DTCC Notice and Testing Clock Map

.md · 3 sections · 32384 characters

complete text
Source and version

vault:02 - Research/DTCC Notice and Testing Clock Map — Source Document.md

Source SHA-256: 6662eacb68c8d8f3f2d3179a344c1c08a0aa9807ba848f4bf4189a20103ea1f7

Evidence cutoffs by research owner: {"artifact:d3b0df1aa0c0377a": ""}

Saved source text, not a new finding. Markdown notation and table delimiters are retained.

Document contentsOpening section · Date-label cautions · FICC liquidity and membership

Opening section

Lines 1–147 · Section 1 of 3

[!abstract] Durable status map This note is the controlling dated map for public DTCC testing, attestation, membership, conversion and production-target clocks through September 18, 2026. It does not replace the constitutional, cash-leg, liquidity or record-sovereignty rulings in the three companion DTCC source documents.

Companions: DTCC Atomic Settlement Liquidity Stress Test — Source Document · DTCC Collateral AppChain and Record Sovereignty — Source Document · DTCC Operative Constitution and Public-Bank Model — Source Document · Clearing-House Transition — Factual Timeline

# DTCC Notice and Testing Clock Map

Evidence cutoff: 2026-09-18 ET
Research mode: public, read-only, primary-source-first
Lifecycle: incorporated live-vault source document
Authority: this source document controls the dated notice/testing map through the cutoff; the three companion DTCC source documents retain their narrower constitutional, liquidity and record-sovereignty authority

## Controlling ruling

DTCC has several real change programs in motion, but they are not one test and they have not reached one common state.

The controlling project constitution therefore remains unchanged:

A movable token is not automatically a DTC entitlement; a DTC entitlement is not automatically eligible collateral; collateral movement is not FICC delivery; FICC delivery is not margin satisfaction; none of those states is federal-funds finality, legal discharge or accounting close.

## Evidence grammar

State What it establishes What it does not establish
Announcement DTCC stated an intended change or date. Test execution, deployment or use.
Scheduled test DTCC assigned a future environment or window. The test opened, passed or covered economic behavior.
Test open The environment and test objects were actually available. Completion, participant coverage or acceptance.
Test result DTCC or a participant reported what ran and what passed or failed. Production deployment unless separately shown.
Attestation A named party certified a defined condition. Independent validation or live funding.
Authorization / eligibility Rules or membership permit an action from a date. First use, volume, novation, settlement or finality.
Production target DTCC identified a deployment or conversion time. Occurred go-live or successful first business processing.
Occurred operation A dated authoritative record shows the service actually ran. Scale, broad adoption or economic effect without more evidence.

## September 18 whole-site refresh

The September review covered the whole public DTCC site rather than the press room alone: product and service pages, the Important Notices feed, DTC/NSCC/FICC rule filings, current Rules and service guides, transformation roadmaps and resources, member directories, events and replays, Insights, and policy, disclosure and financial pages. Sitemap modification dates were treated as technical metadata, not publication dates. The live notices feed briefly exposed TEST and DUMMY IMPORTANT NOTICE objects; those were excluded as feed-quality artifacts.

### What changed outside the newsroom

Public object State at September 18 What it changes What it does not yet prove
DTC Tokenization Service product page Current product architecture; AppChain, Canton and Stellar grouped as eligible networks Same-CUSIP rights; mint, burn, pause and clawback controls; LedgerScan ownership tracking; multi-network design That all listed networks launch in October. DTCC separately targets Stellar for the first half of 2027.
Fund/SERV admission of Oasis Pro Markets Membership announced September 16 Bridges a tokenization platform into incumbent fund transaction, reconciliation, distribution, tax and regulatory-reporting rails First tokenized-fund transaction, DTC tokenization launch or volume.
SR-DTC-2026-010 / Important Notice 24808-26 Proposed rule filing submitted September 15; no located SEC publication or operative service-guide revision Proposes AnnounceDirect as a standardized corporate-action submission system with agent good-order, timing and content duties Effectiveness, deployment, issuer/agent use or successful announcement processing.
CMU220-26 Mandatory conversion schedule PSE testing and attestation October 2; optional dual-format production October 2–29; CSV-only production October 30 Successful testing, participant completion or error-free production.
B24776-26 Mandatory DTC settlement-system migration program Replaces the earlier Q3 2027 target with an exact launch date to be supplied in November 2027; Rule 2 connectivity duty and possible sanctions remain explicit A current production change or completed client migration.
NSCC 24x5 Live since June 28; participating-firm testing reported complete Extends NSCC clearing intake and processing; first exchanges and SIPs target December 2026 24/7 cash finality, DTC token movement, exchange operation or Fedwire availability.
September member notices and directories Entity-specific eligibility changes Texas Stock Exchange fee collection and new/expanded FICC participant and sponsoring-member accounts First trade, comparison, novation, margin, settlement or exchange launch.

### October and adjacent proof gates

Clock Public state Close condition
October 2026 DTC tokenization opening Month-level target only; October 1 is approximate Operative DTC notice or equivalent participant terms, approved launch networks and assets, fees, wallet/control rules, and a dated first post-opening production record.
October 2 CMU PSE test and attestation Scheduled Environment opened and required participant attestations/results received.
October 2–29 CMU dual-format production Scheduled optional transition Observed production delivery and defect disposition.
October 30 CMU CSV-only cutover Fixed conversion target Occurred CSV-only production and retirement of the legacy PDF print image.
October 8 transformation roadmap/connectivity/testing event Event listing Published materials or replay can inform the map; the event itself is not a test result.
October 29 Americas Trading Conference Event listing Any dated DTCC disclosure must be classified by its own legal or operating state.
December 2026 first exchanges and SIPs in 24x5 Target Named exchange/SIP operating evidence.
First half 2027 Stellar availability Target Network-specific terms, launch notice and occurred production.
November 2027 DTC settlement-system launch date Date to be supplied later Exact date, successful client migration and first processing cycle.

### Joined interpretation, kept bounded

The site-wide evidence shows four layers moving together but not on one clock:

  1. legal submission: AnnounceDirect and agent duties;
  2. machine-readable reporting: CMU CSV, ISO 20022 and later modernized client interfaces;
  3. operating day: 24x5 clearing and exchange/SIP expansion; and
  4. asset and record: tokenization, network controls and LedgerScan's joined on-chain/off-chain reconciliation.

The important institutional pattern is not a separate blockchain market replacing DTCC. DTCC is attaching tokenized assets and tokenization members to incumbent membership, account, risk, reconciliation, reporting and settlement controls. That is a strong architecture signal, not proof that every component is effective, live or economically material.

## What newly surfaced or was indexed in the August 13–21 review window

Public object DTCC entity State reached by cutoff Clock State not reached / next proof
A9807 and B24712-26, rollover direct-loss process NSCC and DTC One incident-remediation deadline cross-posted by two legal entities Information concerning believed direct losses materially above the July 13 interest payment due August 31; no late submissions This is discretionary case-by-case review, not a formally accepted claim. No public submission count, loss value, acceptance, reimbursement, root-cause report or resiliency outcome.
GOV2198-26, Citibank foreign branches FICC-GSD Scheduled netting-member activation Effective trade date August 24 Confirm directory/account status and, if disclosed, eligible trade submission.
A9809, Document Processing API revised dates NSCC I&RS Revised future test and production targets; indexed August 17, document dated August 12 PSE March 25, 2027; production April 15; SOAP/XML decommission remains November 17 Confirm PSE opening, client testing, production activation and final decommission.
GOV2200-26 FICC-GSD Annual officer/compliance attestation required Certificate due September 18 that the defined CCLF amount was incorporated into the member's liquidity plan Submission and review are likely nonpublic; this is not a funded-liquidity, broad readiness or default-test result.
MBS1587-26 FICC-MBSD Annual officer/compliance attestation required Certificate due September 18 under the distinct MBSD rule and measure Same proof boundary as GSD, under a distinct MBSD rule, metric and membership.
GOV2199-26, Barclays Omnibus CIL FICC-GSD Scheduled CIL-only sponsoring-member activation Effective August 24 Confirm status and any publicly disclosed Sponsored GC CIL activity.
GOV2201-26, Goldman Sachs Omnibus CIL FICC-GSD Scheduled CIL-only sponsoring-member activation Effective August 24 Distinct firm/account from GOV2199; same next-proof class.
A9815, Fall 2026 enhancement release NSCC I&RS Scheduled testing and production deployment STL test October 29; PAR/RPL test November 12; production November 19 after 6:30 p.m. ET Obtain exact release inventory, environment, cases, results and activation confirmation.
August 20 Clearing Defect Log & Testing Office Hours page DTCC Transformation Dated support-event page only August 20 No public agenda, replay, minutes, defect list, disposition or outcome was located.
SEC Release 34-106127, SR-DTC-2026-009 DTC / SEC Rule change approved August 13 PWP implementation by December 31; exact date to be announced at least 14 business days before implementation Approval is not deployment. Watch for the required DTC Important Notice and occurred operating evidence.

Date-label cautions

Lines 147–275 · Section 2 of 3

### Date-label cautions

## Older notices with clocks active at the cutoff

Notice Entity / service Active clock Exact scope Next proof
A9795 -> A9799 -> A9805 NSCC CNS equities clearing August 24–October 9 Receipt, expected record layout and file structure; continuity of existing MROs and MT 570. No value validation; no cash; selected MROs and print-image/CSV attestations excluded or deferred. Actual PSE opening, participant attestations or summarized results, defect disposition, later excluded-output testing, cutover confirmation.
24662-26 DTC Asset Services, corporate-actions messaging Subscription request due August 21; testing September 7–October 30; findings due October 23; conversion November 15 at 8:00 a.m. ET ISO 20022 Instructions for Distributions and Voluntary Reorganization through U/PSE and SWIFT UAT CUG; not a general securities-settlement ISO conversion. Connectivity, test findings, completion, first SR2026 production messages and incident/acceptance evidence.
24460-26 plus SEC 34-106127 DTC Payment without Presentation redemption processing Implementation by December 31; exact date must be announced at least 14 business days in advance Approved rule and implementation bound, not an exact launch date or operating result. Required Important Notice, deployment evidence and first operating record.

## Continuity from the prior August 8 weekly delta

These notices were already captured by the preceding sweep. Their effective dates fell before this map's cutoff, but the notices alone do not establish occurred use.

Notice Notice-defined clock State boundary at August 21 Official source
A9802 / NSCC ETF create-redeem control Effective August 17 Effective date elapsed. The notice establishes the new $15 billion review-and-written-approval threshold, not an observed flagged instruction or completed approval. A9802
GOV2193-26 / FICC-GSD Deutsche Bank London Branch Effective trade date August 13 Scheduled membership date elapsed; first submitted, compared, novated, margined or settled transaction not located. GOV2193-26
GOV2196-26 / FICC-GSD ASL Capital Markets / ACM Omnibus Effective August 17 Scheduled membership date elapsed; first executing-firm-customer submission or later transaction state not located. GOV2196-26

Prior adjudication: Federal Government Weekly Delta 2026-08-08/waves/WAVE_1_MONEY_SETTLEMENT_PUBLIC_FINANCE.md.

## CNS notice lineage and unresolved production clock

Source What changed What still controls
A9795, PDF dated July 13 / index July 15 Initially placed day-cycle CSV and CNS MRO testing in a July 27–October 9 window; extended print images in production beyond its stated November 16 go-live. Its July 27 start was superseded. Its continuing output-transition and print-image boundary remains relevant.
A9799, July 23 Moved modernized CNS testing from July 27 to August 24; used November 14 as the go-live date. Testing-start change remains active; A9805 supplies the later scope and end date.
A9805, August 6 Fixed the controlling August 24–October 9 output-test scope and explicit exclusions. Controlling test-scope notice at the cutoff.
August 2026 Equities Clearing Transformation Client Roadmap Uses November 16 for the application being live for client use; places interface migration in Q2 2027 with the production migration deadline in Q3 2028. November is application modernization with legacy interfaces retained, not completion of CNS interface modernization.

The public dates remain conflicted. A9799 says November 14; A9795 and the August roadmap say November 16, with the roadmap defining the latter as available for client use. A weekend cutover followed by Monday client use is a reasonable inference, but DTCC has not publicly made that distinction in the reviewed objects.

Safe clock: November 14–16, 2026 production/cutover window; public semantics unresolved.

Close condition: a later DTCC Important Notice or roadmap that separately names technical cutover, first processing cycle and first client-use date.

## Active clock map at August 21

Date / window, ET unless stated Clock Subsidiary / program Public state at cutoff
August 21 ISO testing-subscription request deadline DTC Asset Services Deadline date at cutoff; public subscription outcome not located.
August 24 CNS output testing opens NSCC CNS Scheduled, not yet observed open.
August 24 Citibank GSD Netting Buy/Sell activation FICC-GSD Scheduled eligibility.
August 24 Barclays and Goldman CIL sponsoring-member activations FICC-GSD Two distinct scheduled CIL-only eligibility changes.
August 24–October 9 CNS output test NSCC CNS Narrow future test window.
August 31 Rollover direct-loss information deadline DTC and NSCC Remediation deadline.
September 7–October 30 ISO 20022 client test DTC Asset Services Future mandatory client test window.
September 18 CCLF officers' certificates due FICC GSD and MBSD Two division-specific officer/compliance attestations.
October 9 CNS output-test close NSCC CNS Future close; no outcome inference.
October 23 ISO findings due DTC Asset Services Findings precede the October 30 test close.
October 29 STL test NSCC I&RS Scheduled test, criteria not public in the notice.
November 12 PAR/RPL test NSCC I&RS Scheduled test, criteria not public in the notice.
November 14–16 CNS production/cutover window NSCC CNS Conflicted public dates; application modernization retains legacy interfaces.
November 15, 8:00 a.m. SR2026 conversion DTC Asset Services Fixed production target.
November 19, after 6:30 p.m. STL/PAR/RPL enhancement deployment NSCC I&RS Production target; first business processing not established.
By December 31 PWP implementation bound DTC redemption processing Approved; exact implementation date not yet stated in the reviewed evidence.
March 25, 2027 Document Processing REST/JSON API in PSE NSCC I&RS Revised target.
April 15, 2027 Document Processing REST/JSON API production NSCC I&RS Revised target.
November 17, 2027 Legacy SOAP/XML decommission NSCC I&RS Existing target retained.

DTCC's September 9 and October 7 testing-series events belong in an events lane, not as proof that a system test opened, ran or passed.

## Notice-level evidence ledger

Notice / entity Date State class Explicit exclusions or boundary Official source
A9795 / NSCC PDF July 13; index July 15 Partially superseded schedule; continuing output-transition ruling July 27 start superseded; print-image PSE and attestation deferred A9795
A9799 / NSCC July 23 Active schedule change, supplemented by A9805 Does not state end date or test criteria A9799
A9805 / NSCC August 6 Controlling CNS output-test scope No value validation or cash; Buy-In, Miscellaneous Night and Miscellaneous Day MROs excluded; print-image/CSV attestations deferred A9805
A9807 / NSCC and B24712-26 / DTC August 13 One incident-remediation deadline, two legal entities No promised reimbursement, public incident report or outcome publication A9807 · B24712-26
GOV2198-26 / FICC-GSD August 14 Scheduled netting-member activation No activity, volume, repo scope or broad readiness proof GOV2198-26
A9809 / NSCC I&RS PDF August 12; index August 17 Revised API PSE/production targets No duration, cases, pass criteria or readiness result A9809
GOV2200-26 / FICC-GSD August 18 Annual officer/compliance attestation Certifies plan incorporation of the defined amount; not broad readiness, funded liquidity or a default drill GOV2200-26
MBS1587-26 / FICC-MBSD August 18 Annual officer/compliance attestation Distinct rule and measure from GSD; not broad readiness or a live stress test MBS1587-26
GOV2199-26 / FICC-GSD August 19 Scheduled CIL sponsoring-member activation CIL-only capacity, not general all-service activation GOV2199-26
GOV2201-26 / FICC-GSD August 19 Scheduled CIL sponsoring-member activation Distinct Goldman account; same service boundary as GOV2199 GOV2201-26
A9815 / NSCC I&RS August 20 Scheduled test and deployment No exact enhancement inventory, environment, cases, pass criteria or attestation A9815
24662-26 / DTC July 22 Mandatory client test and fixed conversion Corporate-actions message set, not settlement ISO generally 24662-26
24460-26 / DTC June 15 Rule filing and implementation bound No exact launch date or operating evidence 24460-26
SEC 34-106127 / DTC August 13 Rule approval Authorization is not deployment SEC order

## Testing proof gates

### CNS application

  1. Test opened: dated PSE availability or participant receipt on or after August 24.
  2. Phase completed: DTCC or participant attestation, results or formal disposition after October 9.
  3. Defects closed: public defect ledger, minutes, replay or follow-up notice tying specific defects to dispositions.
  4. Economic readiness: a later test explicitly covering cash and economic values.
  5. Excluded outputs ready: print-image/CSV availability and the currently excluded MRO tests and attestations.
  6. Application live: occurred cutover plus first successful processing cycle, with November 14 and 16 semantics resolved.
  7. Interfaces modernized: separate Q2 2027 PSE availability, member migration and the Q3 2028 production migration deadline. Legacy-interface decommission requires separate proof; the roadmap does not establish it.

### DTC ISO 20022 Asset Services

  1. subscriptions and connections accepted;
  2. client test messages exchanged;
  3. findings dispositioned by or after October 23;
  4. October 30 completion evidence;
  5. first SR2026 production messages after November 15 at 8:00 a.m.; and
  6. any production incident, acceptance or rollback evidence.

FICC liquidity and membership

Lines 275–399 · Section 3 of 3

### FICC liquidity and membership

### I&RS

## Bounded negatives and access gaps

No dated public item was located on the reviewed DTCC press-room, Transformation resources, events, Important Notices, digital-assets product pages, or SEC DTC/NSCC/FICC rulemaking surfaces through August 21 that:

This finding can be falsified by a date-stamped official DTCC or SEC item within the window, including a backfilled notice, revised roadmap, archived event material or member-facing artifact later made public. Referenced DTCC Learning specifications, scripts, onboarding materials, participant attestations and client-specific results may require authentication; their absence from this map is an access boundary, not proof that they do not exist.

The live Important Notices index topped out at August 20 during retrieval. The index was traversed through the point where August 13 notices appeared. No August 21 notice was visible; this is a retrieval result, not a claim that DTCC could not later backfill or re-index an item.

For 24x5, the latest located operating baseline remains NSCC's June 28 evening launch / June 29 announcement. DTCC reported all participating firms completed the earlier testing, but no new August 13–21 performance, incident or operating result was located. This 24x5 operating clock is separate from AppChain's 24/7 collateral-mobility capability language.

## Relationship to the tokenization watch

The last located public DTC tokenization production milestone remains DTCC's July 15 controlled-production report. The September 18 product architecture is more specific about same-CUSIP rights, DTC controls and LedgerScan, and the Oasis Pro Markets admission shows a tokenization platform entering Fund/SERV's incumbent fund-processing rails. Neither object establishes the broader DTC service opening.

The watch must therefore keep three objects separate:

None of these objects alone identifies an atomic cash leg, proves a DTC-operated cash-and-securities rail, or closes participant, fee, wallet, first-use, volume, finality or accounting questions. The three August 2 DTCC packages remain controlling for those narrower questions.

## Vault landing and authority lineage

Katie authorized durable promotion on August 21 and the September 18 refresh. This source document is routed from MONEY — READ FIRST; the canonical watch calendar carries the independent proof gates; and the factual Clearing-House timeline carries the corrected CNS test and unresolved November 14–16 production/cutover window.

The detailed Workbench package remains provenance. On September 18, Katie authorized the controlling interpretive update to The Clearing-House Transition: DTCC's joined submission, reporting, operating-hours, asset-record and settlement changes are now read as a regulated modular conversion of the market middle. That interpretation preserves the factual boundary that a test, attestation, membership eligibility date or deployment target does not itself establish effective law, launch or occurred use.

## Source surface ledger

## Bottom line at the cutoff

The whole-site sweep shows DTCC refactoring legal submission, reporting data, operating hours and tokenized recordkeeping at the same time, while preserving incumbent membership, account, risk and settlement controls. The October DTC tokenization opening remains a month-level target and requires launch-specific proof. The nearer exact operating clock newly surfaced outside the press room is CMU's October 30 CSV-only conversion; AnnounceDirect remains proposed, and the mandatory settlement-system migration runs to a later November 2027 launch date still to be supplied. Fund/SERV's Oasis admission and the current eligible- network list are meaningful integration evidence, but neither closes the DTC launch, cash-leg, first-use, volume, finality or accounting questions.