# Claim Audit **Status:** `current` **Cutoff:** 2026-09-30 ET | ID | Claim | Ruling | Correction | |---|---|---|---| | FA-01 | Every U.S. military base will be energy self-sufficient. | **Overstated** | Accessible announcement says every **major** installation should generate independent power; scope and technical meaning remain undefined. | | FA-02 | All major installations are already independent. | **False** | Program establishment is not site delivery. | | FA-03 | “Independent power” means permanently off-grid. | **False** | Existing microgrid strategy is normally grid-connected with island capability. Complete off-grid design is stated for the separate Next Great American Base. | | FA-04 | FORTRESS covers only electricity. | **Not established** | Announcement uses power/energy language; §2920's energy definition also includes natural gas, steam, chilled water and heated water. Implementation must say what FORTRESS includes. | | FA-05 | “Major installation” obviously means all bases. | **False** | Current statutory planning usage points to BSR “large sites”; the release does not publish a FORTRESS list. | | FA-06 | The 99.9% statute requires every installation's full load. | **False** | It covers the load required for critical missions. | | FA-07 | 99.9% availability equals multi-day island endurance. | **False** | Annual availability and continuous outage endurance are different measures. | | FA-08 | Net-zero proves outage resilience. | **False** | Annual energy accounting does not prove start, transfer, islanding, fuel or load-carrying performance. | | FA-09 | A microgrid automatically creates independent power. | **False** | Generation, storage, controls, distribution, fuel, operator, cyber protection and tested islanding must work together. | | FA-10 | On-base generation is government-owned. | **False** | Utility, lease, PPA and contractor-owned models can locate assets on military land. | | FA-11 | The six Army SCI selections are completed plants. | **False** | They are conditional lease-solicitation awards; agreements, finance, construction and tests remain. | | FA-12 | Janus means five operating Army reactors. | **False** | Vendor/site selection begins milestone paths; licensing/authorization, construction, criticality and power delivery remain. | | FA-13 | Project Pele will power a named base. | **False at cutoff** | It is a transportable prototype demonstration at INL. | | FA-14 | Fort McCoy and Sigonella prove entire bases can run 14 days. | **False** | The public scopes are the Main Gate/nearby facilities and DLA tenant facilities respectively. | | FA-15 | MCAS Miramar's 21-day design statement means a 21-day full-base test occurred. | **Not established** | Public material separately describes design capacity and a mission-critical islanding exercise. | | FA-16 | FYDP alignment means the program is funded. | **False** | Programming is not appropriation, transfer, obligation, executed agreement or payment. | | FA-17 | FORTRESS created the military's first installation-energy policy. | **False** | Statute, plans, project finance, microgrids and exercises predate it. The new object is central synchronization. | | FA-18 | One successful black-start test proves sustained readiness. | **False** | Maintenance, trained operators, fuel, cyber posture, recurring exercise and changed loads remain. | ## Negative findings - No authoritative FORTRESS covered-installation list was located. - No public FORTRESS load, duration, fuel, technology, cyber or acceptance standard was located. - No FORTRESS funding total, budget line, appropriation, transfer or obligation was located. - No public crosswalk assigning existing installation-energy programs to the new office was located. - The signed memorandum PDF remained inaccessible in this environment; memorandum-only text is not treated as visually verified custody.