Skip to content
Browse the whole research Library · Start page for AI agents ·

Existing-corpus audit — permanent magnets and rare-earth controls

.md · 1 sections · 5514 characters

Source, owner, and dates

workbench: Research Packages/Permanent Magnets/PERMANENT_MAGNET_EXISTING_CORPUS_AUDIT.md

Canonical source SHA-256: b08cd6166fa19dfeeac528396faa68c454de77355ee2d4d7bc8ce1404fbd15be

Served copy SHA-256: b08cd6166fa19dfeeac528396faa68c454de77355ee2d4d7bc8ce1404fbd15be

Owner evidence cutoffs: {"permanent-magnets": "2026-07-22"}

These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.

Owners: permanent-magnets

Existing-corpus audit — permanent magnets and rare-earth controls

Section 1 of 1

# Existing-corpus audit — permanent magnets and rare-earth controls

Vault reviewed: vault-root:/Freedom 250 Chronicle
Cutoff: 2026-07-22
Result: the vault has the geopolitical signal, but not yet the industrial entity/status map.

## Existing high-signal event notes

Vault event What it captured What is missing / needs correction Package join
2025-10-07-0140 - Burgum China controls rare earth refining.md public statement that China's control sits in refining, not only mining replace broad “20 minerals / 85–100%” shorthand with stage- and element-specific evidence; rare earth elements are not all minerals company registry + claims 2–4
2025-10-11-1345 - China rare earth crisis full picture explainer.md heavy-REE dependence, equipment/technology controls and defense/industrial exposure source is an X explainer with several unsupported or overextended claims; CIA theft, TSMC approval, universal buyer control and exact ten-year timeline are not established by the note claims 5–6; China watchboard
2025-10-11-1414 - MTG America rare earth mining obstacles.md domestic resource and permitting/political obstacles the attached USGS-style map covers many critical-mineral deposit types, not a map of immediately mineable magnet rare earths; mining does not close separation/alloy/magnet gaps factual stack stages 1–5
2025-10-13-1202 - BESSENT ON SUPPLY CHAINS RARE EARTHS GOING TO DO.md “Operation Warp Speed” processing intent needs operative-instrument map: MP deal, OSC loans, Commerce agreements, Project Vault, Section 232 and July 20 order state-market architecture + timeline
2025-10-15-1556 - JoeLange rare earth trade war decentralization theory.md narrative interpretation of supply-chain decentralization keep as interpretation; test against actual company builds, licensing and qualified tonnes watchboard branch logic
2025-12-15-1743 - tennessee critical minerals smelter.md large Korea Zinc/Crucible U.S. processing investment and public stake concept relevant to broad critical-mineral industrial policy, but not a rare-earth magnet plant; named material basket is mostly another lane claim 25
2026-01-17-1136 - US sets price floors for critical minerals.md shift toward state-supported pricing proclamation promoted negotiation and possible minimum prices; it did not enact one universal floor. MP's $110/kg contract is a separate object claims 18–19
2026-02-02-2144 - Trump announces 12bn critical mineral reserve.md Project Vault announcement split up-to-$10bn EXIM direct loan from approximately $2bn private capital; identify SPV, suppliers, OEMs, title and draw rules claim 17 + Project Vault watch

## Existing legal/policy spine already available elsewhere in the vault

The broader executive-action corpus already contains relevant anchors, including:

The new July 20, 2026 defense-supply-chain order postdates much of the existing synthesis and should be treated as a separate legal/qualification event if promoted.

## Missing company layer

The vault did not yet provide one controlled record covering:

## Missing clock layer

The existing notes tend to use one date for a whole development. The magnet package needs at least these clocks:

  1. export-control publication, effectiveness, license, shipment and suspension;
  2. grant/loan announcement, conditional commitment, final close and disbursement;
  3. site selection, construction, commissioning and nameplate;
  4. first article, customer qualification, first shipment and sustained output;
  5. merger signing, approval and closing;
  6. price-floor announcement, contract effectiveness and actual support payment.

## Recommended promotion posture

Do not create a top-level Magnets or Electromagnetism plotline on this first pass.

Recommended sequence:

  1. review the workbench package;
  2. promote one factual research note under the existing Technology/AI–Economy–China/Defense cross-cut;
  3. create/repair dated event notes only for operative milestones;
  4. link existing social-source events to the claim audit rather than overwriting their original content;
  5. let future event volume decide whether Permanent Magnets / Critical Materials earns a subplot.

## Exact proposed vault objects, if approved later

No vault files were changed in this sweep.