# Source Ledger **Status:** `current` **Cutoff:** 2026-09-30 ET ## Controlling and framework sources | Source | Tier/access | Supports | Does not prove | |---|---|---|---| | [Department September 30 release](https://www.war.gov/News/Releases/Release/Article/4615424/secretary-hegseth-announces-six-major-initiatives-at-quantico-speech/) | official primary; linked but direct retrieval failed, accessible through indexed official text/mirror | program, acronym, five pillars, major-installation objective, Next Great American Base distinction | technical implementation or delivery | | [Signed FORTRESS memorandum](https://media.defense.gov/2026/Sep/30/2004009303/-1/-1/1/ESTABLISHMENT-OF-FORTRESS-AMERICA-AS-A-DEPARTMENT-OF-WAR-PROGRAM-FOR-THE-DEFENSE-OF-THE-AMERICAN-HOMELAND.PDF) | `official_link_access_hold`; PDF viewer, HTTP and asset retrieval produced no usable document | memo identity; indexed text exposes office/governance direction | visually verified wording, signature/layout or complete custody | | [10 U.S.C. §101](https://uscode.house.gov/view.xhtml?edition=prelim&f=treesort&num=0&req=%28title%3A10+section%3A101+edition%3Aprelim%29+OR+%28granuleid%3AUSC-prelim-title10-section101%29) | enacted code | resilience/security definitions | project implementation | | [10 U.S.C. §2920](https://uscode.house.gov/view.xhtml?edition=prelim&f=treesort&jumpTo=true&num=0&req=%28title%3A10+section%3A2920+edition%3Aprelim%29+OR+%28granuleid%3AUSC-prelim-title10-section2920%29) | enacted code | FY2030 availability, critical-load planning, microgrid/on-site preference, information fields | current compliance | | [10 U.S.C. §2864](https://uscode.house.gov/view.xhtml?req=%28title%3A10+section%3A2864+edition%3Aprelim%29) | enacted code | major-installation master plans and BSR cross-reference | FORTRESS adoption of the definition | | [Current Base Structure Report library](https://www.acq.osd.mil/eie/imr/rpid/library.html) | official current surface | large-site threshold; multiple-site warning; current report access controls | public covered-site list | | [Installation Energy Resilience](https://www.acq.osd.mil/eie/ero/ier/index.html) | official program surface | estate scale, grid dependence and five-part strategy | site readiness | | [On-Site Distributed Energy Resources](https://www.acq.osd.mil/eie/ero/ier/on-site.html) | official program surface | technology-neutral posture and finance/authority vehicles | agreement close or operation | | [Black Start Exercises](https://www.acq.osd.mil/eie/ero/ier/exercises.html) | official method surface | operating-test definition | result at an unlisted site | | [AEPRR reports](https://www.acq.osd.mil/eie/ero/ier/aeprr.html) | official annual-report route; latest listed public report FY2023 | project and performance reporting route | current 2026 portfolio completeness | | [2025 Military Installation Resilience report](https://www.acq.osd.mil/eie/imr/mc/Downloads/2025-Report-to-Congress-on-Military-Installation-Resilience.pdf) | official report | MILCON planning, ERCIP, UFC and control-system context | FORTRESS implementation | ## Delivery sources | Source | Supports | Boundary | |---|---|---| | [Army SCI June solicitation](https://www.army.mil/article/293293/army_launches_tranche_ii_of_strategic_capital_initiatives_focused_on_energy_resilience) | seven-site private-generation model and 14-day requirement | solicitation | | [Army SCI September selections](https://www.army.mil/article/295486/army_announces_conditional_lease_solicitation_awards_for_commercial_power_generation_securing_installation_power_resilience) | six conditional developer/site pairings | not executed leases or plants | | [Army Janus selections](https://www.war.gov/News/News-Stories/Article/Article/4584583/army-selects-vendors-sites-for-nuclear-microreactors/) | five vendor/site pairings and milestone framework | not reactors in operation | | [NWS Crane MMR announcement](https://www.war.gov/News/Releases/Release/Article/4593065/department-of-war-announces-navys-first-advanced-nuclear-microreactor-deploymen/) | planned commercial MMR at NWS Crane by September 2028; joint Navy/Army Janus path and critical-operations purpose | announcement is not agreement, authorization, construction, criticality or accepted service | | [EO 14299](https://www.whitehouse.gov/presidential-actions/2025/05/deploying-advanced-nuclear-reactor-technologies-for-national-security/) | executive-agent and first-reactor direction | not authorization/build/operation | | [Eielson microreactor](https://www.eielson.af.mil/microreactor/) | up-to-5-MW critical-infrastructure proposal and NOITA state | negotiation/licensing path | | [Project Pele](https://www.energy.gov/ne/articles/department-defense-breaks-ground-project-pele-microreactor) | prototype construction/test path | not base power service | | [MCAS Yuma](https://www.mcasyuma.marines.mil/Photos/igphoto/2001696104/) | 100% current/projected requirement backup description | 2016–17 design/activation-era statement | | [MCAS Miramar](https://www.doncio.navy.mil/Chips/ArticleDetails.aspx?ID=14845) | completion, mixed sources, up-to-21-day description and mission-critical islanding exercise | design and observed test scopes differ | | [SUBASE New London](https://www.navy.mil/Press-Office/News-Stories/Article/3946004/subase-holds-ceremonial-ribbon-cutting-establishing-a-micro-grid-on-the-base/) | generation, first-right power and island controls | essential-function scope | | [Fort McCoy Main Gate](https://www.army.mil/article-amp/292947/fort_mccoy_opens_new_microgrid_to_strengthen_energy_resilience_at_main_gate) | operational gate-area microgrid and stated 14-day capability | not full installation | | [DLA Sigonella](https://cnreurafcent.cnic.navy.mil/News/News-Detail/Article/4496841/dla-distributions-new-microgrid-is-first-of-its-kind-in-navy-region-europe-afri/) | activated tenant microgrid and stated 14-day fuel-load capability | DLA facilities, not full NAS | ## Access and refresh notes - The official FORTRESS release and PDF should be recaptured when the publisher becomes directly reachable. - The current official AEPRR landing page lists reports only through FY2023; the reporting lag itself is a portfolio-visibility limit. - The current BSR is CUI/request-controlled. Use the public threshold and a future authorized covered list; do not reconstruct sensitive site coverage by inference.