workbench: Research Packages/FORTRESS America and Military Installation Energy Independence 2026-09-30/SOURCE_LEDGER.md
Canonical source SHA-256: af3ed880f1123c2403435309c83b9ecb805e7ccfcd7b0a2917153b3dccb3edf2
Served copy SHA-256: af3ed880f1123c2403435309c83b9ecb805e7ccfcd7b0a2917153b3dccb3edf2
Owner evidence cutoffs: {"fortress-america-installation-energy-independence": "2026-09-30T23:59:59-04:00"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: fortress-america-installation-energy-independence
Section 1 of 1
Status: current
Cutoff: 2026-09-30 ET
## Controlling and framework sources
| Source | Tier/access | Supports | Does not prove |
|---|---|---|---|
| Department September 30 release | official primary; linked but direct retrieval failed, accessible through indexed official text/mirror | program, acronym, five pillars, major-installation objective, Next Great American Base distinction | technical implementation or delivery |
| Signed FORTRESS memorandum | official_link_access_hold; PDF viewer, HTTP and asset retrieval produced no usable document |
memo identity; indexed text exposes office/governance direction | visually verified wording, signature/layout or complete custody |
| 10 U.S.C. §101 | enacted code | resilience/security definitions | project implementation |
| 10 U.S.C. §2920 | enacted code | FY2030 availability, critical-load planning, microgrid/on-site preference, information fields | current compliance |
| 10 U.S.C. §2864 | enacted code | major-installation master plans and BSR cross-reference | FORTRESS adoption of the definition |
| Current Base Structure Report library | official current surface | large-site threshold; multiple-site warning; current report access controls | public covered-site list |
| Installation Energy Resilience | official program surface | estate scale, grid dependence and five-part strategy | site readiness |
| On-Site Distributed Energy Resources | official program surface | technology-neutral posture and finance/authority vehicles | agreement close or operation |
| Black Start Exercises | official method surface | operating-test definition | result at an unlisted site |
| AEPRR reports | official annual-report route; latest listed public report FY2023 | project and performance reporting route | current 2026 portfolio completeness |
| 2025 Military Installation Resilience report | official report | MILCON planning, ERCIP, UFC and control-system context | FORTRESS implementation |
| Source | Supports | Boundary |
|---|---|---|
| Army SCI June solicitation | seven-site private-generation model and 14-day requirement | solicitation |
| Army SCI September selections | six conditional developer/site pairings | not executed leases or plants |
| Army Janus selections | five vendor/site pairings and milestone framework | not reactors in operation |
| NWS Crane MMR announcement | planned commercial MMR at NWS Crane by September 2028; joint Navy/Army Janus path and critical-operations purpose | announcement is not agreement, authorization, construction, criticality or accepted service |
| EO 14299 | executive-agent and first-reactor direction | not authorization/build/operation |
| Eielson microreactor | up-to-5-MW critical-infrastructure proposal and NOITA state | negotiation/licensing path |
| Project Pele | prototype construction/test path | not base power service |
| MCAS Yuma | 100% current/projected requirement backup description | 2016–17 design/activation-era statement |
| MCAS Miramar | completion, mixed sources, up-to-21-day description and mission-critical islanding exercise | design and observed test scopes differ |
| SUBASE New London | generation, first-right power and island controls | essential-function scope |
| Fort McCoy Main Gate | operational gate-area microgrid and stated 14-day capability | not full installation |
| DLA Sigonella | activated tenant microgrid and stated 14-day fuel-load capability | DLA facilities, not full NAS |