# NSSTS Quantum and Cryptographic Acceptance Claim Audit **As of:** August 19, 2026 **Automatic monitoring:** false **Promotion:** not authorized **Scope:** 40 registry cases; four balanced waves ## Claim rulings | Proposed compression | Ruling | Why | Promotion object | |---|---|---|---| | QBI Stage B company is government validated | **Reject** | Stage B is plan, risk and prototype work before Stage C | Stage C selection and government V&V finding | | QBI Stage C means a utility-scale machine exists | **Reject** | Stage C tests buildability/operability; it is not the full build and acceptance instrument | Machine contract, delivered system and government acceptance | | Quantum CHIPS LOI is a final award | **Reject** | Proposed assistance and equity remain subject to final negotiation | Executed agreement, obligation and milestone record | | QED-C member or completed project is production qualified | **Reject** | Membership and matched R&D are not customer lot/system qualification | Part/process qualification and accepted target integration | | QCAL can approve procurement | **Reject** | Rydberg produces traceable calibration evidence; the acquirer owns acceptance | Acquirer-recognized method plus disposition on target device | | A CAVP certificate makes the product FIPS validated | **Reject** | CAVP covers algorithm conformance, not the module or product | Active CMVP certificate and exact product mapping | | A module in process is validated | **Reject** | IUT/MIP are workflow states | Issued active certificate and security policy | | Any PQC capability in a module is an approved FIPS service | **Reject** | Security policy may mark it non-compliant/non-approved | Approved-service listing in exact certificate policy | | Federal PKI incumbency means PQC readiness | **Reject** | Operating legacy profiles may still require module, profile and relying-party migration | Validated module, updated profile, interoperability and ATO | | AWS PQC availability proves Genesis uses PQC | **Reject** | Client, endpoint, key and configuration choices are not public | Target configuration and ATO/SSP evidence | | FIPS 206 is a current compliance target | **Reject** | FIPS 206 remains in development | Final published FIPS and later validation/profile evidence | | NCCoE consortium participant is NIST endorsed | **Reject** | CRADA participation is collaborative R&D, not validation or endorsement | Separate product validation and target acceptance | | Test laboratory validated the product | **Reject** | Lab creates evidence; NIST CMVP issues module validation | CMVP certificate and product mapping | | CMVP validation is a DOE ATO | **Reject** | Module validation does not accept system residual risk | DOE/NNSA AO authorization for exact boundary | | Globus identity role proves token PQC | **Reject** | Operating broker role does not disclose target signing/transport algorithms | Target issuer, algorithms, endpoints, CBOM and ATO | ## Exact-entity and control rulings 1. **QUNNECT, INC. and Qunnect LLC** remain separate award identities until an entity conversion, assignment or novation record resolves the clock. 2. **VESCENT TECHNOLOGIES INC. and Vescent Photonics, LLC** cannot be silently collapsed because the award recipient and abstract performer names differ. 3. **Amphenol RF and XMA** are not independent competitors after Amphenol's acquisition of XMA; the current contracting entity remains a W-9/instrument question. 4. **Qubitekk assets and contracts** are separate objects. IonQ's asset purchase does not prove every historic agreement, warranty or support obligation moved. 5. **Vector Atomic** is now controlled by IonQ. Historic capability should not be attributed to a new IonQ award without the exact instrument clock. 6. **Acumen Security** should be read through Intertek ownership while preserving the lab name actually printed on a CMVP certificate. 7. **SB Technology Federal Inc.** is the award entity in the Air Force record; SandboxAQ is the operating/company identity joined by the official abstract. ## Decision-right matrix | Evidence object | Creator/operator | Decider | |---|---|---| | Quantum component performance data | Supplier and test facility | System prime/customer | | SI-traceable Rydberg calibration | Rydberg QCAL / University of Michigan | DARPA or acquiring program | | QBI constructability and operability record | Performer plus independent V&V team | DARPA | | Quantum manufacturing milestone | Award recipient / QMEC / foundry | Commerce, NIST or buying program | | Algorithm conformance | Vendor plus accredited test path | NIST CAVP record within scope | | Cryptographic-module test package | NVLAP-accredited CST laboratory | NIST CMVP | | Product-to-certificate mapping | OEM/integrator and assessor | Buying agency / AO | | Federal PKI trust profile | SSP, FPKI/GSA and relying parties | Subscriber agency for target use | | Genesis identity token | Institutional IdP / Globus / upstream broker | Resource owner and DOE boundary | | Genesis system residual risk | Assessment evidence from multiple actors | DOE/NNSA authorizing official | ## Live clocks and manual return board | Date / state | Watch | Return object | Unsafe early claim | |---|---|---|---| | 2026-08-28 | AOSense QuAIS II end | Released field result, platform qualification or follow-on | “Quantum IMU accepted” | | 2026-09-21/22 | FIPS 140-2 transition | New-system acquisition disposition and 140-3 replacement | “140-2 remains sufficient for new systems” | | 2026-09-30 | Several lab accreditation clocks | Updated NVLAP certificate/scope | “All listed labs remain current indefinitely” | | 2026-10-15 | QBI IV&V close | Exact award, OCI plan and task scope | “Candidate is the QBI referee” | | 2026-10-22 | M-26-15 agency plan due | DOE non-NSS plan, system priorities and inventory method | “Genesis is covered by the non-NSS plan” | | Approximately 2027-03 | Federal CBOM minimum-elements work | Issued minimum elements and agency implementation | “Current proprietary inventory is federally CBOM-compliant” | | 2027 onward | Quantum CHIPS/QMEC | Final agreements, work packages and qualified capacity | “Proposed foundry capacity is operating” | | 2028-06-23 | Rydberg QCAL Phase II end | Operating lab, accepted methods, access and transition | “Phase II itself created universal calibration authority” | | No date yet | FIPS 206 | Final standard | “FIPS 206 compliant” | | No public object | Genesis PQC join | SSP/ATO, certificate profile, CBOM, target KMS/HSM configuration | “Genesis uses PQC” | ## Disconfirming artifacts that must stay visible - A CAVP record is algorithm evidence only. - The published LS2 HSM FIPS 140-3 security policy marks ML-KEM and ML-DSA non-compliant in the FIPS state, demonstrating why capability cannot be compressed into approved use. - NIST paused new CST-lab applications because validation capacity is constrained; that is a queue-risk signal, not proof that a particular product is delayed. - DOE's public ModCon BaseTemplate workflow uses mutable action tags, has a commented publish trigger and exposes no public SBOM, release signature, attestation or admission verifier. This does not prove private production controls are absent; it blocks promotion of public GitHub hosting into a signed-artifact trust role. - OMB M-26-15 excludes national-security systems. It cannot be applied to an NNSA classified Genesis workload without a system categorization and the relevant CNSS/NSA control path. ## Manual promotion order 1. Resolve **QBI IV&V**, because the independent-referee award can reveal test subcontractors and conflicts before any machine award. 2. Follow **QMEC** and **Quantum CHIPS final agreements** for hidden cryogenic, laser, packaging, foundry and metrology work packages. 3. Recheck **Crypto4A, SafeLogic, Securosys, Bouncy Castle and Geomys** for issued FIPS 140-3 certificates and read each security policy rather than the headline. 4. Follow **Entrust and WidePoint** for FPKI profile, HSM and relying-party interoperability changes. 5. Recheck the **NVLAP laboratory roster and scope** before attributing scarce validation capacity. 6. Watch DOE after October 22 for the **non-NSS migration plan**, while preserving the separate classified/NSS path. 7. Promote no Genesis PQC vendor until a **named target configuration and DOE/NNSA authorization object** exists. ## Package boundary This audit identifies evidence-producing and decision-controlling companies. It does not establish a Science Strategy target award, product endorsement, automatic watch, investment thesis or vault-canonical conclusion.