.md · 1 sections · 3886 characters
workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/AUTHORITY_SCOPE_AND_DEFINITION_MAP.md
Canonical source SHA-256: d09c5a6e4af83f300c6d1a49f205798d8a35fb83134bd2e20cdfac01de2d8bc5
Served copy SHA-256: d09c5a6e4af83f300c6d1a49f205798d8a35fb83134bd2e20cdfac01de2d8bc5
Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: fortress-america-installation-energy-independence
Section 1 of 1
# Authority, Scope and Definition Map
Status: current
Cutoff: 2026-09-30 ET
| Layer | Object | What it controls | What it does not prove |
|---|---|---|---|
| department program | FORTRESS America memorandum/release | five pillars, central program, office direction, department support | funding, binding technical standard or site delivery |
| statutory performance | 10 U.S.C. §2920 | each installation's critical-mission energy availability, planning and required information | full-site load or current compliance |
| statutory definitions | 10 U.S.C. §101 | energy resilience, energy security and military installation resilience | FORTRESS-specific implementation |
| master planning | 10 U.S.C. §2864 and UFC 2-100-01 | major-installation plans and resilience/energy components | power project award or readiness |
| construction | 10 U.S.C. §§2815–2816; §2914 ERCIP | resilience construction and life-cycle treatment | operation or successful testing |
| energy agreements | PPA, EUL, ESPC, UESC, §2922a | finance, site rights, energy service and risk allocation | military ownership or automatic wartime access absent terms |
| engineering | UFC 3-550-04 and facility-control cybersecurity criteria | resilient microgrid and control-system design | site acceptance or endurance |
| operating proof | black-start/islanding/endurance exercise | observed start, transfer and load-carrying behavior within test conditions | performance outside the test envelope |
| Term | Current public meaning | FORTRESS boundary |
|---|---|---|
| military installation | statutory base, camp, post, station, yard, center or other covered activity | broader than the announced “major installation” phrase |
| major military installation | §2864 points to the current BSR “large site” definition | likely reference class, but not expressly adopted in the accessible release |
| large site | current BSR surface: at least 100,000 acres or at least 4.5 million building square feet | a site category; multiple sites may belong to an installation |
| installation estate | more than 500 installations and more than 5,000 sites on current official surfaces | neither number is a FORTRESS covered-site count |
| critical mission | §2920 mission-essential defense functions; excludes housing, MWR, exchanges, commissaries and private facilities | important load denominator unless FORTRESS publishes a broader one |
| Term | Proper test |
|---|---|
| on-site generation | asset located on or directly serving the installation |
| distributed energy | generation/storage located near loads; does not itself imply islanding |
| microgrid | bounded controllable loads/resources able to operate grid-connected or islanded |
| islanding | safe electrical separation from external grid while serving defined loads |
| black start | start without off-installation energy, then transfer and carry defined load |
| critical-load resilience | defined mission loads remain available for defined duration |
| full-load resilience | complete installation load served within stated conditions |
| energy net-zero | annual production/accounting equals or exceeds annual use; not outage endurance |
| independent power | undefined in the FORTRESS release; must name load, duration, fuel and operating mode |
| off-grid | normal-operation disconnection from commercial grid; expressly attached to the Next Great American Base, not the current estate |
Do not calculate a FORTRESS installation count from the public estate totals or the BSR threshold. First obtain the program's authoritative covered-site list. Do not treat a large site's acreage or building area as an energy-load proxy. Do not assume that installation headquarters, geographically separate sites and tenant facilities share one electrical boundary.