.md · 1 sections · 8183 characters
workbench: Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PHASE_5_PROGRAM_DOSSIER_CONSTITUTION_2026-08-18.md
Canonical source SHA-256: 73b23101fece97ab7012dd6d0a6fd45bb9bcf06e4493e8a21c49d5523ae2c3ca
Served copy SHA-256: 73b23101fece97ab7012dd6d0a6fd45bb9bcf06e4493e8a21c49d5523ae2c3ca
Owner evidence cutoffs: {"nssts-technology-company-map": "2026-08-19", "nssts-program-acceptance-economy": "2026-08-19"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: nssts-technology-company-map, nssts-program-acceptance-economy
Section 1 of 1
# NSSTS Phase 5 Program-Dossier Constitution
Evidence cutoff: 2026-08-18
Status: active workbench research method
Boundary: standalone from the Federal Group; no vault or Observatory promotion authorized
Waves 1–4 ask which companies are positioned to support the technology buildout. Phase 5 reverses the lens. The controlling object is a federal program, portfolio, facility, solicitation, project call or operating acquisition surface. Companies join only through evidence-bearing positions inside that object.
mission demand
-> exact federal owner and program office
-> budget / authority / acquisition instrument
-> public requirement and contender field
-> award, task or negotiation state
-> facility and capacity dependencies
-> test, authorization and qualification
-> accepted operation or production
This phase does not rank companies. It asks which public evidence can and cannot distinguish an eventual performer, transition or acceptance outcome.
| Type | Meaning | Required boundary |
|---|---|---|
market_research |
RFI, sources sought or industry engagement | not a solicitation or selection |
operating_surface |
deployed environment or active service | operating state does not disclose every task, workload or physical site |
rd_program |
research, piloting or prototyping program | R&D award is not high-volume production |
parallel_project_portfolio |
multiple independently selected projects | parallel awardees are not one winner or one architecture |
open_project_call |
closed or open call with no public selection | possible participants are discovery candidates, not applicants |
production_program |
production contract or incumbent successor build | production award is not delivery or acceptance |
prototype_program |
funded prototype, OTA or demonstration | prototype selection is not production transition |
modernization_portfolio |
related subprograms with distinct instruments | do not merge design, prototype and production clocks |
Every program dossier must carry:
program_id, exact public name and program-object type;## Performer and contender states
The following states are mutually distinct:
operating_performer — named in an operating federal environment;production_awardee — holds a production contract or order;prototype_awardee — holds a funded prototype instrument;rd_awardee — holds a named research, pilot or qualification project;design_pool — received a design or study order before a later selection;named_system_partner — officially named in a system build, but task or
workshare may remain undisclosed;eligible_incumbent — has relevant vehicle or same-office access without a
named current task;supported_candidate — has both relevant capability and an evidenced
acquisition bridge, but no public selection;plausible_candidate — technical fit exists without a live acquisition
bridge;discovery_only — surfaced by adjacency, membership, hiring, patents or
company claims only; andnot_publicly_identified — the role, site, signatory or applicant field is
not disclosed.The record must not call every position a competitor. Parallel awardees, incumbents, suppliers, design-pool members and undisclosed applicants are different objects.
A company role and a physical facility are calculated independently. Each facility join uses one of four states:
verified_program_site — the program source names the site;verified_company_capability_site — an official company or government
record establishes relevant capacity, but the program does not name the site;planned_or_building_site — agreement, construction or expansion exists
without commissioned program output; orundisclosed_or_unresolved — the public record does not locate the relevant
workload, manufacturing, integration or test site.Announced, financed, constructed, commissioned, qualified and accepted are separate facility clocks. A company job posting can discover a site but cannot promote it to a program site without a stronger join.
## Acquisition and acceptance gates
The program path is never compressed. Preserve at least these objects when they apply:
budget request
-> appropriation / allocation
-> market research
-> solicitation or project call
-> selection / negotiation
-> executed award or order
-> obligation
-> design review
-> build or integration
-> independent test / ATO / qualification
-> delivery
-> acceptance
-> production option or recurring service
A ceiling is not an obligation. An IDIQ is not a task. Selection for negotiation is not an award. Installation is not acceptance. Launch is not checkout. A prototype is not a production program.
Each dossier must test, where material:
An unknown is a missing gate, not a negative finding.
Back-tests use only evidence public before the selection event. Each case must state:
Calibration quality is:
strong when the public predecision field and outcome are both known;partial when selected entities and relevant signals are known but the full
applicant or evaluated field is not; ornot_calibratable when the public record lacks the predecision comparison
set or decision object.The model succeeds if it identifies a bounded serious field and preserves uncertainty. It is not required to guess a winner from information the agency did not publish.
Every edge uses a verb: solicits, selects, awards, tasks, operates,
builds_at, tests_at, qualifies, positioned_for, depends_on or
blocked_by. Never use generic connected to or partner.
Phase 5 remains a research and calibration object. It does not join the Federal Group, activate monitoring, make an award prediction, establish an undisclosed supplier relationship or constitute investment advice. Canonical Wave 1–4 company edges remain authoritative for company relationships; Phase 5 adds the program-centered acquisition, facility and calibration views.