Clean Energy Week** panel (Sep 16): appearance, not a close. - **EPA Indiana CCR** news 2026-09-15: same as FR 2026-19027 proposal. Wisconsin CCR remains 09-11 proposal. Not a permit program in force. - **EPA G20 water-reuse initiative** (2026-09-15): outcome document among G20 members; not a U.S. NPDES or SDWA standard. - **EPA–Italy events MOU** (2026-09-15): cooperation on LA28 Olympics circular-economy; not a U.S. regulation. - **EPA NEEAC appointments** (2026-09-14): advisory council, not a rule. - **EPA $3.46 million Pacific Southwest wetlands** (2026-09-14): grant announcement, grouped unless a named plotline needs a project. - **EPA SepticSmart Week** (2026-09-14): campaign. - **NASA X-59 ground engine run** (blog 2026-09-15): test-pilot checkout, not first flight. - **NASA Wallops BOOP! balloon** (2026-09-13): 4h29m scientific balloon, not a launch cadence object. - **NASA/NFL collaboration** (release updated 2026-09-14): outreach. - **NSF Sep 10 leadership letter:** fold (09-11). - **Commerce department news/blog:** newest still G20 Innovation Ministerial Sep 2–3. **Empty in exclusive window** on commerce.gov/news. - **Commerce BIS:** no in-window official BIS news/rule retrieved. Empty hunt, not inactivity of the bureau. - **NIST:** no in-window news/NOFO retrieved. - **NOAA SBEM commercial-satellite IDIQ:** news 2026-09-10 (updated 09-11), effective **2026-09-01**. Out of exclusive start; not treated as new. Fourteen vendors / seven data categories; 5-year base + 5-year option through 2036 is the contract’s own clock, already running. - **Interior press:** no new department-level release retrieved after the 09-11 empty finding (latest previously 2026-08-30). NPR-A remains FR-primary. - **GSA Fort Worth disposition / per diem / capital projects:** 09-11 / 09-03 fold. No newer GSA release. - **FAA Administrator Bedford FY2027 budget testimony** (2026-09-15): oversight/budget, not an ops change. Transformation stats (TDM replacement, electronic strips, SAI, radios, SMRs) are testimony claims. - **NRC Long Mott mandatory hearing advisory** (2026-09-14): hearing scheduled, not a COL issued. Belews Creek ESP hearing remains 09-11. - **Forest Service Roca Honda EIS intent:** FR-primary (1C grouped). ## Libraries / procurement / delivery pages | Surface | Result | Note | |---|---|---| | energy.gov newsroom / newsroom-legacy | reached | 202-26-44, IAEA statement, PROSPECT prize, eVinci post; Duane Arnold/mining $73M still listed | | energy.gov CESER 202(c) index `doe-electricity-emergency-authorities` | **404** (unchanged) | Individual pages reached: 202-26-44 (new), Craig, Stanton. 202-26-28 page still describes the expired order | | energy.gov/documents/doe-order-no-202-26-44 | linked from order page | PDF not hashed | | energy.gov/edf/duane-arnold | reached | Close language unchanged | | commerce.gov/news and /news/blog | reached; **empty in exclusive window** | Last: G20 Sep 2–3 | | bis.doc.gov news | no in-window hit | Empty hunt | | nist.gov news | no in-window hit | Empty hunt | | census.gov | not recensus’d | NPRM remains 1C/09-11 | | usda.gov/about-usda/news/press-releases | **403 / Access Denied** | Same block as 09-11. Not empty | | rd.usda.gov newsroom | reached | ARC $175M Sep 14 | | fsa.usda.gov news | reached | ARC/PLC Sep 15; AFT Sep 3 unchanged | | doi.gov/news press releases | reached; **empty in-window** | Latest still pre-window | | epa.gov newsreleases index | **JS shell** | Individual releases reached via search + known URLs | | epa.gov/gasoline-standards/fuel-waivers | JS shell; content via search index | Sep 8 PDF unread | | transportation.gov briefing-room / press-releases | index reached; **$1.1B slug 403** | SPACE/eVTOL remain 09-11 | | faa.gov newsroom | testimony reached; ADs are FR | ATCSCC plan reached (Starship FLT-14 NAS planning) | | nasa.gov news-release / 2026-news-releases | reached | Djibouti clock, Crew-12 advisory, NFL update, Progress coverage | | gsa.gov news releases | reached | Newest still 09-10 OneGov + Fort Worth | | gsa.gov/artificial-intelligence/buy-ai | reached | Oct 1 ChatGPT vehicle still “expected”; other OneGov prices listed | | nsf.gov/news | reached | $20M pilot; X-Labs topics | | nrc.gov 2026 news index | reached | 26-077 row; story URL **403** | | nrc.gov DAEC plant page | reached | No new restart authorization | | cbp.gov newsroom / CSMS | CSMS reached; media releases routine | Annex Word unread | | whitehouse.gov presidential-actions / fact-sheets | reached | Water-quality EO; procurement memo | | SAM.gov / USAspending / FPDS | not recensus’d | Bounded negative | ## Coverage receipt | Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject | |---|---|---:|---:|---:| | DOE newsroom / EDF / CMEI / CESER / NE | reached | 3 (202-26-44, PROSPECT prize, eVinci post) | 2 (bulk-power webinar; Duane Arnold no-move) | 4 (IAEA remarks, Building America, ASPECT webinar, campuses page) | | DOE CESER emergency orders | mixed: index 404; 202-26-44 page reached | 1 | 3 expirations/carries checked | 0 | | NNSA civilian pages | eVinci via DOE-NE | 0 | 0 | test-article only | | Commerce / NIST / NOAA / ITA / BIS / Census sites | Commerce empty; BIS/NIST empty; ITA via FR; NOAA SBEM out of start | 0 | 0 | 2 | | USDA department press | **blocked 403** | — | — | — | | FSA / Rural Development | reached | 2 | 1 (AFT still Oct 1) | 0 | | Interior / BLM / USGS / FWS news | Interior empty in-window | 0 | 0 | 1 | | EPA newsroom / program pages | mixed: index JS; named releases reached | 2 | 1 (fuel waiver) | 5 (G20, MOU, NEEAC, wetlands, CCR news=FR) | | DOT / FAA / NHTSA / FRA / FHWA | index reached; $1.1B slug 403 | 1 | 0 | 3 (testimony, ATCSCC, firefighter NPRM is FR) | | NASA news + blogs | reached | 0 | 2 (Djibouti clock; Crew-13 slip) | 4 | | GSA news / Buy AI / OneGov | reached | 0 | 1 (Oct 1 still expected) | 0 | | NSF news | reached | 2 | 1 (Sep 10 letter fold) | 1 (podcast) | | NRC news / DAEC page | index reached; story 403 | 1 | 1 (DAEC no restart) | 2 (Long Mott/Belews advisories) | | CBP CSMS / newsroom | CSMS reached | 1 | 0 | media releases | | Award systems (SAM/USAspending/FPDS) | not enumerated | — | — | bounded | The service-site line is **not** opened. eVinci NCERC testing is a civilian DOE/NNSA facility posting; Wave 2D owns a military census if opened. **Closed:** yes for the named 2C publisher families above, with access limits left visible: USDA department press 403; CESER 202(c) index 404; EPA news index and fuel-waiver page JS shells (named URLs reached); EPA power-plant and Sep 8 fuel-waiver PDFs unread; NRC 26-077 story 403; transportation.gov $1.1B slug 403; CBP annex Word unread; no SAM/USAspending transaction census. Those are tool-path or scope bounds, not inactivity findings.