# Authority, Scope and Definition Map **Status:** `current` **Cutoff:** 2026-09-30 ET ## 1. Authority stack | Layer | Object | What it controls | What it does not prove | |---|---|---|---| | department program | FORTRESS America memorandum/release | five pillars, central program, office direction, department support | funding, binding technical standard or site delivery | | statutory performance | 10 U.S.C. §2920 | each installation's critical-mission energy availability, planning and required information | full-site load or current compliance | | statutory definitions | 10 U.S.C. §101 | energy resilience, energy security and military installation resilience | FORTRESS-specific implementation | | master planning | 10 U.S.C. §2864 and UFC 2-100-01 | major-installation plans and resilience/energy components | power project award or readiness | | construction | 10 U.S.C. §§2815–2816; §2914 ERCIP | resilience construction and life-cycle treatment | operation or successful testing | | energy agreements | PPA, EUL, ESPC, UESC, §2922a | finance, site rights, energy service and risk allocation | military ownership or automatic wartime access absent terms | | engineering | UFC 3-550-04 and facility-control cybersecurity criteria | resilient microgrid and control-system design | site acceptance or endurance | | operating proof | black-start/islanding/endurance exercise | observed start, transfer and load-carrying behavior within test conditions | performance outside the test envelope | ## 2. Scope terms | Term | Current public meaning | FORTRESS boundary | |---|---|---| | military installation | statutory base, camp, post, station, yard, center or other covered activity | broader than the announced “major installation” phrase | | major military installation | §2864 points to the current BSR “large site” definition | likely reference class, but not expressly adopted in the accessible release | | large site | current BSR surface: at least 100,000 acres or at least 4.5 million building square feet | a site category; multiple sites may belong to an installation | | installation estate | more than 500 installations and more than 5,000 sites on current official surfaces | neither number is a FORTRESS covered-site count | | critical mission | §2920 mission-essential defense functions; excludes housing, MWR, exchanges, commissaries and private facilities | important load denominator unless FORTRESS publishes a broader one | ## 3. Capability terms | Term | Proper test | |---|---| | on-site generation | asset located on or directly serving the installation | | distributed energy | generation/storage located near loads; does not itself imply islanding | | microgrid | bounded controllable loads/resources able to operate grid-connected or islanded | | islanding | safe electrical separation from external grid while serving defined loads | | black start | start without off-installation energy, then transfer and carry defined load | | critical-load resilience | defined mission loads remain available for defined duration | | full-load resilience | complete installation load served within stated conditions | | energy net-zero | annual production/accounting equals or exceeds annual use; not outage endurance | | independent power | undefined in the FORTRESS release; must name load, duration, fuel and operating mode | | off-grid | normal-operation disconnection from commercial grid; expressly attached to the Next Great American Base, not the current estate | ## 4. Scope ruling Do not calculate a FORTRESS installation count from the public estate totals or the BSR threshold. First obtain the program's authoritative covered-site list. Do not treat a large site's acreage or building area as an energy-load proxy. Do not assume that installation headquarters, geographically separate sites and tenant facilities share one electrical boundary.