# NSSTS Phase 5 Program-Dossier Constitution **Evidence cutoff:** 2026-08-18 **Status:** active workbench research method **Boundary:** standalone from the Federal Group; no vault or Observatory promotion authorized ## Controlling shift Waves 1–4 ask which companies are positioned to support the technology buildout. Phase 5 reverses the lens. The controlling object is a federal program, portfolio, facility, solicitation, project call or operating acquisition surface. Companies join only through evidence-bearing positions inside that object. ```text mission demand -> exact federal owner and program office -> budget / authority / acquisition instrument -> public requirement and contender field -> award, task or negotiation state -> facility and capacity dependencies -> test, authorization and qualification -> accepted operation or production ``` This phase does not rank companies. It asks which public evidence can and cannot distinguish an eventual performer, transition or acceptance outcome. ## Program object types | Type | Meaning | Required boundary | |---|---|---| | `market_research` | RFI, sources sought or industry engagement | not a solicitation or selection | | `operating_surface` | deployed environment or active service | operating state does not disclose every task, workload or physical site | | `rd_program` | research, piloting or prototyping program | R&D award is not high-volume production | | `parallel_project_portfolio` | multiple independently selected projects | parallel awardees are not one winner or one architecture | | `open_project_call` | closed or open call with no public selection | possible participants are discovery candidates, not applicants | | `production_program` | production contract or incumbent successor build | production award is not delivery or acceptance | | `prototype_program` | funded prototype, OTA or demonstration | prototype selection is not production transition | | `modernization_portfolio` | related subprograms with distinct instruments | do not merge design, prototype and production clocks | ## Program record Every program dossier must carry: - stable `program_id`, exact public name and program-object type; - mission, sector, federal owner and program office; - named authority, solicitation, vehicle, award or operating instrument; - current state and the exact acceptance terminus; - canonical company-edge joins; - typed performer and contender positions; - facility and site joins with independent evidence state; - budget, acquisition, eligibility, authorization and test gates; - adverse evidence and unresolved competition information; - shared-rail and monitoring joins; - dated promotion and downgrade tests; and - a calibration posture describing what public evidence could have predicted. ## Performer and contender states The following states are mutually distinct: 1. `operating_performer` — named in an operating federal environment; 2. `production_awardee` — holds a production contract or order; 3. `prototype_awardee` — holds a funded prototype instrument; 4. `rd_awardee` — holds a named research, pilot or qualification project; 5. `design_pool` — received a design or study order before a later selection; 6. `named_system_partner` — officially named in a system build, but task or workshare may remain undisclosed; 7. `eligible_incumbent` — has relevant vehicle or same-office access without a named current task; 8. `supported_candidate` — has both relevant capability and an evidenced acquisition bridge, but no public selection; 9. `plausible_candidate` — technical fit exists without a live acquisition bridge; 10. `discovery_only` — surfaced by adjacency, membership, hiring, patents or company claims only; and 11. `not_publicly_identified` — the role, site, signatory or applicant field is not disclosed. The record must not call every position a competitor. Parallel awardees, incumbents, suppliers, design-pool members and undisclosed applicants are different objects. ## Facility joins A company role and a physical facility are calculated independently. Each facility join uses one of four states: - `verified_program_site` — the program source names the site; - `verified_company_capability_site` — an official company or government record establishes relevant capacity, but the program does not name the site; - `planned_or_building_site` — agreement, construction or expansion exists without commissioned program output; or - `undisclosed_or_unresolved` — the public record does not locate the relevant workload, manufacturing, integration or test site. Announced, financed, constructed, commissioned, qualified and accepted are separate facility clocks. A company job posting can discover a site but cannot promote it to a program site without a stronger join. ## Acquisition and acceptance gates The program path is never compressed. Preserve at least these objects when they apply: ```text budget request -> appropriation / allocation -> market research -> solicitation or project call -> selection / negotiation -> executed award or order -> obligation -> design review -> build or integration -> independent test / ATO / qualification -> delivery -> acceptance -> production option or recurring service ``` A ceiling is not an obligation. An IDIQ is not a task. Selection for negotiation is not an award. Installation is not acceptance. Launch is not checkout. A prototype is not a production program. ## Eligibility membrane Each dossier must test, where material: - exact CAGE, UEI and legal signatory; - vehicle and program-office access; - facility clearance and classified-data authorization; - ATO, cross-domain, identity and sovereign-hosting requirements; - FOCI, FEOC, 1260H, export-control and foreign-parent exposure; - Buy American, specialty-metal, domestic-source and origin requirements; - cybersecurity, quality, safety and mission-assurance certification; - novation, acquisition, subsidiary and beneficial-ownership changes; and - data-rights, open-interface and government-purpose-rights requirements. An unknown is a missing gate, not a negative finding. ## Calibration Back-tests use only evidence public before the selection event. Each case must state: - the public candidate or design pool, when known; - the later selected entities; - the signals available before selection; - the signals that were nonpublic or not differentiating; - whether the model would have found the selected field; and - whether the result exposes fame, incumbent, survivorship or false-precision bias. Calibration quality is: - `strong` when the public predecision field and outcome are both known; - `partial` when selected entities and relevant signals are known but the full applicant or evaluated field is not; or - `not_calibratable` when the public record lacks the predecision comparison set or decision object. The model succeeds if it identifies a bounded serious field and preserves uncertainty. It is not required to guess a winner from information the agency did not publish. ## Visual grammar - program or acquisition object: federal/instrument node; - company: private exact-entity node outside the Federal Group; - facility: separate site node; - test or acceptance event: gate node; - solid edge: named official relationship; - long dash: supported candidate or company-capability-site join; - dotted edge: plausible or discovery-only position; - red stop edge: cancellation, failed test, exclusion or explicit contradiction. Every edge uses a verb: `solicits`, `selects`, `awards`, `tasks`, `operates`, `builds_at`, `tests_at`, `qualifies`, `positioned_for`, `depends_on` or `blocked_by`. Never use generic `connected to` or `partner`. ## Promotion boundary Phase 5 remains a research and calibration object. It does not join the Federal Group, activate monitoring, make an award prediction, establish an undisclosed supplier relationship or constitute investment advice. Canonical Wave 1–4 company edges remain authoritative for company relationships; Phase 5 adds the program-centered acquisition, facility and calibration views.