  "artifact_type": "bounded_full_sequential_CJ_read_receipt",
  "status": "complete_for_assigned_physical_page_range",
  "created": "2026-09-11",
  "source_document": {
    "identity": "U.S. Department of Veterans Affairs, FY 2027 Budget Submission, Volume 4 of 5: Construction, Long Range Capital Plan and Appendix",
    "official_url": "https://department.va.gov/wp-content/uploads/2026/04/Volume-4.pdf",
    "physical_pdf_page_count_observed_in_official_reader": 502,
    "local_source_path": "/tmp/va_fy27_volume4.pdf",
    "source_access": "Official PDF reader and direct local extraction with bundled pypdf from /tmp/va_fy27_volume4.pdf (502 pages)."
  },
  "page_coverage": {
    "physical_pdf_pages_read": "241-280 inclusive one-based; official-reader indices P240-P279",
    "printed_content_covered": "6.2-17 through 6.2-56",
    "sequential_read_method": "All assigned pages read in physical order. FYDP and outyear tables were inspected for headers, time columns, cost class, named methods/authorities, and prospective status; project rows were not transcribed cell by cell.",
    "next_unread_physical_page_one_based": 281,
    "next_unread_reader_index": 280,
    "next_unread_printed_page": "6.2-57",
    "remaining_scope": "physical pp.281-502 / reader P280-P501"
  },
  "claims_and_boundaries": [
    {
      "printed_pages": "6.2-17 to 6.2-21",
      "claim": "Table2-4, the 2027 Five-Year Development Plan, gives Total Estimated Cost, funding through FY2026, annual FY2027-31 planned amounts, and remaining need after 2031 for Major Construction projects. It includes some TBD values and future replacement/expansion scenarios.",
      "status": "future_funding_plan_and_estimates",
      "boundary": "FYDP entries are planning estimates, not enacted funds, awards, construction, or delivery. Funding-through-FY2026, FY2027-31 plan columns, and need-after-2031 are separate clocks and must not be summed as current funding."
    },
    {
      "printed_pages": "6.2-22 to 6.2-25",
      "claim": "VA describes leasing as a potential flexible alternative and identifies OMB Circular A-11 as its budget-treatment framework. It defines NRM-IM and says 2027/2028 advance appropriations support EHRM prerequisite infrastructure. It also describes an activation-cost tool using estimated workload and added/renovated square footage.",
      "status": "agency_method_and_future_assumption_description",
      "boundary": "The described flexibility, EHRM support, advance appropriations, A-11 treatment, and activation costs are not evidence of a lease decision, EHRM implementation outcome, funded project, or actual activation expense. The original tool, input data, and A-11 test were not read."
    },
    {
      "printed_pages": "6.2-26",
      "claim": "VA calls the $99-$109bn Total Estimated Cost range preliminary planning costs with a mean plus/minus5% range; Table2-7 provides future-years project-type aggregation.",
      "status": "long_range_cost_model",
      "boundary": "This range differs in purpose/precision from earlier project-level estimates and is expressly subject to revision. It is not an appropriation, observed total cost, or execution commitment."
    },
    {
      "printed_pages": "6.2-27 to 6.2-56",
      "claim": "Table2-8 lists potential future/outyear projects by parent station/cemetery with project type and total estimated cost. It includes Major/Minor Construction, Major/Minor Lease, NRM-IM, and NRM-SUS rows across many sites.",
      "status": "prospective_outyear_inventory",
      "boundary": "Each table entry is a potential future/outyear planning item. Names such as EHRM, VA/DoD joint initiative, energy-savings performance contract, FCA deficiency, physical-security assessment, research, PACT, CLC, and program labels are not treated as evidence documents, executed projects, or demonstrated results without separately identified source material."
    }
  ],
  "formulation_inputs_and_named_upstream_objects": [
    {
      "id": "v4_fydp_table24",
      "identity": "Table2-4 2027 Five-Year Development Plan; TEC; funding-through-FY2026; FY2027-31 plan; remaining need after2031",
      "type": "VA internal future-funding table",
      "printed_CJ_pages": [
        "6.2-17",
        "6.2-18",
        "6.2-19",
        "6.2-20",
        "6.2-21"
      ],
      "role_in_CJ": "Presents planned Major Construction funding scenarios and outyear needs.",
      "status": "agency_planning_table_not_independent_evidence",
      "url": null,
      "limits": "No underlying project cost model, appropriation, design record, award, or execution evidence read. Table includes TBD fields and plans may change."
    },
    {
      "id": "v4_circular_a11_lease_budget_treatment",
      "identity": "OMB Circular A-11 lease budget-treatment test",
      "type": "OMB guidance",
      "printed_CJ_pages": [
        "6.2-22",
        "6.2-23"
      ],
      "role_in_CJ": "Stated budgetary treatment framework for leases and VA lease-prospectus evaluation.",
      "status": "cited_in_CJ_not_read_here",
      "url": "https://www.whitehouse.gov/omb/",
      "limits": "No current Circular text/test, project-level application, score, lease, or award was read. Earlier threshold/date differences remain recorded in batch32 rather than harmonized."
    },
    {
      "id": "v4_nrm_statutory_cap_anomaly_crossref",
      "identity": "38 U.S.C. \u00a78104 and printed reference to 'National Defense Authorization Act for Fiscal Year 2024, P.L.108-136'",
      "type": "law citation",
      "printed_CJ_pages": [
        "6.2-23",
        "6.2-24"
      ],
      "role_in_CJ": "CJ describes NRM-Sustainment cost limit and NRM-IM/no-cost-limit distinction.",
      "status": "cited_in_CJ_identity_anomaly_not_resolved",
      "url": "https://uscode.house.gov/",
      "limits": "The printed FY2024-NDAA/P.L.108-136 pairing remains anomalous and unverified. It is not corrected or endorsed here."
    },
    {
      "id": "v4_ehrm_infrastructure",
      "identity": "Electronic Health Record Modernization (EHRM) prerequisite infrastructure",
      "type": "program/implementation input",
      "printed_CJ_pages": [
        "6.2-24"
      ],
      "role_in_CJ": "CJ says FY2027/FY2028 advance appropriation requests support facilities modifications needed before initial operating capacity and broader implementation.",
      "status": "described_in_CJ_only_not_evidence_source",
      "url": null,
      "limits": "No EHRM plan, facility requirement, advance appropriation, initial-operating-capacity evidence, implementation outcome, or causal evaluation read."
    },
    {
      "id": "v4_activation_cost_budget_model_tool",
      "identity": "VA activation cost budget model tool",
      "type": "agency model",
      "printed_CJ_pages": [
        "6.2-25"
      ],
      "role_in_CJ": "Estimates recurring/non-recurring activation needs, including IT, from estimated workload, square footage, geography, and functional category.",
      "status": "described_in_CJ_only_identity_unresolved",
      "url": null,
      "limits": "Tool version, model equation, workload data, square-foot data, calibration, uncertainty, and validation were not supplied/read. Output estimates are not actual activation costs."
    },
    {
      "id": "v4_table27_future_cost_range",
      "identity": "Table2-7 VA Capital Investment Projects by Type and $99-$109bn estimated total-cost range",
      "type": "VA aggregate cost model/table",
      "printed_CJ_pages": [
        "6.2-26"
      ],
      "role_in_CJ": "Aggregates preliminary future-years costs by project type, including activation costs.",
      "status": "agency_model_not_independent_evidence",
      "url": null,
      "limits": "CJ labels TECs preliminary planning costs, mean plus/minus5%, and subject to refinement. No input workbook or methodology validation read."
    },
    {
      "id": "v4_table28_outyear_project_inventory",
      "identity": "Table2-8 Potential Future/Outyear Projects (sorted by state/parent station/cemetery)",
      "type": "VA planning inventory",
      "printed_CJ_pages": [
        "6.2-27 to 6.2-56"
      ],
      "role_in_CJ": "Lists prospective project labels, type, and total estimated costs.",
      "status": "agency_prospective_inventory_not_source_evidence",
      "url": null,
      "limits": "Rows are not separately sourced studies/evaluations. No project design, business case, market analysis, statute, feasibility study, appropriation, award, construction status, or outcome was read."
    },
    {
      "id": "v4_named_table_labels_not_sources",
      "identity": "Named project/program labels in Table2-8: VA/DoD Joint Project Initiative, Energy Savings Performance Contract, FCA/physical-security/Legionella findings, EHRM, PACT, CLC, HPACT, research, and facility programs",
      "type": "labels or unexpanded input references",
      "printed_CJ_pages": [
        "6.2-17",
        "6.2-27 to 6.2-56"
      ],
      "role_in_CJ": "Part of project title/rationale/category in prospective outyear inventory.",
      "status": "not_treated_as_individual_evidence_without_identity",
      "url": null,
      "limits": "A label is not a source object. Where it points to a possible record, the underlying report, assessment, contract, law, dataset, or implementation record remains unlocated/unread."
    },
    {
      "id": "v4_energy_savings_performance_contract",
      "identity": "Energy Savings Performance Contract for Energy Reduction (Asheville row)",
      "type": "program/contract label",
      "printed_CJ_pages": [
        "6.2-48"
      ],
      "role_in_CJ": "Potential NRM-IM project title in Table2-8.",
      "status": "named_label_not_contract_record",
      "url": null,
      "limits": "No contract, energy baseline, savings methodology, performance measurement, or award was identified/read."
    }
  ],
  "accounting_clock_and_measure_handling": {
    "historical_or_current": [
      "Funding-through-FY2026 columns in FYDP",
      "current stated planning-method descriptions"
    ],
    "future_plan_or_model": [
      "FY2027-31 and post-2031 FYDP fields",
      "outyear project entries and total estimated costs",
      "preliminary TEC mean plus/minus5%; activation model outputs; project type classifications; 2027/28 EHRM-support assertion"
    ],
    "distinction": "Future plan/inventory rows do not demonstrate use of a named strategy, project execution, or result. A type label (Major/Minor Construction, Major/Minor Lease, NRM-IM/SUS) establishes table category only."
  },
  "remaining_work": [
    "Continue at physical p281 / reader P280 / printed6.2-58; Table2-8 continues.",
    "Original-source work remains for A-11, \u00a78104/NDAA citation anomaly, EHRM materials, activation model documentation, FYDP cost models, all business cases/action plans, and every identified outyear project.",
    "Do not infer funding or adoption from an FYDP/outyear-table entry, including rows with stated dollar figures."
  ],
  "corrections": [
    {
      "date": "2026-09-11",
      "scope": "physical241-280 printed-page verification using local PDF",
      "replaces": {
        "printed_content_covered": "6.2-18 through 6.2-57",
        "next_unread_printed_page": "6.2-58",
        "Table2_4": "6.2-18 to 6.2-21",
        "activation_tool": "6.2-26",
        "Table2_7": "6.2-27",
        "Table2_8": "6.2-28 to 6.2-57"
      },
      "with": {
        "printed_content_covered": "6.2-17 through 6.2-56",
        "next_unread_printed_page": "6.2-57",
        "Table2_4": "6.2-17 to 6.2-21",
        "activation_tool": "6.2-25",
        "Table2_7": "6.2-26",
        "Table2_8": "6.2-27 to 6.2-56"
      },
      "verification": "Bundled pypdf direct extraction of /tmp/va_fy27_volume4.pdf, 502 pages: physical247 header6.2-23; physical250 header6.2-26; physical251 header6.2-27.",
      "limit": "Correction changes provenance and locators only; no upstream source was read."
    }
  ]
}