.json · 1 sections · 11982 characters
workbench: _Working/federal-budget-2026-2027/goal/terra_human/va/batch33/VA_FY2027_VOLUME4_PHYSICAL_241_280_AUDIT.json
Canonical source SHA-256: 95958ceb62c55803214b09e020fb31409446a685a937bcd8927d73a5a82962aa
Served copy SHA-256: 95958ceb62c55803214b09e020fb31409446a685a937bcd8927d73a5a82962aa
Owner evidence cutoffs: {"federal-budget-fy2026-fy2027": "2026-09-11T19:55:13-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: federal-budget-fy2026-fy2027
Section 1 of 1
{ "artifact_type": "bounded_full_sequential_CJ_read_receipt", "status": "complete_for_assigned_physical_page_range", "created": "2026-09-11", "source_document": { "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix", "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf", "physical_pdf_page_count_observed_in_official_reader": 502, "local_source_path": "/tmp/va_fy27_volume4.pdf", "source_access": "Official PDF reader and direct local extraction with bundled pypdf from /tmp/va_fy27_volume4.pdf (502 pages)." }, "page_coverage": { "physical_pdf_pages_read": "241-280 inclusive one-based; official-reader indices P240-P279", "printed_content_covered": "6.2-17 through 6.2-56", "sequential_read_method": "All assigned pages read in physical order. FYDP and outyear tables were inspected for headers, time columns, cost class, named methods/authorities, and prospective status; project rows were not transcribed cell by cell.", "next_unread_physical_page_one_based": 281, "next_unread_reader_index": 280, "next_unread_printed_page": "6.2-57", "remaining_scope": "physical pp.281-502 / reader P280-P501" }, "claims_and_boundaries": [ { "printed_pages": "6.2-17 to 6.2-21", "claim": "Table2-4, the 2027 Five-Year Development Plan, gives Total Estimated Cost, funding through FY2026, annual FY2027-31 planned amounts, and remaining need after 2031 for Major Construction projects. It includes some TBD values and future replacement/expansion scenarios.", "status": "future_funding_plan_and_estimates", "boundary": "FYDP entries are planning estimates, not enacted funds, awards, construction, or delivery. Funding-through-FY2026, FY2027-31 plan columns, and need-after-2031 are separate clocks and must not be summed as current funding." }, { "printed_pages": "6.2-22 to 6.2-25", "claim": "VA describes leasing as a potential flexible alternative and identifies OMB Circular A-11 as its budget-treatment framework. It defines NRM-IM and says 2027/2028 advance appropriations support EHRM prerequisite infrastructure. It also describes an activation-cost tool using estimated workload and added/renovated square footage.", "status": "agency_method_and_future_assumption_description", "boundary": "The described flexibility, EHRM support, advance appropriations, A-11 treatment, and activation costs are not evidence of a lease decision, EHRM implementation outcome, funded project, or actual activation expense. The original tool, input data, and A-11 test were not read." }, { "printed_pages": "6.2-26", "claim": "VA calls the $99-$109bn Total Estimated Cost range preliminary planning costs with a mean plus/minus5% range; Table2-7 provides future-years project-type aggregation.", "status": "long_range_cost_model", "boundary": "This range differs in purpose/precision from earlier project-level estimates and is expressly subject to revision. It is not an appropriation, observed total cost, or execution commitment." }, { "printed_pages": "6.2-27 to 6.2-56", "claim": "Table2-8 lists potential future/outyear projects by parent station/cemetery with project type and total estimated cost. It includes Major/Minor Construction, Major/Minor Lease, NRM-IM, and NRM-SUS rows across many sites.", "status": "prospective_outyear_inventory", "boundary": "Each table entry is a potential future/outyear planning item. Names such as EHRM, VA/DoD joint initiative, energy-savings performance contract, FCA deficiency, physical-security assessment, research, PACT, CLC, and program labels are not treated as evidence documents, executed projects, or demonstrated results without separately identified source material." } ], "formulation_inputs_and_named_upstream_objects": [ { "id": "v4_fydp_table24", "identity": "Table2-4 2027 Five-Year Development Plan; TEC; funding-through-FY2026; FY2027-31 plan; remaining need after2031", "type": "VA internal future-funding table", "printed_CJ_pages": [ "6.2-17", "6.2-18", "6.2-19", "6.2-20", "6.2-21" ], "role_in_CJ": "Presents planned Major Construction funding scenarios and outyear needs.", "status": "agency_planning_table_not_independent_evidence", "url": null, "limits": "No underlying project cost model, appropriation, design record, award, or execution evidence read. Table includes TBD fields and plans may change." }, { "id": "v4_circular_a11_lease_budget_treatment", "identity": "OMB Circular A-11 lease budget-treatment test", "type": "OMB guidance", "printed_CJ_pages": [ "6.2-22", "6.2-23" ], "role_in_CJ": "Stated budgetary treatment framework for leases and VA lease-prospectus evaluation.", "status": "cited_in_CJ_not_read_here", "url": "https://www.whitehouse.gov/omb/", "limits": "No current Circular text/test, project-level application, score, lease, or award was read. Earlier threshold/date differences remain recorded in batch32 rather than harmonized." }, { "id": "v4_nrm_statutory_cap_anomaly_crossref", "identity": "38 U.S.C. \u00a78104 and printed reference to 'National Defense Authorization Act for Fiscal Year 2024, P.L.108-136'", "type": "law citation", "printed_CJ_pages": [ "6.2-23", "6.2-24" ], "role_in_CJ": "CJ describes NRM-Sustainment cost limit and NRM-IM/no-cost-limit distinction.", "status": "cited_in_CJ_identity_anomaly_not_resolved", "url": "https://uscode.house.gov/", "limits": "The printed FY2024-NDAA/P.L.108-136 pairing remains anomalous and unverified. It is not corrected or endorsed here." }, { "id": "v4_ehrm_infrastructure", "identity": "Electronic Health Record Modernization (EHRM) prerequisite infrastructure", "type": "program/implementation input", "printed_CJ_pages": [ "6.2-24" ], "role_in_CJ": "CJ says FY2027/FY2028 advance appropriation requests support facilities modifications needed before initial operating capacity and broader implementation.", "status": "described_in_CJ_only_not_evidence_source", "url": null, "limits": "No EHRM plan, facility requirement, advance appropriation, initial-operating-capacity evidence, implementation outcome, or causal evaluation read." }, { "id": "v4_activation_cost_budget_model_tool", "identity": "VA activation cost budget model tool", "type": "agency model", "printed_CJ_pages": [ "6.2-25" ], "role_in_CJ": "Estimates recurring/non-recurring activation needs, including IT, from estimated workload, square footage, geography, and functional category.", "status": "described_in_CJ_only_identity_unresolved", "url": null, "limits": "Tool version, model equation, workload data, square-foot data, calibration, uncertainty, and validation were not supplied/read. Output estimates are not actual activation costs." }, { "id": "v4_table27_future_cost_range", "identity": "Table2-7 VA Capital Investment Projects by Type and $99-$109bn estimated total-cost range", "type": "VA aggregate cost model/table", "printed_CJ_pages": [ "6.2-26" ], "role_in_CJ": "Aggregates preliminary future-years costs by project type, including activation costs.", "status": "agency_model_not_independent_evidence", "url": null, "limits": "CJ labels TECs preliminary planning costs, mean plus/minus5%, and subject to refinement. No input workbook or methodology validation read." }, { "id": "v4_table28_outyear_project_inventory", "identity": "Table2-8 Potential Future/Outyear Projects (sorted by state/parent station/cemetery)", "type": "VA planning inventory", "printed_CJ_pages": [ "6.2-27 to 6.2-56" ], "role_in_CJ": "Lists prospective project labels, type, and total estimated costs.", "status": "agency_prospective_inventory_not_source_evidence", "url": null, "limits": "Rows are not separately sourced studies/evaluations. No project design, business case, market analysis, statute, feasibility study, appropriation, award, construction status, or outcome was read." }, { "id": "v4_named_table_labels_not_sources", "identity": "Named project/program labels in Table2-8: VA/DoD Joint Project Initiative, Energy Savings Performance Contract, FCA/physical-security/Legionella findings, EHRM, PACT, CLC, HPACT, research, and facility programs", "type": "labels or unexpanded input references", "printed_CJ_pages": [ "6.2-17", "6.2-27 to 6.2-56" ], "role_in_CJ": "Part of project title/rationale/category in prospective outyear inventory.", "status": "not_treated_as_individual_evidence_without_identity", "url": null, "limits": "A label is not a source object. Where it points to a possible record, the underlying report, assessment, contract, law, dataset, or implementation record remains unlocated/unread." }, { "id": "v4_energy_savings_performance_contract", "identity": "Energy Savings Performance Contract for Energy Reduction (Asheville row)", "type": "program/contract label", "printed_CJ_pages": [ "6.2-48" ], "role_in_CJ": "Potential NRM-IM project title in Table2-8.", "status": "named_label_not_contract_record", "url": null, "limits": "No contract, energy baseline, savings methodology, performance measurement, or award was identified/read." } ], "accounting_clock_and_measure_handling": { "historical_or_current": [ "Funding-through-FY2026 columns in FYDP", "current stated planning-method descriptions" ], "future_plan_or_model": [ "FY2027-31 and post-2031 FYDP fields", "outyear project entries and total estimated costs", "preliminary TEC mean plus/minus5%; activation model outputs; project type classifications; 2027/28 EHRM-support assertion" ], "distinction": "Future plan/inventory rows do not demonstrate use of a named strategy, project execution, or result. A type label (Major/Minor Construction, Major/Minor Lease, NRM-IM/SUS) establishes table category only." }, "remaining_work": [ "Continue at physical p281 / reader P280 / printed6.2-58; Table2-8 continues.", "Original-source work remains for A-11, \u00a78104/NDAA citation anomaly, EHRM materials, activation model documentation, FYDP cost models, all business cases/action plans, and every identified outyear project.", "Do not infer funding or adoption from an FYDP/outyear-table entry, including rows with stated dollar figures." ], "corrections": [ { "date": "2026-09-11", "scope": "physical241-280 printed-page verification using local PDF", "replaces": { "printed_content_covered": "6.2-18 through 6.2-57", "next_unread_printed_page": "6.2-58", "Table2_4": "6.2-18 to 6.2-21", "activation_tool": "6.2-26", "Table2_7": "6.2-27", "Table2_8": "6.2-28 to 6.2-57" }, "with": { "printed_content_covered": "6.2-17 through 6.2-56", "next_unread_printed_page": "6.2-57", "Table2_4": "6.2-17 to 6.2-21", "activation_tool": "6.2-25", "Table2_7": "6.2-26", "Table2_8": "6.2-27 to 6.2-56" }, "verification": "Bundled pypdf direct extraction of /tmp/va_fy27_volume4.pdf, 502 pages: physical247 header6.2-23; physical250 header6.2-26; physical251 header6.2-27.", "limit": "Correction changes provenance and locators only; no upstream source was read." } ] }