# Existing-corpus audit — permanent magnets and rare-earth controls

**Vault reviewed:** `vault-root:/Freedom 250 Chronicle`  
**Cutoff:** 2026-07-22  
**Result:** the vault has the geopolitical signal, but not yet the industrial entity/status map.

## Existing high-signal event notes

| Vault event | What it captured | What is missing / needs correction | Package join |
|---|---|---|---|
| `2025-10-07-0140 - Burgum China controls rare earth refining.md` | public statement that China's control sits in refining, not only mining | replace broad “20 minerals / 85–100%” shorthand with stage- and element-specific evidence; rare earth elements are not all minerals | company registry + claims 2–4 |
| `2025-10-11-1345 - China rare earth crisis full picture explainer.md` | heavy-REE dependence, equipment/technology controls and defense/industrial exposure | source is an X explainer with several unsupported or overextended claims; CIA theft, TSMC approval, universal buyer control and exact ten-year timeline are not established by the note | claims 5–6; China watchboard |
| `2025-10-11-1414 - MTG America rare earth mining obstacles.md` | domestic resource and permitting/political obstacles | the attached USGS-style map covers many critical-mineral deposit types, not a map of immediately mineable magnet rare earths; mining does not close separation/alloy/magnet gaps | factual stack stages 1–5 |
| `2025-10-13-1202 - BESSENT ON SUPPLY CHAINS RARE EARTHS GOING TO DO.md` | “Operation Warp Speed” processing intent | needs operative-instrument map: MP deal, OSC loans, Commerce agreements, Project Vault, Section 232 and July 20 order | state-market architecture + timeline |
| `2025-10-15-1556 - JoeLange rare earth trade war decentralization theory.md` | narrative interpretation of supply-chain decentralization | keep as interpretation; test against actual company builds, licensing and qualified tonnes | watchboard branch logic |
| `2025-12-15-1743 - tennessee critical minerals smelter.md` | large Korea Zinc/Crucible U.S. processing investment and public stake concept | relevant to broad critical-mineral industrial policy, but not a rare-earth magnet plant; named material basket is mostly another lane | claim 25 |
| `2026-01-17-1136 - US sets price floors for critical minerals.md` | shift toward state-supported pricing | proclamation promoted negotiation and possible minimum prices; it did not enact one universal floor. MP's $110/kg contract is a separate object | claims 18–19 |
| `2026-02-02-2144 - Trump announces 12bn critical mineral reserve.md` | Project Vault announcement | split up-to-$10bn EXIM direct loan from approximately $2bn private capital; identify SPV, suppliers, OEMs, title and draw rules | claim 17 + Project Vault watch |

## Existing legal/policy spine already available elsewhere in the vault

The broader executive-action corpus already contains relevant anchors, including:

- EO 14241, March 20, 2025 — immediate measures to increase American mineral production;
- April 15, 2025 Section 232 investigation order;
- January 14, 2026 Proclamation 11001 on processed critical minerals and derivative products;
- Project Vault material;
- critical-mineral and China-trade events.

The new July 20, 2026 defense-supply-chain order postdates much of the existing synthesis and should be treated as a separate legal/qualification event if promoted.

## Missing company layer

The vault did not yet provide one controlled record covering:

- actual U.S. magnet production and shipment states for Noveon, MP and eVAC;
- USAR commissioning versus future 10,000-tpa capacity;
- Vulcan/ReElement conditional finance versus operating output;
- Energy Fuels, Lynas, Neo, Iluka, Serra Verde and LCM as distinct upstream/midstream nodes;
- Asian incumbents JL MAG, Ningbo Yunsheng, Zhong Ke San Huan, Shin-Etsu, Proterial and TDK;
- SmCo specialists Permag/EEC and Arnold;
- customers GM, Apple, ABB and Nidec as qualification/offtake nodes;
- commodity traders and inventory finance inside Project Vault.

## Missing clock layer

The existing notes tend to use one date for a whole development. The magnet package needs at least these clocks:

1. export-control publication, effectiveness, license, shipment and suspension;
2. grant/loan announcement, conditional commitment, final close and disbursement;
3. site selection, construction, commissioning and nameplate;
4. first article, customer qualification, first shipment and sustained output;
5. merger signing, approval and closing;
6. price-floor announcement, contract effectiveness and actual support payment.

## Recommended promotion posture

Do **not** create a top-level `Magnets` or `Electromagnetism` plotline on this first pass.

Recommended sequence:

1. review the workbench package;
2. promote one factual research note under the existing Technology/AI–Economy–China/Defense cross-cut;
3. create/repair dated event notes only for operative milestones;
4. link existing social-source events to the claim audit rather than overwriting their original content;
5. let future event volume decide whether `Permanent Magnets / Critical Materials` earns a subplot.

## Exact proposed vault objects, if approved later

- `02 - Research/Permanent Magnets — Company and Control Map.md`
- `04 - Synthesis/Cross-cuts/Permanent Magnets — Factual Timeline.md`
- `01 - Events/2026-07-20-.... - Defense critical-material sourcing and qualification order.md`

No vault files were changed in this sweep.