Source, owner, and dates

workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/CLAIM_AUDIT.md

Canonical source SHA-256: 29a5c9e203a6067e919964f257c558bac8f4695e58da3228dbc16772b311bb8d

Served copy SHA-256: 29a5c9e203a6067e919964f257c558bac8f4695e58da3228dbc16772b311bb8d

Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: fortress-america-installation-energy-independence

Claim Audit

Section 1 of 1

# Claim Audit

Status: current Cutoff: 2026-09-30 ET

ID Claim Ruling Correction
FA-01 Every U.S. military base will be energy self-sufficient. Overstated Accessible announcement says every major installation should generate independent power; scope and technical meaning remain undefined.
FA-02 All major installations are already independent. False Program establishment is not site delivery.
FA-03 “Independent power” means permanently off-grid. False Existing microgrid strategy is normally grid-connected with island capability. Complete off-grid design is stated for the separate Next Great American Base.
FA-04 FORTRESS covers only electricity. Not established Announcement uses power/energy language; §2920's energy definition also includes natural gas, steam, chilled water and heated water. Implementation must say what FORTRESS includes.
FA-05 “Major installation” obviously means all bases. False Current statutory planning usage points to BSR “large sites”; the release does not publish a FORTRESS list.
FA-06 The 99.9% statute requires every installation's full load. False It covers the load required for critical missions.
FA-07 99.9% availability equals multi-day island endurance. False Annual availability and continuous outage endurance are different measures.
FA-08 Net-zero proves outage resilience. False Annual energy accounting does not prove start, transfer, islanding, fuel or load-carrying performance.
FA-09 A microgrid automatically creates independent power. False Generation, storage, controls, distribution, fuel, operator, cyber protection and tested islanding must work together.
FA-10 On-base generation is government-owned. False Utility, lease, PPA and contractor-owned models can locate assets on military land.
FA-11 The six Army SCI selections are completed plants. False They are conditional lease-solicitation awards; agreements, finance, construction and tests remain.
FA-12 Janus means five operating Army reactors. False Vendor/site selection begins milestone paths; licensing/authorization, construction, criticality and power delivery remain.
FA-13 Project Pele will power a named base. False at cutoff It is a transportable prototype demonstration at INL.
FA-14 Fort McCoy and Sigonella prove entire bases can run 14 days. False The public scopes are the Main Gate/nearby facilities and DLA tenant facilities respectively.
FA-15 MCAS Miramar's 21-day design statement means a 21-day full-base test occurred. Not established Public material separately describes design capacity and a mission-critical islanding exercise.
FA-16 FYDP alignment means the program is funded. False Programming is not appropriation, transfer, obligation, executed agreement or payment.
FA-17 FORTRESS created the military's first installation-energy policy. False Statute, plans, project finance, microgrids and exercises predate it. The new object is central synchronization.
FA-18 One successful black-start test proves sustained readiness. False Maintenance, trained operators, fuel, cyber posture, recurring exercise and changed loads remain.

## Negative findings