Authority, Scope and Definition Map

.md · 1 sections · 3886 characters

Source, owner, and dates

workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/AUTHORITY_SCOPE_AND_DEFINITION_MAP.md

Canonical source SHA-256: d09c5a6e4af83f300c6d1a49f205798d8a35fb83134bd2e20cdfac01de2d8bc5

Served copy SHA-256: d09c5a6e4af83f300c6d1a49f205798d8a35fb83134bd2e20cdfac01de2d8bc5

Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: fortress-america-installation-energy-independence

Authority, Scope and Definition Map

Section 1 of 1

# Authority, Scope and Definition Map

Status: current Cutoff: 2026-09-30 ET

## 1. Authority stack

Layer Object What it controls What it does not prove
department program FORTRESS America memorandum/release five pillars, central program, office direction, department support funding, binding technical standard or site delivery
statutory performance 10 U.S.C. §2920 each installation's critical-mission energy availability, planning and required information full-site load or current compliance
statutory definitions 10 U.S.C. §101 energy resilience, energy security and military installation resilience FORTRESS-specific implementation
master planning 10 U.S.C. §2864 and UFC 2-100-01 major-installation plans and resilience/energy components power project award or readiness
construction 10 U.S.C. §§2815–2816; §2914 ERCIP resilience construction and life-cycle treatment operation or successful testing
energy agreements PPA, EUL, ESPC, UESC, §2922a finance, site rights, energy service and risk allocation military ownership or automatic wartime access absent terms
engineering UFC 3-550-04 and facility-control cybersecurity criteria resilient microgrid and control-system design site acceptance or endurance
operating proof black-start/islanding/endurance exercise observed start, transfer and load-carrying behavior within test conditions performance outside the test envelope

## 2. Scope terms

Term Current public meaning FORTRESS boundary
military installation statutory base, camp, post, station, yard, center or other covered activity broader than the announced “major installation” phrase
major military installation §2864 points to the current BSR “large site” definition likely reference class, but not expressly adopted in the accessible release
large site current BSR surface: at least 100,000 acres or at least 4.5 million building square feet a site category; multiple sites may belong to an installation
installation estate more than 500 installations and more than 5,000 sites on current official surfaces neither number is a FORTRESS covered-site count
critical mission §2920 mission-essential defense functions; excludes housing, MWR, exchanges, commissaries and private facilities important load denominator unless FORTRESS publishes a broader one

## 3. Capability terms

Term Proper test
on-site generation asset located on or directly serving the installation
distributed energy generation/storage located near loads; does not itself imply islanding
microgrid bounded controllable loads/resources able to operate grid-connected or islanded
islanding safe electrical separation from external grid while serving defined loads
black start start without off-installation energy, then transfer and carry defined load
critical-load resilience defined mission loads remain available for defined duration
full-load resilience complete installation load served within stated conditions
energy net-zero annual production/accounting equals or exceeds annual use; not outage endurance
independent power undefined in the FORTRESS release; must name load, duration, fuel and operating mode
off-grid normal-operation disconnection from commercial grid; expressly attached to the Next Great American Base, not the current estate

## 4. Scope ruling

Do not calculate a FORTRESS installation count from the public estate totals or the BSR threshold. First obtain the program's authoritative covered-site list. Do not treat a large site's acreage or building area as an energy-load proxy. Do not assume that installation headquarters, geographically separate sites and tenant facilities share one electrical boundary.