.md · 1 sections · 3885 characters
workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/CLAIM_AUDIT.md
Canonical source SHA-256: 29a5c9e203a6067e919964f257c558bac8f4695e58da3228dbc16772b311bb8d
Served copy SHA-256: 29a5c9e203a6067e919964f257c558bac8f4695e58da3228dbc16772b311bb8d
Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: fortress-america-installation-energy-independence
Section 1 of 1
Status: current
Cutoff: 2026-09-30 ET
| ID | Claim | Ruling | Correction |
|---|---|---|---|
| FA-01 | Every U.S. military base will be energy self-sufficient. | Overstated | Accessible announcement says every major installation should generate independent power; scope and technical meaning remain undefined. |
| FA-02 | All major installations are already independent. | False | Program establishment is not site delivery. |
| FA-03 | “Independent power” means permanently off-grid. | False | Existing microgrid strategy is normally grid-connected with island capability. Complete off-grid design is stated for the separate Next Great American Base. |
| FA-04 | FORTRESS covers only electricity. | Not established | Announcement uses power/energy language; §2920's energy definition also includes natural gas, steam, chilled water and heated water. Implementation must say what FORTRESS includes. |
| FA-05 | “Major installation” obviously means all bases. | False | Current statutory planning usage points to BSR “large sites”; the release does not publish a FORTRESS list. |
| FA-06 | The 99.9% statute requires every installation's full load. | False | It covers the load required for critical missions. |
| FA-07 | 99.9% availability equals multi-day island endurance. | False | Annual availability and continuous outage endurance are different measures. |
| FA-08 | Net-zero proves outage resilience. | False | Annual energy accounting does not prove start, transfer, islanding, fuel or load-carrying performance. |
| FA-09 | A microgrid automatically creates independent power. | False | Generation, storage, controls, distribution, fuel, operator, cyber protection and tested islanding must work together. |
| FA-10 | On-base generation is government-owned. | False | Utility, lease, PPA and contractor-owned models can locate assets on military land. |
| FA-11 | The six Army SCI selections are completed plants. | False | They are conditional lease-solicitation awards; agreements, finance, construction and tests remain. |
| FA-12 | Janus means five operating Army reactors. | False | Vendor/site selection begins milestone paths; licensing/authorization, construction, criticality and power delivery remain. |
| FA-13 | Project Pele will power a named base. | False at cutoff | It is a transportable prototype demonstration at INL. |
| FA-14 | Fort McCoy and Sigonella prove entire bases can run 14 days. | False | The public scopes are the Main Gate/nearby facilities and DLA tenant facilities respectively. |
| FA-15 | MCAS Miramar's 21-day design statement means a 21-day full-base test occurred. | Not established | Public material separately describes design capacity and a mission-critical islanding exercise. |
| FA-16 | FYDP alignment means the program is funded. | False | Programming is not appropriation, transfer, obligation, executed agreement or payment. |
| FA-17 | FORTRESS created the military's first installation-energy policy. | False | Statute, plans, project finance, microgrids and exercises predate it. The new object is central synchronization. |
| FA-18 | One successful black-start test proves sustained readiness. | False | Maintenance, trained operators, fuel, cyber posture, recurring exercise and changed loads remain. |