workbench: Research Packages/Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md

Canonical source SHA-256: a9fc7aa60eeb958f24cf1ab1cfdefec9b5c4a7b662c96e1e8eb72c2c64126259

Served copy SHA-256: a9fc7aa60eeb958f24cf1ab1cfdefec9b5c4a7b662c96e1e8eb72c2c64126259

Owner evidence cutoffs: {"nssts-technology-company-map": "2026-08-19", "nssts-quantum-cryptographic-acceptance": "2026-08-19"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: nssts-technology-company-map, nssts-quantum-cryptographic-acceptance

NSSTS Quantum and Cryptographic Acceptance Claim Audit

Section 1 of 1

# NSSTS Quantum and Cryptographic Acceptance Claim Audit

As of: August 19, 2026
Automatic monitoring: false
Promotion: not authorized
Scope: 40 registry cases; four balanced waves

## Claim rulings

Proposed compression Ruling Why Promotion object
QBI Stage B company is government validated Reject Stage B is plan, risk and prototype work before Stage C Stage C selection and government V&V finding
QBI Stage C means a utility-scale machine exists Reject Stage C tests buildability/operability; it is not the full build and acceptance instrument Machine contract, delivered system and government acceptance
Quantum CHIPS LOI is a final award Reject Proposed assistance and equity remain subject to final negotiation Executed agreement, obligation and milestone record
QED-C member or completed project is production qualified Reject Membership and matched R&D are not customer lot/system qualification Part/process qualification and accepted target integration
QCAL can approve procurement Reject Rydberg produces traceable calibration evidence; the acquirer owns acceptance Acquirer-recognized method plus disposition on target device
A CAVP certificate makes the product FIPS validated Reject CAVP covers algorithm conformance, not the module or product Active CMVP certificate and exact product mapping
A module in process is validated Reject IUT/MIP are workflow states Issued active certificate and security policy
Any PQC capability in a module is an approved FIPS service Reject Security policy may mark it non-compliant/non-approved Approved-service listing in exact certificate policy
Federal PKI incumbency means PQC readiness Reject Operating legacy profiles may still require module, profile and relying-party migration Validated module, updated profile, interoperability and ATO
AWS PQC availability proves Genesis uses PQC Reject Client, endpoint, key and configuration choices are not public Target configuration and ATO/SSP evidence
FIPS 206 is a current compliance target Reject FIPS 206 remains in development Final published FIPS and later validation/profile evidence
NCCoE consortium participant is NIST endorsed Reject CRADA participation is collaborative R&D, not validation or endorsement Separate product validation and target acceptance
Test laboratory validated the product Reject Lab creates evidence; NIST CMVP issues module validation CMVP certificate and product mapping
CMVP validation is a DOE ATO Reject Module validation does not accept system residual risk DOE/NNSA AO authorization for exact boundary
Globus identity role proves token PQC Reject Operating broker role does not disclose target signing/transport algorithms Target issuer, algorithms, endpoints, CBOM and ATO

## Exact-entity and control rulings

  1. QUNNECT, INC. and Qunnect LLC remain separate award identities until an entity conversion, assignment or novation record resolves the clock.
  2. VESCENT TECHNOLOGIES INC. and Vescent Photonics, LLC cannot be silently collapsed because the award recipient and abstract performer names differ.
  3. Amphenol RF and XMA are not independent competitors after Amphenol's acquisition of XMA; the current contracting entity remains a W-9/instrument question.
  4. Qubitekk assets and contracts are separate objects. IonQ's asset purchase does not prove every historic agreement, warranty or support obligation moved.
  5. Vector Atomic is now controlled by IonQ. Historic capability should not be attributed to a new IonQ award without the exact instrument clock.
  6. Acumen Security should be read through Intertek ownership while preserving the lab name actually printed on a CMVP certificate.
  7. SB Technology Federal Inc. is the award entity in the Air Force record; SandboxAQ is the operating/company identity joined by the official abstract.

## Decision-right matrix

Evidence object Creator/operator Decider
Quantum component performance data Supplier and test facility System prime/customer
SI-traceable Rydberg calibration Rydberg QCAL / University of Michigan DARPA or acquiring program
QBI constructability and operability record Performer plus independent V&V team DARPA
Quantum manufacturing milestone Award recipient / QMEC / foundry Commerce, NIST or buying program
Algorithm conformance Vendor plus accredited test path NIST CAVP record within scope
Cryptographic-module test package NVLAP-accredited CST laboratory NIST CMVP
Product-to-certificate mapping OEM/integrator and assessor Buying agency / AO
Federal PKI trust profile SSP, FPKI/GSA and relying parties Subscriber agency for target use
Genesis identity token Institutional IdP / Globus / upstream broker Resource owner and DOE boundary
Genesis system residual risk Assessment evidence from multiple actors DOE/NNSA authorizing official

## Live clocks and manual return board

Date / state Watch Return object Unsafe early claim
2026-08-28 AOSense QuAIS II end Released field result, platform qualification or follow-on “Quantum IMU accepted”
2026-09-21/22 FIPS 140-2 transition New-system acquisition disposition and 140-3 replacement “140-2 remains sufficient for new systems”
2026-09-30 Several lab accreditation clocks Updated NVLAP certificate/scope “All listed labs remain current indefinitely”
2026-10-15 QBI IV&V close Exact award, OCI plan and task scope “Candidate is the QBI referee”
2026-10-22 M-26-15 agency plan due DOE non-NSS plan, system priorities and inventory method “Genesis is covered by the non-NSS plan”
Approximately 2027-03 Federal CBOM minimum-elements work Issued minimum elements and agency implementation “Current proprietary inventory is federally CBOM-compliant”
2027 onward Quantum CHIPS/QMEC Final agreements, work packages and qualified capacity “Proposed foundry capacity is operating”
2028-06-23 Rydberg QCAL Phase II end Operating lab, accepted methods, access and transition “Phase II itself created universal calibration authority”
No date yet FIPS 206 Final standard “FIPS 206 compliant”
No public object Genesis PQC join SSP/ATO, certificate profile, CBOM, target KMS/HSM configuration “Genesis uses PQC”

## Disconfirming artifacts that must stay visible

## Manual promotion order

  1. Resolve QBI IV&V, because the independent-referee award can reveal test subcontractors and conflicts before any machine award.
  2. Follow QMEC and Quantum CHIPS final agreements for hidden cryogenic, laser, packaging, foundry and metrology work packages.
  3. Recheck Crypto4A, SafeLogic, Securosys, Bouncy Castle and Geomys for issued FIPS 140-3 certificates and read each security policy rather than the headline.
  4. Follow Entrust and WidePoint for FPKI profile, HSM and relying-party interoperability changes.
  5. Recheck the NVLAP laboratory roster and scope before attributing scarce validation capacity.
  6. Watch DOE after October 22 for the non-NSS migration plan, while preserving the separate classified/NSS path.
  7. Promote no Genesis PQC vendor until a named target configuration and DOE/NNSA authorization object exists.

## Package boundary